PE2
ENGINEERING APPLICATION ABILITY
|
PE2.1 Application of established engineering methods to complex
engineering problem solving
|
·
I compared tender
drawings and shop drawings.
·
I checked the
compliance of shop drawings of onsite.
·
I monitored the project
weekly.
·
I documented the
dates.
·
I reviewed the
mechanical and electrical drawings as well.
·
I used AutoCad for
designing.
|
2.1,
2.2, 2.3, 2.5, 2.11, 3.3
|
PE2.2 Fluent application of engineering techniques, tools and
resources
|
·
I used AutoCad for
designing.
·
I used MS
PowerPoint for presenting designs.
·
I used MS Word for
projecting data.
·
I used STAAD for
designing.
|
1.2.1,
1.2.2, 1.3.2, 1.3.3, 1.3.4, 2.11, 3.3, 3.2
|
PE2.3 Application of systematic engineering synthesis and design processes
|
·
I made sure that IR
is raised.
·
I checked the
drawing while continuing the steel erection.
·
I specified the
thickness of layers at underground parking.
·
Furthermore, I made
sure to check the windows as well.
|
2.11,
3.4, 2.9, 2.10, 3.5
|
PE2.4 Application of systematic approaches to the conduct and
management of engineering projects
|
·
My main aim was
meeting all requirements.
·
I ensured that
designs were perfect while specifications of windows were met as well.
·
I started the rood
cradling as well.
|
2.1,
2.2, 2.3, 1.3.2, 1.3.4, 2.11, 3.6
|
PE3
PROFESSIONAL AND PERSONAL ATTRIBUTES
|
PE3.1 Ethical conduct and professional accountability
|
·
I shared ideas with
my team which led us to efficient results.
·
I presented my
ideas to the designer so to get the feedback.
·
When there was a
problem with bolts, I exchanged views and decided upon using chemical bolts.
|
1.2.2,
1.4.1, 1.3.3, 2.10, 3.5
|
PE3.2 Effective oral and written communication in professional and lay
domains
|
·
I used MS Word
skills for documenting.
·
I relied on my
ability to present through MS PowerPoint.
·
I updated the
designer as well about the new points.
|
2.9,
2.1, 1.2.2, 3.2
|
PE3.3 Creative innovative and proactive demeanour
|
·
I used chemical
bolts.
·
I assembled and
erected one time which helped in saving time.
·
I used for AutoCad
along with other techniqus as well.
|
3.6,
2.9, 1.3.4
|
PE3.4 Professional use and management of information
|
·
I checked designs
again for ensuring their accuracy.
·
When it came to
dimensions, I cross-checked them.
·
I kept the designer
updated.
|
2.7,
2.1, 1.3, 3.6, 1.3.4, 2.11
|
PE3.5 Orderly management of self, and professional conduct
|
·
I made sure to
finish the task according to the deadline.
·
I used the approach
that could assure the saving of money.
·
I monitored the
progress properly.
|
2.12,
2.11, 3.6, 3.8, 1.3
|
PE3.6 Effective team membership and team leadership
|
·
I checked designs
again to make sure that building is able to resist.
·
I made sure that
right building was selected so that occupants wouldn’t be disturbed at all.
·
Made sure that I
met expectations efficiently while respecting all those who contributed in my
work
|
3.7,
3.8, 1.3.3, 2.12, 3.6, 2.9, 1.3.4, 2.7, 2.5
|