11.5

Baker Mfg. Inc (see table 11.9) wishes to compare its inventory turnover to those of industry leaders wou have turnover of about 13 times per year and 8% of their assets invested in inventory

Arrow Distributing Corp

NET Rev. $16,500

Cost of sales $13,500

inventory $1,000

Total Assets $8,600

Baker MFG. INC

Net rev $27,500

Cost of sales $21,500

inventory $1,250

total assets $16,600

A) What is Baker's Inventory Turnover?

Inventory turnover ratio = Cost of good sold/ inventory investment

Inventory turnover = $21,500/$1,250 = 17.2

B) What is Baker's percent of assets committed to inventory?

Percent invested in inventory = (total inventory investment/total assets) * 100

Percent invested in inventory = ($1,250/$16,600) * 100 = 7.53 %

C) How does Baker's performance compare to the industry leaders?

8%-7.53% 0.47

Compared to the industry leaders, Baker's performance is very low because they are .47% lower than the industry leaders performance

Good job

S11.4

Johnson Chemicals is considering two options ofr its supplier portfolio. Option 1 uses two local suppliers. Each has a "unique event" risk of 5%, and the probability of a "super event"

that would disable both at the same time is estimated to be 1.5%. Option 2 uses two suppliers located in different countries.

Each has a "unique event" risk of 13% and the probability of a "Super event" that would disable both at the same time is estimated to be .2%.

P(n) = S+(1-S)U^n

A) What is the probability that both suppliers would be disrupted using option 1?

S = 1.50%

U = 5%

P(n) = 0.0175

B) What is the probability that both suppliers would be disrupted using option 2

S= 0.20%

U= 13%

P(n) = 0.0189

C) Which option would provide the lowest risk of total shutdown?

Option 1 has the lowest risk of total shutdown

because it has a lower probability than option 2

correct

S11.9

Consider a three firm supply chain consisting of a retailer, manufacturer, and a supplier. Ther retailer's demand over an 8 week period was 100 units each of the first 2 weeks,

200 units of each of the second week, 300 units of the third 2 weeks and 400 units of the fourth 2 weeks. The following table represents the orders placed by each irm in the supply chain.

Notice, as is often the case in supply chains due to economies of scale, that total units are the same in each case, but firms further up the supply chain (away form the reatailer) place larger, less requent, orderes

Week Retailer Manufacturer supplier

1 100 200 600

2 100 0 0

3 200 400 0

4 200 0 0

5 300 600 1400

6 300 0 0

7 400 800 0

8 400 0 0

Recall that the same sample variance of a data set can be found by using VAR.S function in excel or by plugging each x value of the data set into the formula:

Variance = (x-x)^2/(n-1), where x is the mean of the data set and n is the nubmer of values in the set.

Retailer

Variance = 14286

Manufacturer

Variance = 100000

Supplier

Variance = 260000

A) What is the bullwhip measure for the retailer?

Bullwhip measure = Variance of orders/ Variance of demand

Bullwhip measure for retailer = 14286/14286 1 correct

B) What is the bullwhip measure for manufacturer?

Bullwhip measure for manufacturer = 100,000/14,285 7 correct

C) What is the bullwhip measure for supplier?

Bullwhip measure for supplier = 260,000/100,000 2.6 correct

D) What conclusions can you draw regarding the impact that economies of scale may have on the bullwhip effect?

We can see that the economies of scale seem to contribute to the bullwhip effect. As less frequent, large orders occur, the variance is larger as it moves up the supply chain toward the supplier

S11.15

Monczka-Trent Shipping is the logistics vendor for Handfield Manufacutring Co. in Ohio. Handfield has daily shipments of a power steering pup from its Ohio plant to an auto assembly line in Alabama.

The value of the standard shipment is $250,000. Monczka-Traent has two options: 1: its standard 2 day shipment or 2: a subcontractor who will team drive overnight with an effective delivery of one day.

The extra driver cost $175. Hndfield's holding cost is 35% annually for this kind of inventory.

Standard shipping $250,000

Holding cost 35% $240

extra driver $175

A) Which option is more economical?

Option 2 with the subcontractor is more economical than the standard shipping.

The holding cost is $240 with and extra $175 for the driver rather than $250,000.

B) What production issues are not included in the data presented?

The issue that is not included in the data is that the Alabama's assembly line is receiving its inputs from Ohio.

Changing the delivery pattern might affect the work of the assembly line for example the 1 day shipping can overstock the assembly line.

This can also effect the production process or issues with the parts and cause delays in the production.

correct

12.1

L. Houts Plastics is a large manaufacturer of injection molded plastics in North Carolina. An investigation of the company's Manufacturing facility in Charlotte yields the information presented in the table below.

How would the plant classify these items according to an ABC classification system?

Item Code Average inventory units Value of unit Total value % of total value % of total quality % of valuation/ quantity Classification

2347 300 $4 $1,200 35.59 28.90 1.23 A

1289 400 $3.75 $1,500 44.49 38.54 1.15 A

9111 6 $3.00 $18 0.53 0.58 0.92 B

2349 120 $2.50 $300 8.90 11.56 0.77 B

7844 12 $2.05 $25 0.73 1.16 0.63 B

2395 30 $2.00 $60 1.78 2.89 0.62 B

8310 7 $2.00 $14 0.42 0.67 0.62 B

8210 8 $1.80 $14 0.43 0.77 0.55 C

2394 60 $1.75 $105 3.11 5.78 0.54 C

2363 75 $1.50 $113 3.34 7.23 0.46 C

6782 20 $1.15 $23 0.68 1.93 0.35 C

Total 1038 Total $3,372

Excellent

A Category comprised of 20-30% of total quantity & contributes to 70-80% of $ valuation

B Category comprised of 20-30% of total quantity & contributes to 15-20% of $ valuation

C Category comprised of 45-50% quantity & contributes to 5-8% of $ valuation

12.4

Lindsay Electronics, a small manufacturer of electronic research equipment, has approximately 7,000 items in its inventory and has hired Joan Blasco-Paul

to manage its inventory. Joan has determined that 10% of the items in inventory are A items, 35% are B items, and 55% are C items.

She would like to set up a system in which all A itmes are counted monthy (every 20 working days), all B items are counted quarterly (every 60 working days), and all C items are counted semiannually

(every 120 working days). How many items need to be counted each day?

Inventory 7,000 working days

A 10% 20

B 35% 60

C 55% 120

A items per day = 35

B Items per day = 41

C items per day = 32

Total = 108 Items

correct

12.13

Joe Henry's machine shop uses 2,500 brackets during the course of a year. These bractets are purchased from a supplier

90 miles away. The following information is known about the brackets:

Annual demand 2,500

Holding cost per bracket per yr $1.50

oder cost per order $18.75

lead time 2 days

working days per yr 250

A) What would be the economic order quantity? (EOQ)

EOQ =√2CD/h

EOQ = 250

B) Given the EOQ, what would be the average inventory? What would be the annual inventory holding cost?

AVG Inv = EOQ/2

AVG INV = 125

Annual holding cost = AVG INV * HOLDING COST

Annual holding cost = $187.50

C) Given the EOQ, how many orders would be made each year? What would be the annual order cost?

# of orders = D/working days in a year

# of orders = 10

Annual order cost = (D/EOQ)*C

Annual order cost = $187.50

D) Given the EOQ, what is the total annual cost of managing the inventory?

Annual managing cost = √2CD*h

annual managing cost = $ 375.00

E) What is the time between orders?

Time between orders = 250/number of orders

Time between orders = 25 days

F) What is the reorder point? (ROP)

ROP = LEAD TIME * Daily Demand

ROP = 20

correct

12.18

Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Right supplies Caltex, a larger assembly company, with 10,000 wheel bearings each Wheel-right is $40, and holding cost is $.60 per wheel bearing per year.

Wheel-Rite can produce 500 wheel bearings per day. Caltex is a just-in-time manufacturer and requires that 50 bearings be shipped to it each business day.

Annual Demand 10,000

Setup cost $40

holding cost $0.60

daily production rate 500 per day

daily demand rate 50 per day

Length of production 1 day

days in a year 365

A) What is the optimum production quantity?

Qp = √2DS/H(1-(d/p)

Optimum production quantity = 1217.16 correct

B) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite?

Q = 500

Maximum inventory level = (total production during the production run) - (Total used during the production run) Q(1-(d/p))

Maximum inventory level = 450 1095

C) How many production runs of wheel bearings will Wheel-Rite have in a year?

Production runs = 365 in a year 8.22

D) What is the total setup + holding cost for Wheel-Rite?

Setup = (D/Q) * S

Holding cost = 1/2*H*Q(1-(d/p))

Setup cost = $800

Holding cost = $ 135

Setup cost + holding $935 $657.30

Applied Sciences

Architecture and Design

Biology

Business & Finance

Chemistry

Computer Science

Geography

Geology

Education

Engineering

English

Environmental science

Spanish

Government

History

Human Resource Management

Information Systems

Law

Literature

Mathematics

Nursing

Physics

Political Science

Psychology

Reading

Science

Social Science

Home

Blog

Archive

Contact

google+twitterfacebook

Copyright © 2019 HomeworkMarket.com

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

University Coursework Help
Top Essay Tutor
Helping Hand
Homework Guru
Writer Writer Name Offer Chat
University Coursework Help

ONLINE

University Coursework Help

Hi dear, I am ready to do your homework in a reasonable price.

$77 Chat With Writer
Top Essay Tutor

ONLINE

Top Essay Tutor

I have more than 12 years of experience in managing online classes, exams, and quizzes on different websites like; Connect, McGraw-Hill, and Blackboard. I always provide a guarantee to my clients for their grades.

$80 Chat With Writer
Helping Hand

ONLINE

Helping Hand

I am an Academic writer with 10 years of experience. As an Academic writer, my aim is to generate unique content without Plagiarism as per the client’s requirements.

$75 Chat With Writer
Homework Guru

ONLINE

Homework Guru

Hi dear, I am ready to do your homework in a reasonable price and in a timely manner.

$77 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

International friesian show horse association - Flash memory case answer - MANAGING CAREER - Cloud Computing - Rogo trading and appliance service center - Construct a 99 confidence interval with the outlier removed - Http pages stern nyu edu adamodar new_home_page datafile ratings htm - Transported man magic trick - Dva non slip mats - Country phone code 212 - How did the absent minded professor burn his ear key - Friction, Drag force, Elasticity - What is the effect of foreshadowing - Harley davidson motor company enterprise software selection pdf - Wave cut notch diagram - Information Systems - Effective Facilitators Paper or Presentation - MK630 WK1 - Baddeley and hitch 1976 - What is data abstraction in python - Smith paulson o donnell & erickson plc - David deangelo reading list - Monkey on my back management book - Persuasive speech outline on depression - High lift naca airfoils - Strategic plan, part 2: internal environmental analysis - Wendy Lewis 1 - Direct object and object complement - How to do a cage analysis - Best critical analysis essay - 6 month training program - Econ - Barriers to Being active - Need 1 page apa paper in next 2 hrs. - Long jump pit installation - Interdisciplinary Paper - Cultural plunge examples - Difference between traditional goal setting and mbo - Acc 110 discussion question - Hmework questions - Percentage of copper in brass experiment - Imogen pants princess polly - Balancing symbol equations worksheet - Derivative of inverse cosh - Full wave rectifier harmonics - Spanish 3 midterm exam answers - Stephanie buttermore jeff nippard - Rayleigh scattering phase function - 300 words APA format - Asa24 login - Information Governance Final Research paper - Business combination valuation reserve entries - How equifax neglected cybersecurity and suffered a devastating data breach - ASSIGNMENT 5 - Leadership theories matrix ldr 300 - Responses - Brisbane city plan 2014 mapping - Paper - Business Intelligence - Network management research paper - Journal entries are sorted and summarized by transferring information to - Developmental psychology discussion questions - Unholy trinity imf world bank wto - Sandra cisneros eyes of zapata summary - How to cite backpack literature 4th edition - Webcast bkwsu eu uk - List of liquid elements - There will come soft rains powerpoint - Tactician usb hackers memory - Marketing strategy assignment pdf - 1.1 10 practice written assignment - Benchmark - Risk Management Program Analysis - Part One - Create crc cards online - Free online graph paper - Accounting - Page Design - Busines law, ethics and social responsibility - Presentation on social work - Group therapy - Where does the muffin man live shrek - Umuc last day to withdraw - How to measure abiotic factors - Iso 2248 drop test pdf - Anne bradstreet house fire - Assignment 2: The Trait Model of Personality - Game theory psychology mcat - Hi there. - Debriefing and Progress Report - Administered vertical marketing system example - Two ways to belong in america questions - Stanford history education group sheg stanford edu answer key - During the sales dialogue the salesperson should - Case study - Lpi online 360 assessment - How well do you know your sweets quiz - Writing assignment bartolome de las casas - Chapter 10 study guide - PPT on the following topics - Marketing homework - Flps homework