In the above table
the activities are as below:
A= Clearing site,
B= Support pilings, C=Demolish, D= Set up construction site, E= Pouring of
lower concrete, F= Main concourse, G=Installation of playing field, H=
Construction of upper steel bowl, I= Luxury boxes, J= Seat’s installation, K=
Installing Jumbo Tron, L=Stadium infrastructure, M= Steel canopy construction,
N= Installation of lights, O= Roof track building, P= Construction of roof at
separate site, Q= Roof track installation, R= Operational roof, S= Inspection of
stadium.
Source: (Atozmath, 2019)
Reference of Network diagram by
using Microsoft project (Software)
Atozmath. (2019). AtoZmath. Retrieved from https://cbom.atozmath.com/CBOM/PertCPM.aspx?q=1.2&q1=A%3bB%3bC%3bD%3bE%3bF%3bG%3bH%3bI%3bJ%3bK%3bL%3bM%3bN%3bO%3bP%3bQ%3bR%3bS%60-%3bA%3bB%3bC%3bD%3bD%2cE%3bD%2cE%3bD%2cE%3bF%2cH%3bF%2cH%3bF%2cH%3bF%2cH%3bJ%3bM%3bE%3bO%3bO%2cP%3bO%2cP%2cQ%3bA%2cB%2cC%2cD%