The assembly point for the company
is Shenzhen, and now all of above-mentioned components needs to reach the
assembly point. Following costs have been measured to do so:
DHL, 40ft container (TL), truck,
3 days, $4,896.87
It means that via truck, all components
will reach their assembly point in three days and total cost will be $4,896.87.
The company needs to look at this cost, and find any possible alternative
Plastic Moldings from Mumbai to Assembly Point in Shenzhen:
iContainers, 20ft container,
ocean freight, 7-10 days, $500
It is interesting to see that a
global supply coming from India to Shenzhen is costing less because ocean
freight is used, but supply days are more than any other service.