The
production of the power from the waste is one of the most challenging tasks in
the developing countries. There are many of the developing country are there
are that are shifting their power needs through solid waste material and the biomass.
In this report, there is a detailed discussion on the project of the waste to
energy. In the few new year’s, the use of the solid waste material for the
power generation in increasing. The developing countries like China and India
are using this method for the generation of electricity and in the long run
this techniques of power generation would be prove very beneficial for the
country’s economies. With the increase in the population the solid waste and
energy demands are increasing and the method of waste to energy would not only help
the countries to get rid of the massive waste produces annually but also allow
to use this waste for in more productive way (Ike, et al., 2010).
In this report, there is a feasible study and
the market research about the waste to energy project to know about the scope
of the project that is going to be made. For the implementation of the new
project of power generation from the waste, it is very important to cost and
budget of the project, so that all aspects of the power generation project can
be handle prior to time. It is obvious because the solid waste and biomass
would be used for the generation of electricity under this project so, the
overall finances of this project is expected to be less than other methods of generating
the electricity.
In the paper the complete schedule and plan
for the implementation of the project would be made, so that the scope and the
credibility of the overall project can be evaluated. All of the risk relation
to the waste to energy project are evaluated in this report that would help to
mitigate the risks effectively if they happen during the implementation of the
project. The stakeholders are also the main drivers of this projects and the
detail about all of the stakeholders of the project is also discussed in this
paper (PrachuabPeerapong &
Limmeechokchaib, 2016).
Project Description
The
waste to energy project would use the solid waste and biomass for the
generation of electricity. This power
product plant will be implement on the local level by using the local waste
including solid and biomass. Under this
project, the contract is made with many company which are producing plastic and
other solid waste to be used in the product of the electricity in the waste to
energy project. For the generation of electricity the biomass would include
cardboard,
paper, grass clippings, food waste, wood, leather products and leaves and
non-biogas material includes synthetic materials made from petroleum materials for
example metals and glass.
References of Produce Power from Waste Project
Ike, M. et al., 2010. Microbial population dynamics
during startup of a full-scale anaerobic digester treating industrial food
waste in Kyoto eco-energy project. Bioresource Technology, Volume 101,
p. 3952–3957.
PrachuabPeerapong
& Limmeechokchaib, B., 2016. Waste to Electricity Generation in Thailand:
Technology, Policy, Generation Cost, and Incentives of Investment. ENGINEERING
JOURNAL, Volume 20.