SOLUTIONS TO MANAGERIAL ACCOUNTING EXERCISES 13

Solutions to Managerial Accounting Exercises

Student’s Name:

Course Name & Number:

Instructor’s Name:

Institution:

Date Submitted:

Chapter 5: Activity-Based Costing and Management:

Exercise 5-26 Page 201

1. Under a costing system that allocates overhead on the basis of direct-labor hours, the material-handling costs allocated to one lens would be what amount?

Material-handling cost per lens:

$50,000 x 200 = $1,000

[(25x200) ÷ (25x200)]A

A Direct-labor hour’s total number

Therefore, material-handling cost per lens is $1,000

2. Answer the same question a in requirement (1), but for mirrors.

Material-handling cost per mirror:

$50,000 x 200 = $1,000

[(25x200) ÷ (25x200)]A

A Direct-labor hour’s total number

Therefore, material-handling cost per mirror is $1,000

3. Under activity-based costing (ABC), the material-handling activity costs allocated to one lens would be what amount? The cost driver for the material-handling activity is the number of material moves.

Material-handling cost per lens:

[($50,000 ÷ (5 + 15)*)] x 5** = $500

25

Where: * Material moves’ total number

** The lens product line material moves’ number

Therefore, the material-handling cost per lens is $500

4. Answer the same question as in requirement (3), but for mirrors

Material-handling cost per mirror:

[($50,000 ÷ (5 + 15)*)] x 15** = $1,500

25

Where: * Material moves’ total number

** The mirror product line material moves’ number

Exercise 5-27 Page 201

1. Calculate the monthly quality-control cost to be assigned to the Satin Sheen product line under each of the following product-costing systems. (Round to the nearest dollar)

a. Traditional system, which assigns overhead on the basis of direct-labor cost

Quality-control costs = 14.5% x Direct-labor Costs

Quality-control costs assigned to Satin Sheen line = 14.5% x $27,500

= $3,988

b. Activity-based costing

Activity:

Pool Rate:

Quantity for Satin Sheen:

Assigned Cost

Incoming material inspection

$11.50 Per Type

12 Types

$138

In-Process Inspection

0.14 Per Unit

17.500 Units

$2,450

Product Certification

77.00 Per Order

25 Orders

$1,925

Total Quality-Control Costs Assigned

$4,513

2. Does the traditional product-costing system overcost or undercost the Satin Sheen product line with respect to quality-control costs? By what amount?

The traditional product-costing system undercosts Satin Sheen product line with respect to quality-control costs, by $525 = $4,513 - $3,988

Exercise 5-28 Page 202

1. Divide these costs into activity cost pools, and identify a cost driver for assigning each pool of costs to products. Calculate the total cost in each activity cost pool.

Cost Pool 1: Unit-Level I

Raw materials and components 2,950,000 Yen

Inspection 30,000 Yen

Total Cost 2,980,000 Yen

Cost driver for assigning pool 1 is raw-material cost

Cost Pool 2 : Unit-Level I

Depreciation, Machinery 1,400,000 Yen

Electricity, Machinery 120,000 Yen

Equipment Maintenance, Wages 150,000 Yen

Equipment Maintenance, Parts 30,000 Yen

Total Cost 1,700,000 Yen

Cost driver for assigning pool 2 is number of units produced

Cost Pool 3: Batch-Level I

Setup Wages 40,000 Yen

Total Cost 40,000 Yen

Cost driver for assigning pool 3 is number of production runs.

Cost Pool 4: Product-Sustaining Level

Engineering Design 610,000 Yen

Total Cost 610,000 Yen

Cost driver for assigning pool 4 is product parts number

Cost Pool 5: Facility-Level I

Depreciation, Plant 700,000 Yen

Insurance, Plant 600,000 Yen

Electricity, Light 60,000 Yen

Custodial Wages, Plant 40,000 Yen

Property Taxes 120,000 Yen

Natural Gas, Heating 30,000 Yen

Total Cost 1,550,000 Yen

Cost driver for assigning pool 5 include costs allocated towards supporting departments, costs allocated to products, square footage, and number of nits manufactured.

Exercise 5-33 Page 203

The activities of Finger Lakes Winery can be classified as:

U: Unit-level I

B: Batch-level I

P: Product-sustaining-level

F: Facility-level

Activity:

Classification:

(1)

P

(2)

P

(3)

P

(4)

P

(5)

P

(6)

P

(7)

P

(8)

B

(9)

B

(10)

B

(11)

B

(12)

B

(13)

U

(14)

U

(15)

U

(16)

U

(17)

B

(18)

F

(19)

F

Exercise 5-34 Page 204

Choose two activities or accounts from each of the four classifications and explain why you agree or disagree with the ABC project team’s classification.

Carrier Corporation for each of the activity levels the definitions that include:

· Unit: occurs every time a unit is produced. For example utility cost for production equipment. It more often than not relates directly to production volume

· Batch: performed for each batch acquired as well as produced. For example, moving raw materials between the production line and stock room, besides setting-up a machine for a run.

· Product-sustaining: performed towards maintaining product designs, parts, models, and processes. For example, maintaining materials bill, expediting parts and issuing product changes orders. To support key manufacturing capability besides process, sustaining activities are mandatory.

· Facility: performed towards enabling production. Therefore, at the most basic level they are fundamental towards supporting the business entity. For example cleaning and managing the structure.

Without a doubt, these definitions are consistent with those provided in the chapter. An argument for the ABC project team’s classification would be that the activity was characterized by the activity-level classification definition. An argument against the ABC project team’s classification would be that the specific activity did not satisfy the definition. For instance, conveying materials is a batch-level activity for the reason that a raw material should be shifted to the product location whenever a production batch besides run is commenced. Whereas, a facility-level account includes depreciation since plant and equipment correspond to the production facilities provision cost in which manufacturing can occur.

Exercise 5-35 Page 204:

1. Prepare a schedule showing Redwood Company’s total selling cost for each order size and the per-skein selling cost within each order size.

Redwood Company

Selling Costs Computation by Order Size and Skein within Each Order Size

Order Size

Small

Medium

Large

Total

Sales CommissionsA[Unit Cost: $675,000/225,000 = $3.00 Per Box]

$6,000

$135,000

$534,000

$675,000

CatalogsB [Unit Cost: $295,400/590,800 =$0.50 Per Catalog

127,150

105,650

62,600

295,400

Costs of Catalog SalesC [Unit Cost: $105,000/175,000 = $0.60 Per Skein]

47,400

31,200

26,400

105,000

Credit and CollectionD [Unit Cost: $60,000/6,000 = $10 Per Order

4,850

24,150

31,000

60,000

Total Cost Per Order Size

$185,400

$296,000

$854,000

$1,135,400

Units [Skeins] SoldE

103,000

592,000

2,180,000

Unit Cost Per Order SizeE

$1.80

$0.50

$0.30

A Retail Sales in Boxes x Unit Cost:

Small: 2,000 x $3

Medium: 45,000 x $3

Large: 178,000 x $3

B Catalogs Distributed x Unit Cost

C Catalog Sales x Unit Cost

D Number of Retail Orders x Unit Cost

E Small: [2,000 x 12] + 79,000 = 103,000

Medium: [45,000 x 12] + 52,000 = 592,000

Large: [178,000 x 12] + 44,000 = 2,180,000

Total Cost Per Order Size ÷ Units Sold

2. Explain how the analysis of the selling costs for skeins of knitting yarn is likely to impact future pricing and product decisions at Redwood Company.

Selling costs analysis demonstrates that small orders cost more than large orders; which could influence management towards marketing large orders more insistently as well as offering discounts for them.

Chapter 6: Activity-Analysis, Cost Behavior, and Cost Estimation:

Exercise 6-25 Page 259:

1. Use the high-low method to estimate the company’s energy cost behavior and express it in equation form.

The High-low Method:

Variable Cost/Pint = (Energy cost @ High level – Energy Cost/Pint @ Low Level)

(High Level – Low Level)

= (24,100 – 22,100)

(41,000 – 21,000)

= $2,000 ÷ 20,000 Pints Produced = $0.10/Pint

Total Cost @ 41,000 Pints = $24,000

Less Variable Cost @ 41,000 Pints (41,000 x $0.10) = $4,100

Fixed Cost = $20,000

Let:

Y represent Total Energy Cost

X represent Number of pints produced

Y = 0.10X + $20,000

2. Predict the energy cost for a month in which 26,000 pints of applesauce are produced.

Y = 0.10X + $20,000

Y = (0.10 x 26,000) + $20,000 = $22,600

Therefore, the energy cost for a month in which 26,000 pints of applesauce are produced is $22,600

Exercise 6-30 Page 261:

1. Use the high-low method to estimate the variable cost per tour mile traveled and the fixed cost per month.

Variable Cost/tour mile = (12,500 – 11,000)/(20,000 – 8,000)

= 1,500 ÷ 12,000 = 0.125 per tour mile

Total Cost = $12,500

Total Variable Cost = 0.125 x 20,000 = (2,500)

Fixed Cost = 10,000 real

2. Develop a formula to express the cost behavior exhibited by the company’s maintenance cost.

Let Y represent Total cost

Let X represent Tour miles driven

Therefore, Y = 10,000 + 0.125x

3. Predict the level of maintenance cost that would be incurred during a month when 22,000 tour miles are driven. Remember to express your answer in terms of the real).

Using Y = 10,000 + 0.125x

Y = 10,000 + 0.125 x (22,000) = 12,750 real

Therefore, the level of maintenance cost that would be incurred during a month when 22,000 tour miles are driven is 12,750 real

4. Build a spreadsheet: Construct an Excel spreadsheet to solve all of the preceding requirements. Show how the solution will change if the following information changes: in March there were 21,000 miles traveled and the cost was 12,430 real.

The level of maintenance cost could exceed the cost.

Problem 6-35 Page 263:

For each of the cost items described below, choose the graph (see below) that best represents it.

1. Graph (e)

2. Graph (a)

3. Graph (g)

4. Graph (c)

5. Graph (b)

6. Graph (h)

7. Graph (i)

8. Graph (f)

9. Graph (d)

10. Graph (k)

11. Graph (l)

Reference:

Hansen, D.R., & Mowen, M.M. (2017). Managerial accounting (8th ed.). Boulverd Mason, OH: Thomson Higher Education.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Smart Tutor
Isabella K.
Top Academic Tutor
Accounting & Finance Mentor
George M.
Unique Academic Solutions
Writer Writer Name Offer Chat
Smart Tutor

ONLINE

Smart Tutor

I have read your project details and I can provide you QUALITY WORK within your given timeline and budget.

$29 Chat With Writer
Isabella K.

ONLINE

Isabella K.

I have read your project description carefully and you will get plagiarism free writing according to your requirements. Thank You

$37 Chat With Writer
Top Academic Tutor

ONLINE

Top Academic Tutor

I reckon that I can perfectly carry this project for you! I am a research writer and have been writing academic papers, business reports, plans, literature review, reports and others for the past 1 decade.

$24 Chat With Writer
Accounting & Finance Mentor

ONLINE

Accounting & Finance Mentor

After reading your project details, I feel myself as the best option for you to fulfill this project with 100 percent perfection.

$23 Chat With Writer
George M.

ONLINE

George M.

I am an elite class writer with more than 6 years of experience as an academic writer. I will provide you the 100 percent original and plagiarism-free content.

$35 Chat With Writer
Unique Academic Solutions

ONLINE

Unique Academic Solutions

I have done dissertations, thesis, reports related to these topics, and I cover all the CHAPTERS accordingly and provide proper updates on the project.

$28 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

In the shadow of time piano premonitions parallels - Absolute location of asia - Graphic organizer. - Accident investigation techniques 2nd edition pdf - Netapp access based enumeration - An individual's unique constellation of consistent behavioral traits - Tata motors project conclusion - Aco qmax data sheet - 19-21 ashley avenue hoppers crossing - Knowledge Gaps in Applying Evidence to Practice - 27 Mastering Biology assignments - Trigonometry of obtuse angles - Help - Morehead cain scholarship essays - How to determine conductivity of a compound - The nazis were furious when italy surrendered and they ______ - Alexander kielland oil rig disaster - Three stooges stuffing a turkey - Equifax data breach 2017 case study - Usps mail fraud report - D8: School pregnancy - Weed and seed declaration - What are two equivalent fractions for 3 8 - Excel independent project 1 6 - Escience lab 14 mendelian genetics answers - Feast watson floor finish applicator - Patient case scenarios for nurses - 4 types of clouds worksheets - Unit 4 Part 2 - PKI and Encryption at Work - I need a website built - Sam cengage excel project 2 - Swales definition of a discourse community - Pressure measuring devices ppt - The british airways swipe card debacle case study - Discussion - Write an essay for my Africana Studies Course 3-5 pages Double Spaced - How to calculate comparative advantage - Final Research Paper - How to calculate total factor productivity in excel - Apuls - Essay - Clipsal smoke alarm warranty - Internet systems development software technologies - Avi50115 diploma of aviation air traffic control - Smoke dza cloud making machine lyrics - Macbeth act 4 scene 3 - Organizational Ethical Analysis Presentation - Reciprocal lattice of bcc is fcc proof - Dresser valves south africa - Mind life clinic ballarat central vic - Criminal justice - Provider sponsored organization gatekeeper or open access - Acceptance and commitment therapy handouts - There are 3 specific classes for all fingerprints - Electromagnetic induction physics lab report - 2 methods for evaluating evidence - Campbellsville university dso - How to calculate cp in excel - Where we stand class matters analysis - Kohler insight learning theory ppt - Reflective essay regarding the personal recovery for people living with a psychotic disorder - Awakenings movie questions and answers - History - Assignment - Duncan and toplis skegness - Public and private families an introduction 7th edition pdf - Ford motor annual report 2018 - Rolex brand audit - Structural Analysis good tutor only - The roman colosseum functioned as a large "audience hall"--a place for governmental meetings. - Which end of a diode is positive - R6 - Is the executive summary on a separate page - Kilkenny county council jobs - Rights and responsibilities lens - St andrews human resources - What is the electron configuration of nitrogen - Planning Envionments - Research and writing del 1 - Discussion / about 200 words / need in 24 hours / Answer and comment on others - Santo nino gugma ko lyrics - How to create a multimedia presentation in powerpoint - Bulky waste pick up canberra - One night the moon racism - Federal Government paragraph - Principles of comparative politics clark - Shree swaminarayan prasadi mandir bhuj gujarat - Shirley jackson the lottery meaning - Do you quarrel sir - What is the efficient scale of the painting company - The cherokee removal a brief history with documents summary - Immigrants by pat mora - Words for oh holy night - Things that were invented in the 1920s - Click and clone mimi the mouse answer key - Abiotic factors in a desert ecosystem - Difficult conversations how to discuss what matters most epub - The first american to enjoy an international literary reputation was - Discover psychology 2.0 a brief introductory text