As it has been known that fast tracking is
the technique in which activities will be perform under a sequence utilizing the
actual schedule and it has been performed in parallel. In some other words it
can also be said that fast tracking as a project has bene taken as in the meaning
of actions which has been work on instantaneously despite from waiting for
every piece to be done distinctly. Despite from this fast tracking would only
be implemented if the activities which has been presented in the question would
really (Long, 2016) be covered. As well as if anyone required to bandage a schedule then
they should take into account about this technique mainly because fast tracking
mainly did not include any type of cost. This technique is simply rearranging
the activities in their actual schedule. On the other hand, crashing is the
technique which has been utilized while the fast-tracking technique did not
save more time on the project schedule. As well as along with this technique resources
have been added within the project up to the least possible cost. In this
schedule and cost tradeoffs and these has been analyzed to evaluate and how to
get the highest amount of compression for the recent cost of increment. Moreover,
it has been noticed that crashing is (Ballesteros & Elamrousy,
2019)
quite effective due to more resources which has been added in to the project. The
crashing technique analyzes and classified activities on the reduced crash in
each cost which is unit per time, which sanction the team working the project
to investigate the activities which would be able to deliver most valuable.
In
this it has been mentioned that the reality of project management is that which
is required to poultice the project schedule and to give the project’s product,
services and findings sooner than actual planned. Schedule are consistently
subjected to modify, in most of the cases it has been said that schedules often
get longer as be contrasting to getting shorter, and it can negatively affect
the actual schedule just because the project team would not be able to complete
it in the given time. After viewing all these situations, the project manager should
have the professional duties to ensure that project is obtained through proper
planning. As well as if anyone required to bandage a schedule then they should
take into account about this technique mainly because fast tracking mainly did
not include any type of cost. This technique is simply rearranging the activities
in their actual schedule. In tis they should have to utilize schedule compression
technique to evaluate the required project completing date which could be meet.
As well as the projects loose associates the serious path with an compulsory
date which has been given by the organization, if the project loose has been
negative, then they have an option to moreover perform crashing or fast-track
to make sure that the project has been completed on the given time as required by the
administration. thus, there would not be any variations in the complex way. (Ballesteros P. , 2017)The two significant
Schedule Compression Techniques (Fast-Tracking and Crashing) has been utilized
by the Project Manager while in the lifecycle of the Project from Project Beginning
to the Project Conclusion to bring back the project in streak with the Agenda Starting
point without altering the project Possibility.
References on Fast tracking and crashing in project management
Ballesteros, P. (2017). Modelling the boundaries of project
fast-tracking. Automation in Construction , 231-241.
Ballesteros, P., & Elamrousy, M. K. (2019). Non-linear
time-cost trade-off models of activity crashing: Application to construction
scheduling and project compression with fast-tracking. Automation in
Construction , 229-240.
Long, N. (2016). Fast-tracking and crashing projects:
Comprehensive analysis of reasons and of implementation strategies. springer
.