Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

As 4120 code of tendering pdf

05/01/2021 Client: saad24vbs Deadline: 7 Days

Accessed by CENTRAL QUEENSLAND UNIVERSITY on 02 May 2018 (Document currency not guaranteed when printed)


A S41 20 — 19 94


Au str ali an St an da rd


C o d e of te n d er


This Australian Standard was prepared by Committee OB/10, Construction Industry Practice. It was approved on behalf of the Council of Standards Australia on 28 October 1994 and published on 31 December 1994.


The following interests are represented on Committee OB/10:


Association of Consulting Engineers Australia


Australian Chamber of Commerce and Industry


Australian Institute of Purchasing and Materials Management


Australian Liquor Hospitality and Miscellaneous Workers Union


Construction Industry Development Agency


Construction Industry Engineering Services Group


Law Council of Australia


Master Builders Australia


MTIA/National Construction Council


National Public Works Council


Royal Australian Institute of Architects


Review of Australian Standards. To keep abreast of progress in industry, Australian Standards are subject to periodic review and are kept up to date by the issue of amendments or new editions as necessary. It is important therefore that Standards users ensure that they are in possession of the latest edition, and any amendments thereto. Full details of all Australian Standards and related publications will be found in the Standards Australia Catalogue of Publications; this information is supplemented each month by the magazine ‘The Australian Standard’, which subscribing members receive, and which gives details of new publications, new editions and amendments, and of withdrawn Standards. Suggestions for improvements to Australian Standards, addressed to the head office of Standards Australia, are welcomed. Notification of any inaccuracy or ambiguity found in an Australian Standard should be made without delay in order that the matter may be investigated and appropriate action taken.


Ac ce ss ed by C E N T R AL Q U E E N SL A N D U NI V E R SI T Y on 02 M ay 20 18 (D oc u m en t cu rre nc y no t gu ar


AS 4120—1994


Australian Standard


PUBLISHED BY STANDARDS AUSTRALIA (STANDARDS ASSOCIATION OF AUSTRALIA) 1 THE CRESCENT, HOMEBUSH, NSW 2140


ISBN 0 7262 9426 8


Ac ce ss ed by C E N T R AL Q U E E N SL A N D U NI V E R SI T Y on 02 M ay 20 18 (D oc u m en t cu rre nc y no t gu ar


First published as AS 4120(Int)— 1993. Revised and designated AS 4120—1994.


Code of tendering


AS 4120—1994 4


PREFACE


This Standard was prepared by the Standards Australia Committee on Construction Industry Practice to supersede AS 4120(Int) — 1993, Code of tendering . The previous edition of this Standard was developed and issued to public comment by the Construction Industry Development Agency (CIDA) Code of Practice Working Party and forwarded to the Standards Australia Committee on Construction Industry Practice for endorsement as an Interim Australian Standard. This edition incorporates the following major changes from the previous edition:


(a) Clause 6.1.1 — includes a statement on project funding. (b) Clause 6.1.2 — expands on the objectives of the tender documents. (c) Clause 6.1.3 — includes a statement on the application of pre-qualification criteria.


(d) Clause 6.2.1 — includes a statement on commitment to proceed with project. (e) Clause 6.2.2 — expands on inclusions in the advertisement. (f) Clause 6.5 — clarifies tender requirements and tender evaluation criteria. (g) Clause 8 — includes a statement on commercial in confidence.


NOTES:


1 In developing this Standard, Recommendations 6, 11 and 12, 13 and 20 of the Construction Industry Development Agency’s Report on Security of Payment, were taken into consideration in Clauses 6.1.1, 6.1.2(h), 6.6 and 6.1.2(e) respectively. Recommendation 10 of that Report recommends the use of this Standard. Users may refer to that report for further information concerning CIDA’s Security of Payment recommendations.


2 The Principal should recognize the cost of preparing tenders, especially in the case of certain procurement systems, which require Tenderers to prepare documentation (including design or the preparation of alternative proposals) as part of their tender. In appropriate circumstances this may require the Principal to consider payment to Tenderers to offset these costs.


Ac ce ss ed by C E N T R AL Q U E E N SL A N D U NI V E R SI T Y on 02 M ay 20 18 (D oc u m en t cu rre nc y no t gu ar


Except where the Copyright Act otherwise allows, no part of this publication may be reproduced, stored in a retrieval system in any form or transmitted by any means without prior permission in writing of both the Standards Association of Australia and the Construction Industry Development Agency.


STANDARDS ASSOCIATION OF AUSTRALIA CONSTRUCTION INDUSTRY DEVELOPMENT AGENCY


 Copyright


CONTENTS Page


FOREWORD..................................................................................................................................4


1 SCOPE.....................................................................................................................................5 2 APPLICATION.......................................................................................................................5 3 DEFINITIONS.......................................................................................................................5 4 ETHICS...................................................................................................................................5 5 TENDERING PROCEDURES..............................................................................................6 6 OBLIGATIONS OF THE PRINCIPAL.................................................................................6 7 OBLIGATIONS OF TENDERERS.....................................................................................10 8 CONFIDENTIALITY..........................................................................................................11


Ac ce ss ed by C E N T R AL Q U E E N SL A N D U NI V E R SI T Y on 02 M ay 20 18 (D oc u m en t cu rre nc y no t gu ar


FOREWORD


The purpose of this Standard is to encourage high ethical standards in tendering in the construction industry, in the belief that significant benefits will flow to the entire community through the delivery of higher productivity, high quality construction work, better working conditions and elimination of malpractice. It constitutes a statement of the ethics which underline best-practice tendering procedures. It imposes an obligation on all those parties to refuse to condone unethical behaviour by others in the industry. Inherent in adoption of this Standard is a willingness to deal only with industry organizations and personnel whose standards of performance and behaviour conform to those expected by this Standard.


Ac ce ss ed by C E N T R AL Q U E E N SL A N D U NI V E R SI T Y on 02 M ay 20 18 (D oc u m en t cu rre nc y no t gu ar


COPYRIGHT


STANDARDS AUSTRALIA


Australian Standard Code of tendering


1 SCOPE This Standard sets out the ethics and the obligations of the Principal and Tenderers in tendering in the construction industry. A separate Standard covers the selection of consultants providing professional services.


2 APPLICATION This Standard applies equally to Principals, their agents, contractors, subcontractors and suppliers and their associations and professional organizations.


3 DEFINITIONS 3.1 Construction industry—includes all building, refurbishment, maintenance, civil engineering, process engineering, mining and heavy engineering projects. It excludes cottage construction.


3.2 Intellectual property—all copyright, patents and all rights in relation to inventions, registered and unregistered trademarks (including service marks), registered designs, circuit layouts and all other rights resulting from intellectual activity in the industrial, scientific, literary or artistic fields.


3.3 Principal—any party inviting and receiving tenders. A Principal may include a contractor or subcontractor.


3.4 Tenderer—any party submitting tenders, including contractor, subcontractor and supplier.


4 ETHICS This Standard is based on the following principles: (a) Tendering at all levels in the construction industry shall be conducted honestly and in


a manner that is fair to all parties involved.


(b) Parties shall comply with all legislative obligations including those required by trade practices and consumer affairs legislation.


(c) The Principal shall have regard to the costs of tendering and the number of Tenderers, recognizing that the cost of tendering is a significant industry overhead.


(d) Tenderers shall only tender where they intend to carry out the work. (e) The Principal shall call for tenders only after the Principal has arranged funding for the


project and has made a firm commitment to proceed with the project.


(f) The conditions of tendering shall be the same for each Tenderer.


(g) Parties shall not engage in practices such as collusion on tenders, inflation of prices to compensate unsuccessful Tenderers, secret commissions, or any other such improper arrangements.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Helping Hand
University Coursework Help
Writer Writer Name Offer Chat
Helping Hand

ONLINE

Helping Hand

I am an Academic writer with 10 years of experience. As an Academic writer, my aim is to generate unique content without Plagiarism as per the client’s requirements.

$60 Chat With Writer
University Coursework Help

ONLINE

University Coursework Help

Hi dear, I am ready to do your homework in a reasonable price.

$62 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

9.4 visualizing with venn answers - Papa john's competitive strategy - Coca cola balanced scorecard - What are the added values in formatting a documenting - Upmxl geo 25 125 - Financial management challenges and ethics - Secondary brand knowledge - Fitt principle ppt - Cineplex rewards program - Walgreens inventory turnover - Intensifying stage of a relationship - Ballarat arms and militaria collectors society - Chase bank greece ridge mall - The four agreements lesson plan - Advantages and disadvantages of level production strategy - Excel qm add in download - Attribution theory - Using superposition find vo in the circuit - Final Project paper - Application for a medicare entitlement statement - Network management research paper - Jg speedfit thermostat instructions - Monash special developmental school - Single display performance mode - 7 1 1 multimedia presentation planning worksheet assignment - Which of the elements of this scenario represent a flow from a firm to a household - Clinical Supervision - 500 words - Science lab questions and answers - 63-MS-Four - Terms like terms coefficients constants - Lifted pixar plot diagram - Bath spa students union - State election commission rajasthan - Introduction to educational research suter - Year 9 history syllabus - Amada punching machine programming - Interview questions BAES - Blank usa nickname of a record label headquarter - Assignment 1 lenscrafters case study - Dr farheen fahim livingston nj - Quotes that show othello is respected - Final Portfolio Project -emerging concepts that are using Big Data and Blockchain Technology. - West bar surgery banbury - Mole conversions chem worksheet 11 3 - Andrew balding stable tour - Aluminium cladding companies in saudi arabia - Cisco commands cheat sheet pdf - A sunday on la grande jatte analysis - Hard rock cafe operations management in services - Gyprock ceiling batten spacing - Uranium noble gas configuration - Naturalistic observation is commonly used for anthropology studies - 3 pigs in animal farm - Measuring cylinder scientific drawing - Isagenix 30 day plan - The rise and fall of the city of mahagonny pdf - Difference between radio and television news - Typeerror findall missing 1 required positional argument string - Should tablets replace textbooks - Cpt code for femoral neck fracture - 10 essential skills for classroom management - One fell swoop shakespeare - Mmol l to mg l water hardness - Worker.cob.csuchico.edu - Enron bankruptcy case study - Week 4 discussion question - Ax 2012 deploy reports - Explain the relationship between blues artists and record companies - Payment - Basketball team erd - Is boron shiny or dull - Discussion - Challenges walmart faces in africa - Angular momentum of a rotating rod - Kings and queens lyrics horrible histories - Hilti hit hy 50 - Claude monet painting in his studio - Child development theorists worksheet answers - Alabama tombigbee area agency on aging - Need a Rewrite - Alis volat propriis pronunciation audio - essay Is Machiavelli a modern thinker? In what ways does he represent a bridge to the past as well as to ‘Modernity’? - A tree was 60 inches tall - Pureed meals for elderly - Colleagues Response week 2 - Lab report help - Complete the attachement assignments - Api mpms chapter 7 - Why does the klan burn crosses - The pink floyd experience - Unlink reservation my disney experience - To calculate gdp by the expenditure method one must add - 1.339 as a fraction - All aluminum conductor table - Dusting by julia alvarez analysis - Blair atholl caravan park - Theme 3 lesson 8.2 a managing your money answer key - How to find vulgar fraction - Prefix that means 100