Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

ASSIGNMENT

01/11/2020 Client: visedh Deadline: 7 Days

    


SURVEYING FINAL ASSIGNMENT (This assignment is marked out of 80 but is worth 40% of the subject assessment) 


Using the plan provided, and meeting the criteria set out below, you must make a preliminary design for a road to access a rural property. The new road must run from its junction with Tucker’s Road and must end inside the parking area (labelled P) at exactly the R.L. specified and must not be longer than 520m. Also, a survey party will undertake a final survey on your behalf and you are to provide them with instructions for any extra data to be collected as well as data to allow them to set out the road. 


Plan Provided 


The plan provided was drawn at a scale of 1:2,000 with a contour interval of 5m. 


While every effort was made when scanning the plan, and recognising possible printer variations, you MUST CHECK the scale of your print. As well as the bar scale showing 100m, there are three lines , for which precise distances have been given. Measure each of the four lines at a scale of 1:2,000, show these measurements in your answer sheet and compute a correction factor for your plan. State this factor and use it when you measure the lengths of your straights. 


Assume that the contours are correct with 90% confidence


Horizontal Alignment 


The first straight is shown in red and the first Intersection Point (IP) must be at the end of the red line.

You must draw two more straights to complete the road alignment. These straights must allow the road to be designed to meet the requirements of the vertical design as listed below. Also, the area of land adjacent to the creek, which runs to the river, that is bounded by the 15m contour line, the river and the two dashed lines is prime agricultural land and the road is not permitted to go through this area. 


Use a protractor to find the bearing of the first straight and then measure the deflection angle for each curve to the nearest degree. Use Tucker’s Rd with its bearing of 0o, as your azimuth. Scale the distances from Tucker’s Rd to IP1, IP1 to IP2 and IP2 to the End, to the nearest metre. For the purposes of the calculations for the preliminary design, the scaled lengths (00 - IP1, IP1 – IP2 and IP2 - END) must be adopted as the design length of each straight to a precision of two decimal places. 


Each horizontal curve is to have radius of 60m.

Calculate the tangent distance and arc length for each curve and show them in the table of answers.

Calculate the chainages of each of the four TPs and any other points listed and show them in the table of answers. 


On your plan, plot each curve. (Calculating the external distance will give you a third point to help you draw the curve freehand.) Also clearly show the lengths of each straight (IP - IP) and the bearing of that straight. 


Please calculate the data needed to set out each horizontal curve from its first TP by deflection angles and long chords for points at 15m running chainage along the road as well as the crown of each curve. (i.e. 120, 135, 150, 165 ... 360, 375, 390, 405, as they fall within each horizontal curve. 


Vertical Alignment 


Using the contours on the map provided, draw a longsection of the Centre Line of your road at scales; horizontal 1:2,000 and vertical 1:200. (Please read the submission section for detailed guidance about drawing the longsection.) 


Design a vertical alignment of the centre line of the road showing grades and vertical curves. The vertical alignment must meet the following criteria: 


  


The road must start at RL 14.5 and must finish at exactly RL 32.5. This final grade of your road into the parking site must be between +2.0% and +0.5%. The maximum grade allowed at any point along the road is 10%.

Vertical curves must have lengths of 60m or 80m only. In exceptional circumstances, a VC of 40m length may be permitted but you will need to explain why it must be used. The IP of each vertical curve must be located at an even 10m chainage (i.e. 120, 350 etc. and must not be placed at odd locations such as 376.5). All grades used must be to no greater precision than 0.1%, except for the final grade to the end of the line. (i.e. grades such as 3.1% must be used for every grade, except the final one where additional decimal places must be shown, where necessary, to ensure that the Design RL meets the set RL of the parking area). 


Every change of grade requires a vertical curve. (Assume that your road will meet Tucker’s Road at the nominated RL and can start at any grade you wish to use. No vertical curve will be needed at this road junction.) 


Cut and Fill

Except for the two locations specified, the vertical design should keep cut and fill to less than 1m in depth. Working by eye, and not mathematically, try to balance cut and fill along the road. 


Between the two banks of the river, your road must be between 1m and 2m above the bank R.L., so that precast box culverts can be installed. For no more than 15m either side of the 30m contour line, a cut of up to 2m is permitted. 


Complete the table with your vertical curve calculations for the design levels. 


Calculate the Design Levels for the locations as specified: every 30m of running chainage along the road, where there is NO vertical curve; (i.e. 0, 30, 60, 90 ...300, 330, 360 etc. ... and the end of the road). For every vertical curve, please calculate the Design Levels at every 10m from VC TP to VC TP.

Also calculate the chainage (to 2 d.p.) and RL of the low point of the road at the river crossing. 


Watercourse Information 


The banks of the creek where the road crosses it are at R.L. 11.0. 


Precision of Calculations Needed 


On your plan, please show the bearings of the straights to the nearest degree only and the distances IP to IP should be shown to the nearest metre.

For the horizontal curve setting out data, please calculate the arc lengths and long chord distances to two decimal places of a metre and the setting out deflection angles to the nearest 10”. 


All levels on the longsection table must be correct to two decimal places. The grades you nominate for the road design must be to no greater precision than one decimal place, except for the final grade, and all R.L.s must agree perfectly with the grade shown. Your road must end exactly at R.L. given for the parking area. 


Survey Party Instructions 


A survey party has run an EDM traverse point A, (whose coordinates are 300.000m E, 600.000m N) on the centre line of Tucker’s Road via point Y, to a point X which is close to the parking area P. Calculate the coordinates of point X. Also, using your bearings and distances of each straight of your road, calculate the bearing and distance for the survey party to set out the end of your road from point X.

The curve set out data has already been requested. 


Finally provide instructions to the survey party for any extra information needed or areas to checked for you to be able to finalise your road design. 


  


Submission

1) The plan showing your straights with the bearings and the scaled distances (0 to IP1), (IP1 to IP2) and (IP2 to the END) clearly marked. Each horizontal curve must be plotted. 


2) Horizontal and Vertical Curve Tables completed on the answer sheet. 


3) A Longsection, showing:

a) in the drawing section, the natural surface, grade lines and the road design. You must also note the extent of each grade and the regions where the vertical curves are located. Also show each IPRL and Mid Ordinate value, as per the example provided.

b) in the data rows, the distances and natural surfaced RLs used to plot the natural surface;

the distances and Design RLs at the chainage of each IP of the vertical alignment only. 


(Longsection guidance – it is strongly recommended that you use an A4 sheet of 2mm graph paper to draw your longsection. The bottom three rows should show Distance, Design RL and Natural Surface RL. To ensure your longsection fits on the page, the RL of the base line of the plot should be 5m, making the very top of the page RL 33m.) See a detailed example online. 


4) Instructions for the survey party: 


a) data to mark location of the end of your design from point X, (as per the tables provided)

b) data to set out each horizontal curve from its first TP by deflection angles and long chords for points at 15m running chainage within each horizontal curve, and the crown of each curve, (as per the tables provided)

c) instructions to the survey party for any extra information you wish them to gather for you to finish your design. 


Submission Component and Marks Awarded

Plan 1) 6 Horizontal Curve calcs (leading to chainages) 2) 14 Longsection 3) 5 VC Calc table: Grades, ordinates, Design RLs 2) 20 


Low Point Ch and RL 2) 5 Design meeting specifications 3) 5 Traverse and missing line calculations 4)a 10 Curve set out data 4)b 10 Instructions to Survey Party 4)c


NOTE 


This exercise is only an assessment of the work done in the Surveying subject this semester. Do not research road design information and go beyond the calculations shown to you in the Surveying classes. You will be marked on the accuracy of your calculations and meeting the specification only. The “quality” of the road design will not be considered. i.e. treat the horizontal and vertical alignments as being totally separate designs. 

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Writer Writer Name Offer Chat

Writers are writing their proposals. Just wait here to get the offers for your project...

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

HS 2305 Legal and Ethical Issues In Human Service - Linda raschke swing trading - Writing a security strategy - The 2018 human resources trends to keep on your radar - Business law text and cases edition free - Vcole v south tweed heads rugby league football club ltd - Billy elliot essay questions hsc - Chapter 7 grader project excel - Angels and airwaves sirens bass tab - Levered vs unlevered firms - Rainwater tanks coffs harbour - Sally invests some money at 6 - Jim kawashima walgreens - Software Assurance - Case analysis - Wheel and axle simple machine meaning - Tdutybq atljhjd - Time value of money chapter 5 solutions - Write notes on contemporary issues in management accounting - Kindertons accident management crewe - Stan steele musician - Week 6 research article critique paper - Nesa all my own work - Poppies remembrance day poem - Talent q verbal reasoning test - Don't stop searching or waste invaluable time waiting! - Seven jeans true religion i say no - Help with psychology and communication - Informative Speech - Leading Organizational Change & Cultural Transformation - What you pawn i will redeem thesis statement - Environmental science reading assignment climate refugees answers - Impromptu Speech - Sorensen systems inc is expected to pay - Bbc magnets and springs - Roll of thunder hear my cry characters pictures - Alfresco community edition limitations - Public Health - How do you become a chegg tutor - When was caged bird written - Dennis kozlowski net worth - Why should guns be allowed on college campuses - Systemic crisis definition - Don't throw stones at blackbirds meaning - IT Ethics - Leccion 7 contextos activities answers - Ben and jerry's harvard case study - Biddabah public school warners bay - Managerial Finance - Questions for book homeless - Acid base calculations worksheet - Henges stonehenge woodhenge avebury & stanton drew - Bernoulli's theorem experiment calculation - WEEK4-DISCUSSION-Data Science & Big Data Analy - Postulates of special theory of relativity ppt - Elie tahari janine driver flats - 0.1 uf capacitor code - Homeostasis 5e lesson plan - Rigor mortis occurs after death because - Order 2497209: Cultural Effect of Technology in Schools - How to measure transient voltage - Images com is a small internet retailer - Deepwater simulation - Does under armour have any core competencies - A capacitor has a label on it saying 100 wvdc - Questions for charles by shirley jackson - Rather than strong work ethic a common attitude is - Creating Value - Sterling integrator certification cost - Are tinted tail lights legal in nsw - Four layers of a typical state court system - Intelligence from secrets to policy 7th edition pdf - Emotional behavioral disorder powerpoint - Annual housing statistics bulletin - Social club misfits holy diver holy diver february 28 - 4 peer responses - due in 20 hours - Century ultra hi performance 4wd battery ns70lx mf - A company purchased a weaving machine for $190 000 - Reelclub com au activate - Ap chem score calculator - Stories of Humanitarian Aid Image Analysis Assignment - Kathy schwalbe information technology project management eighth edition pdf - Aasb 116 property plant and equipment - Engineering science and mechanics - Multiple years of practical training at same education level - Assignment wk3 - 2 - Uacds - Summary of the alligator river story - What did filmmakers consider to be the advantage of silent films? - Elements of gothic literature - Careersinpsychology org careersinpsychology org impact media - The lean pocket handbook for kaizen events - Internet Research - Psychology - Ge and the industrial internet case summary - Field refers to a collection of related records. - Environmental History - 16.7 inches in cm - Cisco 1900 visio stencil