The project of the power production by using the waste management have a lot of potential in the conning future because as it is known that the demands of the electricity is increasing and there is a need to find more convenient ways to produce the electricity. with the increasing pollution all around the world the waste of plastic and biomass is becoming a global issue and because of the increasing waste the landfilling trends is also increasing. Now there is a need to come up with the ways to manage the waste that are more sustainable and not cause any damage to the natural resources. By using the waste material for the energy production not only the demand of the energy can be fulfilled but the waste can also be management. on the other side, the production of the energy by using the waste material is also have a good scope for the developing economies in the future.
4.2 Cost/Budget Analysis
In the waste to energy project a lot of cost control management is needed. The overall waste to energy project planning actions helps to recognize the responsibilities that needed to be assign and completed related work. For controlling the cost in the construction project of waste to energy project the total cost must be distributed into tasks and reporting actions establish to track project cost while the company implementing it. The capital cost that is needed to start the waste to energy project is approximately 10 billion USD. The close cost of waste to energy project can be control with rules of signature for payments and production of electricity. Other than the capital cost the variable cost of the waste to energy project is also very high depending on complexities during and after the project implementation. The manager also make sure that all of the purchase orders are properly sign to exactly know how much costs the waste to energy project is generating. If the signature of the manager is required for payments, you have control increasing costs to the project (Haughey, 2018).
4.3 Quality aspects
In the waste to energy project management it is very important to maintain the quality of materials and machinery used in the production of energy through waste project. In the quality control there are three parts. First is to identify the quality, make sure that purchase orders identify quality of the finished product. When responsibility of the project is assign in planning stage, it is also very important to assign liability for more quality and for necessary certification. For every item, the certification has to contain the particular quality level for the project, consequent order and the ensuing report inspection (Markgraf, 2018).
4.4 WBS