Outline of ET410 course Week1: In the very first week, you will be introduced to the concept of project management and
will learn how to become a better project manager. In this week, you will also learn about the
relationship between systems engineering and project management. It is important to realize the
similarities between the two in order to work out the details in the context of technical and
managerial leadership of a project. In this week, you will also perform research and gather
information to brainstorm ideas for the capstone project that will solve an engineering design
problem. In addition to that, you will also maintain the lessons learned document that you will
edit each week based on your observations and lessons learned from that week.
Week 2: In week 2, you will learn about the organizational context, strategic management and
project planning. You will prepare a project proposal document (Template provided) and submit
it in the course and also to xxxxxxxxxx@xxxx.edu
Week 3: In this week, you will learn about designing the breadboard circuit for your
project. If your project requires a circuit to be built on a breadboard, this week you will
design that using a virtual environment to simulate the actual breadboard circuit. After the breadboard design has been completed, a cost analysis should be performed to
determine the status of the design relative to the cost goals. You will develop the cost
analysis spreadsheet to determine the cost associated with designing your circuit
breadboard.
Week 4: In this week, you will learn about the scope reporting, in other words any control
system or management of documentation that assess overall status of your project. You will learn
about the responsibility assignment matrix, scope management and identifying the requirements
for the project. You will be required to identify the requirements for your project. The other part
of your work will be to complete the work breakdown structure (WBS) for your project.
Week 5: In week 5, you will work on scheduling. There will be concept of project scheduling
and theory of constraints. You will learn about the critical chain project management and
scheduling process. You are supposed to add the scheduling in the WBS that is created in week
4.
Week 6: In this week, you will be working on cost estimation and budgeting. You will learn
about cost of labor, cost of material, cost of equipment, direct and indirect costs, recurring and
nonrecurring costs, and fixed and variable costs. In this week again, you will use the WBS and
add the cost and budgeting information for your project.
Week 7: Risk managements is important aspect of project management. In this week, you will
learn about five causes of risk and ways to analyze risk using PRAM model. You will need to
identify the risks associated with your project and analyze and mitigate the risk using the
strategies learned. Resource management is an important task to implement in a project. You
will learn about the resource loading, resource leveling and techniques for resource moving. You
will prepare the Ganttchart for the resources needed for your project.
Week 8: In the last week of ET410, you will learn about the closeout and termination of the
project. Some of the factors that cause the early termination of the project will also be discussed. Technical Project Management
Importance of a Lessons Learned document
Throughout the project, you will gather additional information that may be used to limit risk, continually improve the process, and provide a basis for future projects. This knowledge should be kept in a document that is updated by you and other project team members, if relevant, called the Lessons Learned document. In this course we will utilize a Lessons Learned Document Template that includes notes as to what works well and what does not work well at various phases of the project. Thus, each team member or project participant should contribute to this document at the completion of each phase and milestone. The lessons learned document will serve as a valuable resource both during the project and upon project completion. The information gathered will become part of historical information that may be referred to in future projects. The availability of historical information greatly reduces the risks associated with estimating. It also helps you to learn about your own strengths and weaknesses and to correct those as you go along. In summary, a lessons learned document
1. Is important for continuous improvement 2. Provides additional historical context to a project, which can be useful in the project
audit phase or in future projects 3. Aids in identifying areas for personal improvement or professional development
WEEK 1
W1 Assignment "The Project Management Institute" Technical Project Management
The Project Management Institute
Watch first 3 videos of Microsoft Project Tutorial.
Write a 1-2 page paper. In your paper answer the following questions:
Explain in detail what role the PMI plays and what are its requirements for membership.
When and why was the PMI formed?
What is the criteria for membership?
What purpose does it play for the engineer and his future?
Why become a member?
What is the CAPM, and what is required for this?
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221710_1&course_id=_39688_1&assign_group_id=&mode=view
http://faculty.bus.oregonstate.edu/Larson/New%20Faculty%20Page/MS%20Project%20Tutorials%202010/index.html
Include a title page and 3-5 references. Only one reference may be from
the internet (not Wikipedia). The other references must be from the Grantham
University online library. Please adhere to the Publication Manual of the American
Psychological Association (APA), (6th ed., 2nd printing) when writing and submitting
assignments and papers.
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
Brainstorming Activity: (Do not have to submit)
Begin to brainstorm ideas for the capstone project. You can also do this with a
teammate if you both plan to take ET450 at the same time. Feel free to use the
discussion forum to find out if other students in the course are interested in working
on a project together.
Identify an engineering design problem. Investigate existing solutions to the problem.
What are alternative solutions to the problem which you can think of which could be
the basis for your capstone project? Be sure to review the “Scope of the Capstone
Project” to make sure that you are meeting the expectations for the project and that it
would be feasible for you to do in the time available and within your budget. As you
brainstorm, also be sure to review the tips for researching design problems found in
Chapter 5 of Stadtmiller.
You are encouraged to review the week 2 course work assignments to understand the
expectations.
WEEK 2
W2 Discussion "Strategic Management" Technical Project Management
Strategic Management
How does defining a project relate to project planning?
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221805_1&mode=view
1. Why is it important to develope a strategic vision and sense of mission before
proceeding?
2. Why is it important to politically know the key stakeholders and ensure they are in
agreement before proceeding?
3. Why is it importance to understand the purpose, goals and objectives, success criteria,
and project scope before proceeding?
Discuss how each of these elements are important in understanding the challenge of
project management.
Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your
own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure,
and spelling.
W2 Assignment "Prepare Your Project Charter" Technical Project Management
Prepare Your Project Proposal 1. Use the Project Proposal Template
2. Fill out completely and turn in to the course instructor in Blackboard and also email it
to xxxxxxx@grantham.edu from your Grantham email address. The subject line for the email
should be “Capstone YourGID - Term”. If you need assistance, please contact the instructor prior
to the due date.
3. Update the Lessons Learned Document and submit with your proposal. Remember that the
template is found in Week 1. You will be using this template as a running document, adding to it
as you go through ET410 and ET450.
WEEK 3
W3 Discussion "Types of Design Reviews" Technical Project Management
Types of Design Reviews
Look up articles on different types of design review processes for engineering projects on the EBSCO host and IEEE online Library resources from Grantham. Reserve one of the articles to discuss the significance of the selected design review process. Please make sure to provide a link to the article.
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221806_1&course_id=_39688_1&assign_group_id=&mode=view
https://lms.grantham.edu/bbcswebdav/pid-3221806-dt-content-rid-11213167_1/xid-11213167_1
mailto:xxxxxxx@grantham.edu
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221827_1&mode=view
Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your
own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure,
and spelling.
W3 Assignment "Developing Requirements and SDR Documents" Technical Project Management
Developing Requirements and SDR Documents
1. Based on the lectures, the Engineering Design text (especially 2.2, 6.1, 6.3, 7, and 8), and your research, do the conceptual design (as explained in Chapter 2 and also above) for your project. Two or three alternative designs should be considered with functional block diagrams for all of them. You may submit your Conceptual Design Review or System Design Review document as a powerpoint presentation or as a written document. You may use templates as a guide by doing a search of "conceptual design review template" or "system design review template."
2. Create a Project Requirements Document for your chosen design. It should include a
functional block diagram of the design along with the functional specifications. This
should be a written document. It is worthwhile to look for templates to guide you by
doing a search of "project requirements document" or "requirements specification
template" or "specification document template."
3. Update your Lessons Learned Document.
4. Be sure to save these documents along with the one last week as you will need to
submit these in Week 1 of ET450.
5. Submit these in the dropbox.
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221828_1&course_id=_39688_1&assign_group_id=&mode=view
WEEK 4
W4 Discussion "The Work Breakdown Structure (WBS)" Technical Project Management
The Work Breakdown Structure (WBS)
Discuss the purposes of the work breakdown structure and how it might apply to your
specific project.
Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your
own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure,
and spelling.
W4 Assignment "Developing a Work Breakdown Structure" Technical Project Management
Developing a Work Breakdown Structure
1. Watch videos 9 thru 13B of the Microsoft Project Tutorial.
Read the tutorial and get the link to download Microsoft Project
HERE immediately if you did not start the process last week.
o Using Microsoft Project software develop a WBS for your project o Include tasks for such things as equipment specifications for vendors, vendor
bidding packages, evaluation of bids and vendor selection 2. Include a title page and any references you used.
3. Update your Lessons Learned Document.
Note: Break down your tasks to the lowest level possible. The more detailed your WBS is, the more accurate your scheduling and budget will be! Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221840_1&mode=view
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221841_1&course_id=_39688_1&assign_group_id=&mode=view
http://faculty.bus.oregonstate.edu/Larson/New%20Faculty%20Page/MS%20Project%20Tutorials%202010/index.html
https://content.grantham.edu/at/EE410/DreamSparkTutorial.pdf
https://content.grantham.edu/at/EE410/DreamSparkTutorial.pdf
WEEK 5
W5 Discussion "Time Management" Technical Project Management
Time Management
Discuss some of the reasons why individuals routinely over-estimate the time for
project activities. How is this behavior detrimental to the schedule and project?
Are some of these reasons more prevalent in your own experience than others?
Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your
own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure,
and spelling.
W5 Assignment "Adding a Schedule" Technical Project Management
Adding a Schedule
1. Watch videos 14 thru 21 of Microsoft Project Tutorial
o Using Microsoft Project software amend your WBS to include the schedule of time required to complete your project.
o Be sure when you add your schedule, you check the sequence of activities. In the real world many tasks can be performed in parallel or concurrently
o Don’t forget you must schedule all tasks assigned under the WBS
2.
3. Include a title page and any references. 2. Update your Lessons Learned Document.
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221889_1&mode=view
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221890_1&course_id=_39688_1&assign_group_id=&mode=view
http://faculty.bus.oregonstate.edu/Larson/New%20Faculty%20Page/MS%20Project%20Tutorials%202010/index.html
WEEK 6
W6 Discussion "Cost Estimation and Budgeting" Technical Project Management
Cost Estimation and Budgeting
An important aspect of cost budgeting is personnel. A current professional issue in the
engineering field is companies using contract engineers like employees but refusing to
actually make them employees. Thus, they effectively work for a company for years in
a contract status rather than in a full-time employee status. Labor and tax law may
motivate the employer and perhaps the ‘employee’ to maintain a contingent status. On
the other hand, there can be an ethical issue with refusing to transition an ‘employee’
to full-time status. Discuss what motivates an employer to use temporary or contingent
employees, and explain the ethical implications on the individual, society, and the
profession of keeping an individual in that status. What criteria might be used to
determine when to change an individual’s status? Consider ethical problem solving
strategies from ET100 where appropriate. You MUST have references.
Should be 75 to 150 words, but may go longer depending on the topic. If you use any source outside of your
own thoughts, you should reference that source. Include solid grammar, punctuation, sentence structure,
and spelling.
W6 Assignment "Adding a Budget" Technical Project Management
Adding a Budget
1. Watch videos 22 thru 30 of Microsoft Project Tutorial.
Using Microsoft Project software amend your WBS to include your project budget
Make sure that you use your resource sheet in Microsoft project to list all materials, work
classification units and resource units
Make sure you show totals for all major headings and the project total itself
Include a title page and references you used.
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221905_1&mode=view
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221910_1&course_id=_39688_1&assign_group_id=&mode=view
http://faculty.bus.oregonstate.edu/Larson/New%20Faculty%20Page/MS%20Project%20Tutorials%202010/index.html
WEEK 7
W7 Discussion "Risk Variables" Technical Project Management
Risk Variables and Critical Resources
Question 1: What are some of the typical risk variables of your project? Discuss any additional risks that are most likely to occur in your project? How will you mitigate these risks? Question 2: For most projects, the key resources to be managed are the project team personnel. Explain in what sense project team personnel are often the projects most critical resource?
W7 Assignment- "Risk Factors and Gantt Chart" Technical Project Management
Risk Factors and Gantt Charts
Question 1: Project Risk factors List the major risk factors for your project and the possible ways to mitigate this risks for your
project. Question 2: Resource Evaluation
Produce and complete a Gantt Chart using MS Project software.
Using the Table below enter the information into MS Project software. Assume that each resource has
been assigned to the project activity on a full-time (8 hours /day or 40 hours per week) basis
Activity Duration Predecessors Resource Assigned
A. User Survey 4 None Gail Wilkins
B. Coding 12 A Tom Hodges
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221966_1&mode=view
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221967_1&course_id=_39688_1&assign_group_id=&mode=view
C. Debugging 5 B Wilson Pitts
D. Design Interface 6 A,C Sue Ryan
E. Develop Training 5 D Reed Taylor
Include a title page and adhere to the Publication Manual of the American Psychological Association (APA),
(6th ed., 2nd printing) when writing and submitting assignments and papers.
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through
ET410 and ET450.
WEEK 8
W8 Discussion "Closeout Process " Technical Project Management
Closeout Process
Discuss what is meant by the closeout process and what elements do you think would
apply to your project?
W8 Assignment "Tunnel Cost Comparisons" Technical Project Management
Tunnel Cost Comparisons
Question 1: 1. Write a 1 - 2 page paper. In your paper discuss the following:
a. Search the internet for the link to the Boston tunnel, “the Big Dig” or the “Channel Tunnel,” and London’s Millennium Dome. In spite of their poor cost performance, why do you think these projects were supported to their conclusion? What would it take to kill a high visibility project such as these? b. Provide a comparison of the projects, what extent were the cost overruns and how were the overruns handled by the authorities. c. Include a title page and adhere to the Publication Manual of the American Psychological Association (APA), (6th ed., 2nd printing) when
https://lms.grantham.edu/webapps/blackboard/content/launchLink.jsp?course_id=_39688_1&content_id=_3221977_1&mode=view
https://lms.grantham.edu/webapps/assignment/uploadAssignment?content_id=_3221978_1&course_id=_39688_1&assign_group_id=&mode=view
writing and submitting assignments and papers. Make sure to provide references. Question 2: Submit a document with the following documents compiled in one. Save it as “ET410 Final Report_GID.docx”. Remember that you will be submitting this in ET450.
Project Proposal Requirements Document and Systems Design Review Document Final Schedule Final Budget Lessons Learned Document
Update the Lessons Learned Document and submit with your proposal. Remember that the template is
found in Week 1. You will be using this template as a running document, adding to it as you go through