Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

Can c&h recover the liquidated damages from sun ship

28/04/2021 Client: muhammad11 Deadline: 2 Day

Assignment
Prepare answers to the following chapter-end Critical Legal Thinking Cases from this week's reading.

Case 16.1: Specific Performance on page 278
16.1 Specific Performance The California and Hawaiian Sugar Company (C&H), a California corporation, is an agricultural cooperative owned by 14 sugar plantations in Hawaii. It transports raw sugar to its refinery in Crockett, California. Sugar is a seasonal crop, with about 70 percent of the harvest occurring between April and October. C&H requires reliable seasonal shipping of the raw sugar from Hawaii to California. Sugar stored on the ground or left unharvested suffers a loss of sucrose and goes to waste.

After C&H was notified by its normal shipper that it would be withdrawing its services at a specified date in the future, C&H commissioned the design of a large hybrid vessel—a tug of a catamaran design consisting of a barge attached to the tug. After substantial negotiation, C&H contracted with Sun Ship, Inc. (Sun Ship), a Pennsylvania corporation, to build the vessel for $25,405,000. The contract gave Sun Ship one and three quarter years to build and deliver the ship to C&H. The contract also contained a liquidated damages clause calling for a payment of $17,000 per day for each day that the vessel was not delivered to C&H after the agreed-upon delivery date. Sun Ship did not complete the vessel until eight and one-half months after the agreed-upon delivery date. Upon delivery, the vessel was commissioned and christened the Moku Pahu.

During the season that the boat had not been delivered, C&H was able to find other means of shipping the crop from Hawaii to its California refinery. Evidence established that actual damages suffered by C&H because of the nonavailability of the vessel from Sun Ship were $368,000. When Sun Ship refused to pay the liquidated damages, C&H filed suit to require payment of $4,413,000 in liquidated damages under the contract. Can C&H recover the liquidated damages from Sun Ship?California and Hawaiian Sugar Company v. Sun Ship, Inc., 794 F.2d 1433, Web 1986 U.S. App. Lexis 27376 (United States Court of Appeals for the Ninth Circuit)

Case 18.7: Goods or Service on page 313
18.7 Good or Service Frances Hector entered Cedars-Sinai Medical Center (Cedars-Sinai), Los Angeles, California, for a surgical operation on her heart. During the operation, a pacemaker was installed in Hector. The pacemaker, which was manufactured by American Technology, Inc., was installed at Cedars-Sinai Medical Center by Hector’s physician, Dr. Eugene Kompaniez. The pacemaker was defective, causing injury to Hector. Hector sued Cedars-Sinai Medical Center under Article 2 (Sales) of the UCC to recover damages for breach of warranty of the pacemaker. Hector alleged that the surgical operation was primarily a sale of a good and therefore covered by the UCC. Cedars-Sinai Medical Center argued that the surgical operation was primarily a service and therefore the UCC did not apply.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Smart Homework Helper
Calculation Master
Engineering Guru
Top Class Engineers
Top Academic Guru
Accounting Homework Help
Writer Writer Name Offer Chat
Smart Homework Helper

ONLINE

Smart Homework Helper

I have read and understood all your initial requirements, and I am very professional in this task.

$19 Chat With Writer
Calculation Master

ONLINE

Calculation Master

I have read your project details. I can do this within your deadline.

$42 Chat With Writer
Engineering Guru

ONLINE

Engineering Guru

Give me a chance, i will do this with my best efforts

$20 Chat With Writer
Top Class Engineers

ONLINE

Top Class Engineers

You can award me any time as I am ready to start your project curiously. Waiting for your positive response. Thank you!

$29 Chat With Writer
Top Academic Guru

ONLINE

Top Academic Guru

I have read and understood all your initial requirements, and I am very professional in this task.

$24 Chat With Writer
Accounting Homework Help

ONLINE

Accounting Homework Help

I am known as Unrivaled Quality, Written to Standard, providing Plagiarism-free woork, and Always on Time

$22 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Leadership development programs in hsos - The berlin wall worksheet - Unleash Your Inner Drift King in This Addictive 3D Driving Game! - The ugly american book sparknotes - Round robin scheduling code in c++ - United cereal case study solutions - South canyon fire map - Compassion fatigue within nursing practice a concept analysis - ?? same-day +27833173182 HLOTSE - LERIBE ABORTION CLINIC // PILLS,,,, - Sample of sales letter using aida formula - Castaway cafe forks wa - Starfleet acad grad at the helm crossword - Nike just do it campaign case study - Southern cross community healthcare - Unit 1 Discussion Public Administration - Fence repair spike wickes - Special Education Videos - Class b push pull amplifier - Balcony railing height requirements nsw - Main discussion - 2008 general maths hsc - Informative speech proposal - Walter benjamin paris capital of the 19th century - Soap note for crohn's disease - Business Math (Inventory development plan) - Financial instruments in capital market - Your in Communication - P3#1 - Fraud is defined as failure to use reasonable care in the performance of services. - Emerging Threats counterness - Writing exam for penn foster - Perspex rod static electricity - Need in 8 hours - Friend or foe book review - Iso 17025 document control procedure - What is a reporting application name five basic reporting operations - Concrete mix ratio for pond - Belief ppt presentation - Chris burden velvet water - Aristotle nicomachean ethics cliff notes - British heart foundation ownership - Paper - Question to be answered - Why does wheeled coach have excess inventory - Www weblearn london met - Understanding and managing organizational behavior 6th edition pdf - What are the five themes of geography - Vcaa biology exam 2010 - Exploring the properties of gases lab report answers - Information System Application for Decision Making - Chemistry placement exam practice - Sop for bachelor of commerce - Hsbc bank in bangladesh - Tapetum lucidum cow eye - Discussion - Reading Notes - Case Study - Case 6 national collegiate athletic association ethics and compliance program - Sons of korah psalm 91 - Discussion: Alternate Selection Procedure Validation Processes - Iki indicator 1 ml 2.1 in glass vial - 5x 6y 30 0 5x 4y 20 0 - Sbar a shared mental model for improving communication between clinicians - 19mm scyon secura flooring - Openstax org details books us history - British heart rhythm society - Business analytics statement of purpose - H r diagram lab answers - Using MS Word, create a table like the one below. Use the cover sheet. Save the file with a good file name. Upload to the course website. - Research Paper - Spanish101 - Peyton approved statement of retained earnings - Ziggurat of ur drawing - 6a orietta court angle vale - Invent to learn book - How to win marketing simulation managing segments & customers - Covington city public schools - Reverse saturation current of silicon diode - War on people with low average intelligence - The great gatsby chapter 7 literary devices - Did ned kellys mum sell him - Organization leadership 7 - Skill based assessment packet tracer - Ias 18 full standard - Study curtincollege edu au - .610 as a fraction - ((@A to Z))@ +91-9799046502 lovE ProblEm solutioN SpEcIaList MoLvI Ji uk. - Food chain and food web worksheets for grade 7 - Assignment - Bastion post mix concrete - Medical office database erd - How to change the theme to retrospect in excel - Final law and ethics paper outline - Mark weinstein has been working on an advanced technology - Institute of industrial arts technology education - 2015 practice test 1 psat nmsqt answers - Gender Differences In Early Development - The cruelest sport exploring the text answers - Critical reasoning - Research Paper