In 1 Tucson AZ or 2 Minneapolis MN
the church was designed, the blueprints were provided to our firm for the
proper designing of air conditioning system. The worship services are holding
heach Sunday on the weekly basis. In case of services the perimeter rooms and
sanctuary rooms are occupied. During the week the sanctuary system will be
fully occupied. Besides this the pastoral and administrative rooms are occupied
on the daily basis. The building can be further subdivided into appropriate
zones and the design of heating system will be based on the size of church and
external temperature that is atmospheric temperature [1].
The present work is based on the analysis of
heat system on the basis of numerical system. The cathedral ceiling is intended
at 100 and the height of outer wall was 9’. The report provides
information about the recorded temperature, additional data that is extracted
for the pipe temperature in the building of church. The method is developed to
analyze electricity used by the boilers, and system developed for the water
filled radiators [2].
The recording includes building
temperature patterns. The traditional wet system by the radiators and operation
of pipework is operated by the advance type of gas fired boiler and the modern
controller. The controller works on the base of thermostatic, humidistat, and
timing equipment’s. The use of oil is emerging as alternative of fuel instead
of gas supply. The churches are of medium size therefore electrical heating is appropriate
way but it would not work if frequent services and several Sunday services are
given on weekly basis [3].
On the basis of modern technology
for heating process of church, the appropriate alternative for heating system are
ground source heat pumps and air source heat pumps that operates in the
buildings of church. A special committee was designed to evaluate optimal
heating process that can be implemented in the systems of churches. The general
parameters under consideration of committee are reversibility, visibility,
durability, technology considerations and longevity [4].
References of HVAC project
[1]
|
M. Galarraga,
"Heat balance of a historical church Transmission losses," SUSTAINABLE
DEVELOPMENT, vol. 01, no. 01, pp. 01-45, 2014.
|
[2]
|
Chichester.
anglican. org, "HEATING YOUR CHURCH," 01 09 2012. [Online].
Available:
https://www.chichester.anglican.org/media/documents/document/2012/09/DAC_Heating.pdf.
|
[3]
|
Blackburn.
anglican. org, "Church heating study report," 2018. [Online].
Available:
https://www.blackburn.anglican.org/storage/general-files/shares/Resources/Church%20buildings%20land/Church%20Heating/Heating_Study_Report.pdf.
|
[4]
|
Ritewayac. com,
"Air Conditioner Maintenance, Air Conditioning Service & AC
Service in Tucson, AZ," 2018. [Online]. Available:
https://www.ritewayac.com/air-conditioning-service-tucson/.
|