Complication enablers are associated
with diversity, changes, and cross-linkage of all the contents. In case all the
characteristics are combined then it possesses a higher ratio and highly
complicated system is a feature of compliance enabler ( Schuh, 2005). Consider
the situation in which the dynamics are lower in the provided project then it
becomes highly complicated. This concept is independent of other crosslinking
conditions and diversity.
The Phalinza model was
proposed by Schwarz (2011) that contained different components of complication.
The various elements in certain situations were composed of constellations and
their features are highly self-dynamic intensive communication, and strong
cross-linkage. The model mainly demonstrates difficulties in the process of
prediction and the analysis of the project for the related task (Schwarz,
2011).
The Phalinza model is mainly a
type of abstract and the literature have a significant condition to offer the
endless complication and number of enablers. The list provided below contains all
the broadly used conditions and terms of enablers.
The dimension of the project (size) and organization
(assets/people)
The interface of external and internal parts of the
projects, environment, and company functions.
Requirements of all the customers including
functionalities, specified on the basis of country, and individualization.
Dynamics of the market including flexibility and the
competition.
Change associated with the market and organization
Cooperation of the companies and the number of
stakeholders working in the company.
Diversity in the product and the technical processes
Rules and regulations or legislative terms and conditions.
Time for the market and change in the time or schedule
Facilities provided across countries and international
conditions
Diversity in process and culture
Change in process and methods
Variation in political conditions
Diversity in the technologies
Marketing around the globe
Innovative methods in the organization for the production
process
Production process and the depth of production
Economical changes along with crises
Organization of data, storage of data, distribution of the
data, and care for the processes.
Different types of new materials
Diversity in economic conditions and KPIs.
Change in the infrastructure, consumer structure, and the
demographical changes
Changes and diversity in the process
Activities under the limited timeline
Certain types of virtual techniques
Incompatible tools and the systems
Responsibilities, competencies, and division of work
With the revolution of
information technology, new and innovative systems can be designed to have
access to the information that is frequently actualized and enhanced under
different conditions. The change is mainly dynamic that depends on the nature
of the market. The companies are highly flexible with the process of production
and under global perspectives (Sargut& Gunther McGrath, 2011). The main
trend is to reduce the limitation and to enhance the implementation process for
the available data. The project managers operate under different conditions and
in the international arena as well. The real conditions are prepared to deal
with the complication enablers that are often provided in the literature
(Scheiter et al., 2007).