Elmwood Park Road
Resurface/Repair Project
|
Item/Description
|
Quantity UNIT
|
Unit Cost
|
Total Cost
|
Excavation
|
2
|
275
|
550
|
removing concrete
|
24
|
627
|
15048
|
Removing asphalt
|
2
|
1356
|
2712
|
Removing light poles
|
114
|
416
|
47424
|
Concrete surface milling
|
2
|
500
|
1000
|
installing new signs
|
5
|
400
|
2000
|
Pouring asphalt
|
12
|
517
|
6204
|
Pavement marking paint
|
30
|
1084
|
32520
|
Paint striping
|
90
|
725
|
65250
|
installing new light poles
|
13
|
809
|
10517
|
Total Construction Cost
|
|
|
183225
|
Design Cost
|
|
|
5496.75
|
Contingency
|
|
|
54967.5
|
Total Project Cost
|
|
|
243689.25
|
For
the resurfacing of the road first the road will be excavated to make room for
the new asphalt surfacing. 2 machines are decided to use for the excavation of
the road. NDOT sources are being used for evaluating the unit cost of the
excavation. On the road 5 new signs are going to be installed which have estimated
price of 400 each.
In the above figure it
can be seen that the road is approximately 1 km long.