Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

Can c&h recover the liquidated damages from sun ship

28/04/2021 Client: muhammad11 Deadline: 2 Day

Assignment
Prepare answers to the following chapter-end Critical Legal Thinking Cases from this week's reading.

Case 16.1: Specific Performance on page 278
16.1 Specific Performance The California and Hawaiian Sugar Company (C&H), a California corporation, is an agricultural cooperative owned by 14 sugar plantations in Hawaii. It transports raw sugar to its refinery in Crockett, California. Sugar is a seasonal crop, with about 70 percent of the harvest occurring between April and October. C&H requires reliable seasonal shipping of the raw sugar from Hawaii to California. Sugar stored on the ground or left unharvested suffers a loss of sucrose and goes to waste.

After C&H was notified by its normal shipper that it would be withdrawing its services at a specified date in the future, C&H commissioned the design of a large hybrid vessel—a tug of a catamaran design consisting of a barge attached to the tug. After substantial negotiation, C&H contracted with Sun Ship, Inc. (Sun Ship), a Pennsylvania corporation, to build the vessel for $25,405,000. The contract gave Sun Ship one and three quarter years to build and deliver the ship to C&H. The contract also contained a liquidated damages clause calling for a payment of $17,000 per day for each day that the vessel was not delivered to C&H after the agreed-upon delivery date. Sun Ship did not complete the vessel until eight and one-half months after the agreed-upon delivery date. Upon delivery, the vessel was commissioned and christened the Moku Pahu.

During the season that the boat had not been delivered, C&H was able to find other means of shipping the crop from Hawaii to its California refinery. Evidence established that actual damages suffered by C&H because of the nonavailability of the vessel from Sun Ship were $368,000. When Sun Ship refused to pay the liquidated damages, C&H filed suit to require payment of $4,413,000 in liquidated damages under the contract. Can C&H recover the liquidated damages from Sun Ship?California and Hawaiian Sugar Company v. Sun Ship, Inc., 794 F.2d 1433, Web 1986 U.S. App. Lexis 27376 (United States Court of Appeals for the Ninth Circuit)

Case 18.7: Goods or Service on page 313
18.7 Good or Service Frances Hector entered Cedars-Sinai Medical Center (Cedars-Sinai), Los Angeles, California, for a surgical operation on her heart. During the operation, a pacemaker was installed in Hector. The pacemaker, which was manufactured by American Technology, Inc., was installed at Cedars-Sinai Medical Center by Hector’s physician, Dr. Eugene Kompaniez. The pacemaker was defective, causing injury to Hector. Hector sued Cedars-Sinai Medical Center under Article 2 (Sales) of the UCC to recover damages for breach of warranty of the pacemaker. Hector alleged that the surgical operation was primarily a sale of a good and therefore covered by the UCC. Cedars-Sinai Medical Center argued that the surgical operation was primarily a service and therefore the UCC did not apply.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Smart Homework Helper
Calculation Master
Engineering Guru
Top Class Engineers
Top Academic Guru
Accounting Homework Help
Writer Writer Name Offer Chat
Smart Homework Helper

ONLINE

Smart Homework Helper

I have read and understood all your initial requirements, and I am very professional in this task.

$19 Chat With Writer
Calculation Master

ONLINE

Calculation Master

I have read your project details. I can do this within your deadline.

$42 Chat With Writer
Engineering Guru

ONLINE

Engineering Guru

Give me a chance, i will do this with my best efforts

$20 Chat With Writer
Top Class Engineers

ONLINE

Top Class Engineers

You can award me any time as I am ready to start your project curiously. Waiting for your positive response. Thank you!

$29 Chat With Writer
Top Academic Guru

ONLINE

Top Academic Guru

I have read and understood all your initial requirements, and I am very professional in this task.

$24 Chat With Writer
Accounting Homework Help

ONLINE

Accounting Homework Help

I am known as Unrivaled Quality, Written to Standard, providing Plagiarism-free woork, and Always on Time

$22 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Discussion: Pediatric Bipolar Depression Disorder Debate Week 8 - Unit II Assignment - If we must die summary - Week 8 Aram Tawoosi - How to write a case study report in counselling - The quantities s and t are positive - ResP2 - On january the total market value - Apogee field panel user's manual 125 3000 - Analysis/Critique of Major Event Paper - Certificate ii in retail services online - Chcdiv002 assessment 1 answers - The stock of business adventures sells for $40 - The murderous mansion of mr uno script - Danske bank daily withdrawal limit - What to include in a rationale - Agriculture Class questions - How to separate iron filings and sand - Kinetic molecular theory kmt worksheet answer key - Cold and warm front symbols - Anatomy and physiology II - Green lane health centre - Audience benefits and the you view - 120 point inspection checklist - Ryanair organisational structure chart - Tax return cash flow analysis worksheet - "Ethical Dilemmas in Business: A Management Assignment Demonstration" - Presented below is the adjusted trial balance of kelly corporation - 605 45 principal agent considerations - 2000 by applied practice austin tx answers the odyssey - Balance sheet ratio analysis excel - Family focused functional assessment questionnaire - Economics Assignment - Sociological theory in the classical era 2nd edition pdf - Discussion 6 - Donabedian's structure process outcome paradigm - Graduate Education Assistance - What were the rules of the ancient olympics - Julius caesar no fear shakespeare act 2 - What is the purpose of a windshield survey - Introduction to business ethics desjardins pdf - No plagiarism plz POL 201 American National Government Final paper - 1-3 Short Paper: Retail Merchandise Management - Freeman 1984 stakeholder definition - NRS 451-VN-0501 Nursing Leadership - 8 qualities of hanuman - C11E Assignment 4 - Something wicked this way comes quote - External financing needed formula - The anatomy of an egg - Cell counting kit 8 protocol - Starbucks after schultz how to sustain a competitive advantage - Data analysis plus excel 2016 download - Enrollment amendment form monash - Adele's esl corner past continuous - Chemical or physical change lab - Legal issues with facebook - Supplies balance sheet or income statement - Talley and o'connor neurological examination - The Mainstream Theoretical Perspectives of IR - Under armour annual report 2015 - Sea cucumber skin microscope - Icivics congress in a flash - Dunkin donuts organizational structure - Input and output devices for kids - Humanities through the arts 9th edition free pdf - 4 quadrant multiplier ic - Access credential manager as a trusted caller - Future trends - Under what circumstances is an inventory rollback typically performed - Cell phone use in school debate - Match the graphs with their parametric equations - Lab Report: Microbial Growth - Effects of Temperature - Mitsubishi electric motor distributor - Dance studio rental agreement - Health policy and perspectives grid assignment - +91-8306951337 love marriage specialist astrologer IN Gwalior - What is 2 3 cubed - South dakota v. dole - The mediocre teacher tells - Federico mahora perfume list - Ethical issues in journalism - Molecular weight of cucl2 2h2o - Detailed Description - Software Development - Discussion - International Preparation - Ring out the bells let's celebrate - Walton is retelling a story he heard from Frankenstein. - How does growth on the unopened plates affect the reliability - What is an exegesis - Position paper - Embry riddle worldwide catalog - Integrated marketing mix tutor2u - Conformity in the catcher in the rye - And then there were none chapter 11 - Some recent financial statements for smolira golf corp follow - Bible Essay - Engineering ethics charles b fleddermann pdf - Week 6 - Factors affecting evaporation ppt - An occurrence at owl creek bridge comprehension questions