Chapter 7 cash flow analysis

13/11/2021 Client: muhammad11 Deadline: 2 Day

Determinants Of Capital Structure Spreadsheet/ Discounted Cash Flow Analysis Spreadsheet

Higgins, Analysis for Financial Management 1

Analysis for Financial Management

Robert C. Higgins

Spreadsheet Tutorial

to accompany Chapter 7

Discounted Cash Flow Analysis

Introduction: This spreadsheet tutorial will give you practice with the functions and tools in Excel

that allow you to value projects using discounted cash flow analysis. Follow the instructions on this

handout using the accompanying Excel spreadsheet. Use your spreadsheet to answer the questions

in each of the problems below. The instructions are based on Excel 2013 for a PC, so you may need

to make some adjustments if you are using a different spreadsheet, such as Calc or Excel for a Mac.

Instructions:

Project #1

Complete the cash flow projections and find the NPV for this project. Initial CAPX are $20,000

and depreciated on a 10-year MACRS schedule (the percentages of initial cost allowed for

depreciation under the current U.S. tax system). Net working capital required is $5,000 (just a one-

time increase) over the life of the project. Incremental sales are $22,000 per year and incremental

operating expenses are $18,000 per year. Assume that plant and equipment is disposed of at the end

of year 7 (it has no resale value). The tax rate is 30%. Assume a WACC of 9.3%.

Note that the spreadsheet is set up so that assumptions (things you can change later) go in the green

cells, and that the other cells contain formulas based on the assumptions.

1. Assumptions. Fill in the assumptions section first. Put in the tax rate across the whole row. Put

in the MACRS percentages. (The quickest way to do this is to copy them from the MACRS

schedule, then go to where you want to paste the values, select Paste Special, click on Values and

Transpose, and hit OK.) Enter the WACC and the resale value.

2. Balance sheet items. I find the cash flow projections are easier if we track two balance sheet

items, Net Working Capital and Net PPE. In the NWC line, enter the amount that will be required

for the project in each year. Note that the NWC must be in place by (the end of) Year 0, and would

be gone by (the end of) year 7. Keep in mind that this line is the level of NWC in each year, not the

change in NWC.

In the Net PPE line, we are going to track the book value of the assets we acquire for this project.

So in the green cell (Year 0) put the amount of the initial CAPX. In subsequent years the Net PPE

will be Net PPE from the previous year minus depreciation from that year. (Go ahead and enter this

formula even though depreciation isn’t entered yet.)

3. Getting EBIT(1–t). Enter sales and expense for Years 1-7. Enter depreciation expense for each

year, which is the initial value of PPE times the MACRS percentage for that year. Enter the

formula for EBIT, which is sales less operating expenses and depreciation. Enter taxes, which is the

tax rate times EBIT, and then enter the formula for EBIT(1–t).

Higgins, Analysis for Financial Management 2

4. CAPX. In year 0, CAPX is just equal to the initial value of our PPE, so just enter a formula that

references that cell.

The other thing we want to account for here is selling PPE at the end of the project. Put this in the

next line below CAPX. In Year 7 we get a cash inflow from selling the equipment for resale value

(RV), and the we also pay taxes on the gain over book value (BV). Here the RV is given in the

assumptions, and the BV is the value of Net PPE in Year 7. So enter a formula in Year 7 under

CAPX that reflects: RV– (RV–BV)*t where t is the tax rate.

5. Change in NWC. For the change in NWC (ΔNWC), for Year 0, we just make it equal to the

initial amount of NWC in Year 0 from above. For Years 1-7, the change in NWC is just that year’s

NWC minus the previous year’s NWC.

6. Cash Flows. Now we’re ready to calculate cash flow each year, and all we do is apply the

formula: EBIT(1–t)+Dep. –CAPX–ΔNWC. Enter this formula and copy it across for all years 0-7.

Then the only change necessary is to also add in the sale of PPE in year 7 to the year 7 cash flows.

7. NPV. Now enter the formula for NPV on the last line. Remember that the NPV function in

Excel discounts the first value by one year, so don’t put the initial cash flow inside the NPV

function. Add this in separately.

Q1: What is the NPV of the project under the given assumptions? ____________

Q2: How low would the initial investment have to be in order to make this project acceptable?

____________

Project #2

This time we won’t go through the spreadsheet step by step. You are given the assumptions and

you must complete the projections on your own.

1. Projecting cash flows. Complete the cash flow projections for project #2. Assume the

following:

 The project has a 10-year life.  Revenues are $70,000 in year 1 and increase $5,000 per year thereafter.  Operating expenses are 70% of revenues in each year.  Initial equipment purchases are $100,000, depreciated on a 7-year MACRS schedule.  Equipment purchased will have a resale value of $30,000 at the end of the project.  The tax rate is expected to be 35% over the life of the project.  The discount rate for the project is 11.5%  Net working capital of $25,000 will need to be maintained over the life of the project.

2. Finding the NPV. Use the NPV function to find the NPV of the project.

Q3: Under the above assumptions, what is the NPV of this project? ____________

3. Finding the IRR (in two ways). Use the Goal Seek tool to find the internal rate of return on

this project. Recall that the IRR is the discount rate that makes the NPV=0. So in Goal Seek set the

NPV to 0 by changing the discount rate. After finding the IRR using Goal Seek, verify the IRR

using the IRR function (enter on line 31, below the NPV).

Q4: What is the IRR under the above assumptions? ____________

Higgins, Analysis for Financial Management 3

4. Sensitivity analysis. Note on the spreadsheet that all green cells are assumptions that you can

modify. Return the discount rate back to 11.5%. Now find the NPV of this project under the

following alternative assumptions (change only one at a time, then change back before going to the

next one):

Q5: Initial equipment purchases are $115,000 _______________

Q6: Sales in Year 1 are only $60,000, but still rise by $5,000 thereafter ___________

Q7: The equipment has no resale value _______________

Q8: The discount rate is 13% _______________

5. Creating a two-dimensional data table. Do some additional sensitivity analysis by creating a two-

dimensional data table. Create a Data Table showing what the NPV would be with discount rates of 8%,

10%, 12%, 14%, and 16% and with initial CAPX of $80,000, $90,000, $100,000, $110,000, and

$120,000. Enter the discount rates in a row (e.g. in C33:G33) and the initial CAPX values in a column

just to the left (e.g. in B34:B38). In the cell in between these two (e.g. B33) enter the reference for the

cell containing the NPV (e.g. B30). Then to create the Data Table, highlight a block that includes all the

cells you just entered and go to Data | What-if Analysis | Data Table1. The row input cell is the cell

where you would input the discount rate, and the column input cell is the cell where you would in put

the initial CAPX. Click on OK and you will have a table showing the NPV under different

combinations of assumptions.

Q9: According to your table, what would the NPV be if the discount rate were 14% and initial CAPX

were $110,000? ____________

6. Accounting for straight-line depreciation. Change the depreciation method to straight line.

Assume a 10-year life. Recall that straight line would be the same each year: (initial book value-

salvage value)/life. Estimate salvage value as being equal to the resale value.

Q10: What is the NPV of the project with straight-line depreciation (under all other initial

assumptions in #1)? _____________

7. Creating a switch with data validation. You can make it easy to switch back and forth

between straight-line and MACRS with a switch. Put the switch in a new row in the assumptions

area (e.g. line 9). In the first cell (e.g. A9), put the label “Depreciation method”. Then in the next

cell (e.g. B9) you’d enter “MACRS” or “Straight-line” depending on the desired method. But to

make entering theses choice easier, we’ll use data validation. Click on B9, then go to DATA |

DATA VALIDATION. Under “Settings”, choose to allow “List” and check the box for “In-cell

dropdown”. Then under “Source” highlight two cells somewhere inconspicuous (I put them at the

bottom of the MACRS table) where you can enter the two possible inputs: MACRS and Straight-

line. Once you have done this, cell B9 will offer a drop-down box in which you can choose

between the two depreciation methods.

In addition to making data entry easier, data validation ensures that the next part of the switch

works properly. On row 17, where you have Depreciation, you must enter an IF function in each

cell. IF functions look like this =IF(condition to check, formula if condition is true, formula if

condition is false). So you enter three arguments in each IF function. In this case it would be

something like =IF($B9=“MACRS”, enter MACRS formula here, enter straight-line formula here).

If you enter this correctly and lock in the right cells, you only have to enter one formula, which you

can then copy all the way across the row.

1 In other versions of Excel it is under Data | Table.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

High Quality Assignments
Phd Writer
Smart Homework Helper
Buy Coursework Help
Finance Homework Help
Quick Mentor
Writer Writer Name Offer Chat
High Quality Assignments

ONLINE

High Quality Assignments

As per my knowledge I can assist you in writing a perfect Planning, Marketing Research, Business Pitches, Business Proposals, Business Feasibility Reports and Content within your given deadline and budget.

$15 Chat With Writer
Phd Writer

ONLINE

Phd Writer

I am a professional and experienced writer and I have written research reports, proposals, essays, thesis and dissertations on a variety of topics.

$15 Chat With Writer
Smart Homework Helper

ONLINE

Smart Homework Helper

As an experienced writer, I have extensive experience in business writing, report writing, business profile writing, writing business reports and business plans for my clients.

$42 Chat With Writer
Buy Coursework Help

ONLINE

Buy Coursework Help

I have read your project details and I can provide you QUALITY WORK within your given timeline and budget.

$37 Chat With Writer
Finance Homework Help

ONLINE

Finance Homework Help

This project is my strength and I can fulfill your requirements properly within your given deadline. I always give plagiarism-free work to my clients at very competitive prices.

$49 Chat With Writer
Quick Mentor

ONLINE

Quick Mentor

I will provide you with the well organized and well research papers from different primary and secondary sources will write the content that will support your points.

$36 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Cu no3 2 naoh ionic equation - A science based approach to restoring gorongosa wildlife - Tradeoffs for Southwest - Disney marketing plan pdf - Digital radio coverage melbourne - Religious study, essay - Chemical equation of calcium carbonate - Good examples of advertising directed toward elderly consumers - Heavenly chocolates website transactions - Disney's design case study answers - David sedaris halloween essay - HRM 530 Week 10 Assignment 5 Employee Compensation and Benefits - Aulin 100 mg sachets - Sss aas sas rhs - What is knowledge application - I need help with my statistics project: - Greene and lidinsky habits of mind - How the kangaroo got its tail - In this unit you will submit your final research paper - Hydrogen pop test - The beginning inventory at midnight supplies - BUSN601 - Qualitative and quantitative observations worksheet answers - Embry riddle worldwide catalog - National association of social workers code of ethics apa citation - Kotter's eight step plan for implementing change - Health psychology question paper - Benefits of stepwise management of asthma - Short case study on international marketing - Christopher pettiet cause of death - Actron air wall controller - Literature review on Security Challenges in Cloud Computing - Sainsburys annual report 2011 - Copper carbonate + hydrochloric acid balanced equation - O neill kantian approaches famine summary - Acid and base diagram - Sothink movie dvd maker 3.1 registration key - Wk 5, IOP/470: DR 2 - In a laboratory experiment you wish to determine the initial speed of a dart - Confined space powerpoint presentation - How to find heat of reaction from graph - Unlike firms pursuing a global standardization strategy, firms pursuing an international strategy - Www outofservice com bigfive big five - MARKETING MANAGEMENT - DISCUSSION 8 - Cocos pizza andrews farm - Oak creek furniture factory a custom furniture - Gamescape week 2 answers - Ordinal level data are characterized by - Gladwell something borrowed - Cost accounting - Https www youtube com watch v bkorp55aqvg - Case Study - Homework - Carrington financial services john doyle - Cook door menu 2017 egypt - The body shop values - Tweet history by date - Introducing new coke case study - 7-9 countess street mosman - Journal 3 - A rough draft for a 5 paragraph essay and then final draft. - 3par 3.3 1 mu3 release notes - Edit a paragraph worksheet - Portfolio 1 - Moist heat cookery methods - Christ church preschool st ives - Discussion 3 - Relationship between professional practices and scholarly ethics - Essay - Benjamin Franklin - Lds young women handbook - So what's so bad about being so so summary - Prepare a multiple step income statement for the year - Predicting consumer tastes with big data at gap case solution - A bar of gold is in thermal contact - Florida youth soccer association - Report for experiment 22 neutralization titration 1 answers - Brisbane city council shade sail approval - 1984 mind control quotes - Sam excel project 1a - Which of the following questions is part of the “truth test” for evaluating films? - Competitive strategies enabled by information systems - What is rotational equilibrium - Lane bryant models names 2015 - Eric foner give me liberty pdf free - Three dimensional structure of pcl3 - School Counseling PPT - Strategies to restructure a diversified company's business lineup involve - Newton's second law of motion air track lab report - A form of "estar" must be used as the helping verb in a progressive tense. - Kotter's 8 stages of change - Digital Archive - Vcaa chinese second language advanced - SMGT 502 - Forum - Andy warhol death reason - Principles of computer security 4th edition mcgraw hill - Physical asset controls in maritime - Pavlov behavioral learning theory - A project manager has compiled a list of major activities - Chemical equation for hydrochloric acid