Operations Management: Sustainability and Supply Chain Management

Third Canadian Edition

Chapter 13

Aggregate Planning and Sales and Operations Planning

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

If this PowerPoint presentation contains mathematical equations, you may need to check that your computer has the following installed:

1) Math Type Plugin

2) Math Player (free versions available)

3) NVDA Reader (free versions available)

1

Outline

Global Company Profile: Frito-Lay

The Planning Process

The Nature of Aggregate Planning

Aggregate Planning Strategies

Methods for Aggregate Planning

Aggregate Planning in Services

Yield Management

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Learning Objectives (1 of 2)

When you complete this chapter you should be able to:

Define aggregate planning and sales and operations planning

Identify optional strategies for developing an aggregate plan

Prepare a graphical aggregate plan

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Learning Objectives (2 of 2)

When you complete this chapter you should be able to:

Solve an aggregate plan via the transportation method of linear programming

Understand and solve a yield management problem

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Frito-Lay (1 of 2)

More than three dozen brands, 15 brands sell more than $100 million annually, 7 sell over $1 billion

Planning processes covers 3 to 18 months

Unique processes and specially designed equipment

High fixed costs require high volumes and high utilization

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Frito-Lay (2 of 2)

Demand profile based on historical sales, forecasts, innovations, promotion, local demand data

Match total demand to capacity, expansion plans, and costs

Quarterly aggregate plan goes to 38 plants in 18 regions

Each plant develops 4-week plan for product lines and production runs

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Aggregate Planning (1 of 4)

The objective of aggregate planning is to meet forecasted demand while minimizing cost over the planning period

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Aggregate planning covers intermediate-range decisions, usually 3 to 18 months ahead.

LO 1: Define aggregate planning.

7

The Planning Process

Determine the quantity and timing of production for the intermediate future

Objective is to minimize cost over the planning period by adjusting

Production rates

Labour levels

Inventory levels

Overtime work

Subcontracting rates

Other controllable variables

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide provides the list of the major decisions undertaken in aggregate planning. Notice that scheduling of specific workers and products is not done in aggregate planning—such decisions represent short-term scheduling (Chapter 15) that will be based at the appropriate time on the constraints produced from the aggregate plan. The aggregate plan helps the firm prepare for any necessary hiring and layoffs of workers to come in the intermediate future. It also signals when to set up subcontracting relationships and orders.

8

Aggregate Planning (2 of 4)

Required for aggregate planning

A logical overall unit for measuring sales and output

A forecast of demand for an intermediate planning period in these aggregate terms

A method for determining costs

A model that combines forecasts and costs so that scheduling decisions can be made for the planning period

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide identifies the four things needed for aggregate planning.

9

Planning Horizons

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide (Figure 13.1) helps to distinguish the various planning horizons and associated tasks and personnel responsible for the decisions. Aggregate planning provides the link between long-range capacity decisions (Supplement 7) and short-range scheduling of workers and jobs (Chapter 15). Long-range capacity decisions certainly impact the flexibility of aggregate plans.

10

Aggregate Planning (3 of 4)

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide (Figure 13.2) shows how aggregate planning fits into the larger production planning system.

11

Aggregate Planning (4 of 4)

Combines appropriate resources into general terms

Part of a larger production planning system

Disaggregation breaks the plan down into greater detail

Disaggregation results in a master production schedule

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

The aggregate plan is described in general terms. Disaggregation of the plan breaks it down into more detail for more specific planning such as the master production schedule, which is a timetable that specifies what is to be made and when (Chapter 14).

12

Aggregate Planning Strategies

Use inventories to absorb changes in demand

Accommodate changes by varying workforce size

Use part-timers, overtime, or idle time to absorb changes

Use subcontractors and maintain a stable workforce

Change prices or other factors to influence demand

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This list presents legitimate planning strategies. The aggregate plan may suggest one or a combination of the strategies.

LO 2: Identify optional strategies for developing an aggregate plan.

13

Capacity Options (1 of 5)

Changing inventory levels

Increase inventory in low demand periods to meet high demand in the future

Increases costs associated with storage, insurance, handling, obsolescence, and capital investment

Shortages may mean lost sales due to long lead times and poor customer service

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

These slides describe the five capacity options, named so because they do not try to change demand but attempt to absorb demand fluctuations. Firms can change inventory levels, building up anticipatory inventory during periods of low demand. We know from Chapter 12 that inventory is expensive, so this can be a costly approach for firms experiencing very seasonal demand.

14

Capacity Options (2 of 5)

Varying workforce size by hiring or layoffs

Match production rate to demand

Training and separation costs for hiring and laying off workers

New workers may have lower productivity

Laying off workers may lower morale and productivity

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms can vary the workforce size as demand conditions change. This strategy may work well if hiring and firing costs are not too high and significant training of new employees is not necessary. The human resource implications of this strategy need to be carefully considered.

15

Capacity Options (3 of 5)

Varying production rate through overtime or idle time

Allows constant workforce

May be difficult to meet large increases in demand

Overtime can be costly and may drive down productivity

Absorbing idle time may be difficult

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms can vary production rates using overtime and idle time. This strategy may work well for short-term or relatively small demand changes, but it becomes expensive and potentially unmanageable for reacting to major demand shifts.

16

Capacity Options (4 of 5)

Subcontracting

Temporary measure during periods of peak demand

May be costly

Assuring quality and timely delivery may be difficult

Exposes your customers to a possible competitor

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms can subcontract out excess demand that they cannot handle internally. The unit cost of this strategy is typically higher than the internal production cost, and the strategy carries with it the usually risks of delegating any task.

17

Capacity Options (5 of 5)

Using part-time workers

Useful for filling unskilled or low skilled positions, especially in services

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms can use temporary or part-time workers during peak demand periods. This practice may work well, particularly in service industries. However, there have been concerns in recent years that big companies are hiring too many temporary employees and avoiding paying benefits such as health insurance in the process. Concerns like this can damage a firm’s reputation as a good corporate citizen.

18

Demand Options (1 of 3)

Influencing demand

Use advertising or promotion to increase demand in low periods

Attempt to shift demand to slow periods

May not be sufficient to balance demand and capacity

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

These slides cover demand options, through which firms try to smooth out changes in the demand pattern over the planning period. A smoother demand pattern implies less necessity for implementing one of the expensive capacity options. Instructors can present examples showing that sometimes a smooth demand pattern can result in higher overall profit than a varying pattern with higher total demand (i.e., the varying pattern might have more revenue but the additional costs of meeting that varying demand might outweigh the revenue gain).

This slide shows that firms can influence demand through the use of advertising and promotions in low-demand periods. Such strategies are also known as off-peak pricing, and we see them all the time in the form of matinee movie specials, cheap rates at ski resorts during the summer, etc. Some of this generated demand may be new customers enticed by the promotion, but the rest may be shifted demand (customers moving from high-demand periods to low-demand periods). Shifted demand produces a smoother demand pattern overall.

19

Demand Options (2 of 3)

Back ordering during high-demand periods

Requires customers to wait for an order without loss of goodwill or the order

Most effective when there are few if any substitutes for the product or service

Often results in lost sales

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms sometimes intentionally plan backorders during high-demand periods. These come at a cost and assume that customers will be willing to wait to receive the product (a potentially dangerous assumption). Firms with some sort of monopoly power are often in a better position to employ this strategy.

20

Demand Options (3 of 3)

Counterseasonal product and service mixing

Develop a product mix of counterseasonal items

May lead to products or services outside the company’s areas of expertise

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Firms sometimes employ the strategy of counterseasonal products and service mixing. Producing products with different high-demand seasons such as snowmobiles and jet skis can smooth out demand over the year. Another form of this technique sells seasonal products to markets in the Northern Hemisphere for part of the year and to markets in the Southern Hemisphere for the other part of the year.

21

Methods for Aggregate Planning

A mixed strategy may be the best way to achieve minimum costs

There are many possible mixed strategies

Finding the optimal plan is not always possible

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

A combination of the different aggregate planning options may turn out to be the best strategy. There are also two extreme strategies: chase and level.

LO 3: Prepare a graphical aggregate plan.

22

Mixing Options to Develop a Plan (1 of 2)

Chase strategy

Match output rates to demand forecast for each period

Vary workforce levels or vary production rate

Favoured by many service organizations

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide describes the chase strategy, where demand is “chased” by production. Little or no inventory is held, and the strategy may result in a significant amount of hiring and worker layoffs.

23

Mixing Options to Develop a Plan (2 of 2)

Level strategy

Daily production is uniform

Use inventory or idle time as buffer

Stable production leads to better quality and productivity

Some combination of capacity options, a mixed strategy, might be the best solution

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide describes the level strategy, where workforce levels and production rates remain constant over time. The changing inventory levels option applies here. Human resource difficulties are usually minimized using a level strategy, but the inventory costs may be significant.

24

Graphical Methods (1 of 2)

Popular techniques

Easy to understand and use

Trial-and-error approaches that do not guarantee an optimal solution

Require only limited computations

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Graphical methods represent trial-and-error approaches to the aggregate planning problem. Slide 25 identifies the five steps involved. And, actually, Steps 1–4 are required for any of the aggregate planning solution methods.

25

Graphical Methods (2 of 2)

Determine the demand for each period

Determine the capacity for regular time, overtime, and subcontracting each period

Find labour costs, hiring and layoff costs, and inventory holding costs

Consider company policy on workers and stock levels

Develop alternative plans and examine their total costs

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Graphical methods represent trial-and-error approaches to the aggregate planning problem. Slide 25 identifies the five steps involved. And, actually, Steps 1–4 are required for any of the aggregate planning solution methods.

LO 3: Prepare a graphical aggregate plan.

26

Roofing Supplier Example 1 (1 of 2)

Table 13.2 Monthly Forecasts

Month Expected Demand Production Days Demand Per Day (computed)
Jan 900 22 41
Feb 700 18 39
Mar 800 21 38
Apr 1200 21 57
May 1500 22 68
June 1100 20 55
6200 124 Blank
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

These slides cover continuing Examples 1–4 from the text. Slide 26 presents the demand data for the examples. Note that the daily demand is based on the number of production days per month, which varies for this firm. Slide 27 graphs the average forecasted monthly demand per day as compared to the average daily demand overall of 50 units. The ensuing three examples present three different strategies for meeting the forecasted demand. Slides 28–31 present the raw data along with Example 2—a level strategy with constant workforce. This strategy builds anticipatory inventory in the first few months to be drawn down in later months. The only costs incurred are regular labour and inventory costs.

27

Roofing Supplier Example 1 (2 of 2)

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 2 (1 of 4)

Table 13.3

Cost Information Blank
Inventory carrying cost $ 5 per unit per month
Subcontracting cost per unit $20 per unit
Average pay rate $10 per hour ($80 per day)
Overtime pay rate $17 per hour (above 8 hours per day)
Labour-hours to produce a unit 1.6 hours per unit
Cost of increasing daily production rate (hiring and training) $300 per unit
Cost of decreasing daily production rate (layoffs) $600 per unit
Plan 1 – constant workforce

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 2 (2 of 4)

Month Production Days Production at 50 Units per Day Demand Forecast Monthly Inventory Change Ending Inventory
Jan 22 1100 900 +200 200
Feb 18 900 700 +200 400
Mar 21 1050 800 +250 650
Apr 21 1050 1200 -150 500
May 22 1100 1500 -400 100
June 20 1000 1100 -100 0
1,850
Total units of inventory carried over from one month to the next = 1850 units

Workforce required to produce 50 units per day = 10 workers

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 2 (3 of 4)

Costs Calculations
Inventory carrying $9250 (= 1850 units carried x $5 per unit)
Regular-time labour 99 200 (= 10 workers x $80 per day x 124 days)
Other costs (overtime, hiring, layoffs, subcontracting) 0
Total cost $108 450
Total units of inventory carried over from one month to the next = 1850 units

Workforce required to produce 50 units per day = 10 workers

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 2 (4 of 4)

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 3 (1 of 5)

Table 13.2 Monthly Forecasts

Month Expected Demand Production Days Demand Per Day (computed)
Jan 900 22 41
Feb 700 18 39
Mar 800 21 38
Apr 1200 21 57
May 1500 22 68
June 1100 20 55
Blank 6200 124 Blank
Plan 2 – subcontracting

Minimum requirement = 38 units per day

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Slides 32–36 present Example 3—a level strategy to cover the lowest-demand period along with subcontracting for all other months. The only costs incurred are regular labour (lower than Example 2) and subcontracting.

33

Roofing Supplier Example 3 (2 of 5)

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 3 (3 of 5)

Table 13.3

Cost Information
Inventory carrying cost $ 5 per unit per month
Subcontracting cost per unit $20 per unit
Average pay rate $10 per hour ($80 per day)
Overtime pay rate $17 per hour (above 8 hours per day)
Labour-hours to produce a unit 1.6 hours per unit
Cost of increasing daily production rate (hiring and training) $300 per unit
Cost of decreasing daily production rate (layoffs) $600 per unit
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 3 (4 of 5)

In-house production = 38 units per day × 124 days

= 4712 units

Subcontract units = 6200 – 4712

= 1488 units

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 3 (5 of 5)

Costs Calculations
Regular-time labour $75 392 (= 7.6 workers × $80 per day × 124 days)
Subcontracting 29 760 (= 1488 units × $20 per unit)
Total cost $105 152
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 4 (1 of 4)

Table 13.2 Monthly Forecasts

Month Expected Demand Production Days Demand Per Day (computed)
Jan 900 22 41
Feb 700 18 39
Mar 800 21 38
Apr 1200 21 57
May 1500 22 68
June 1100 20 55
Blank 6200 124 Blank
Plan 3 – hiring and layoffs

Production = Expected Demand

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Slides 37–40 present Example 4—a chase strategy via hiring and layoffs. The costs incurred in this plan are regular labour, hiring, and layoff costs.

38

Roofing Supplier Example 4 (2 of 4)

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 4 (3 of 4)

Table 13.3

Cost Information Blank
Inventory carrying cost $ 5 per unit per month
Subcontracting cost per unit $20 per unit
Average pay rate $10 per hour ($80 per day)
Overtime pay rate $17 per hour (above 8 hours per day)
Labour-hours to produce a unit 1.6 hours per unit
Cost of increasing daily production rate (hiring and training) $300 per unit
Cost of decreasing daily production rate (layoffs) $600 per unit
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Roofing Supplier Example 4 (4 of 4)

Table 13.4 Cost Computations for Plan 3

Month Forecast (units) Daily Prod Rate Basic Production Cost (demand × 1.6 hrs/unit × $10/hr) Extra Cost of Increasing Production (hiring cost) Extra Cost of Decreasing Production (layoff cost) Total Cost
Jan 900 41 $ 14 400 — — $ 14 400
Feb 700 39 11 200 — $1200 (= 2 × $600) 12 400
Mar 800 38 12 800 — $600 (= 1 × $600) 13 400
Apr 1200 57 19 200 $5 700 (= 19 × $300) — 24 900
May 1500 68 24 000 $3300 (= 11 × $300) — 27 300
June 1100 55 17 600 — $7,800 (= 13 × $600) 25 400
$99 200 $9000 $9,600 $117 800
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Comparison of Three Plans

Table 13.5 Comparison of the Three Plans

Cost Plan 1 Plan 2 Plan 3
Inventory carrying $ 9250 $ 0 $ 0
Regular labour 99 200 75 392 99 200
Overtime labour 0 0 0
Hiring 0 0 9000
Layoffs 0 0 9600
Subcontracting 0 29 760 0
Total cost $108 450 $105 152 $117 800
Plan 2 is the lowest cost option

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Slide 41 summarizes the costs of the three plans. In this problem, the subcontracting option was the best among the three options, although that would certainly not always be the case.

42

Mathematical Approaches

Useful for generating strategies

Transportation Method of Linear Programming

Produces an optimal plan

Management Coefficients Model

Model built around manager’s experience and performance

Other Models

Linear Decision Rule

Simulation

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

This slide identifies the mathematical approaches for generating good strategies that are described in the text.

LO 4: Solve an aggregate plan via transportation method of linear programming.

43

Management Coefficients Model

Builds a model based on manager’s experience and performance

A regression model is constructed to define the relationships between decision variables

Objective is to remove inconsistencies in decision making

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

The idea behind the management coefficients model is quite different. We assume that previous decisions were good ones and so we create a regression model that relates certain input variables such as demand and labour to past aggregate planning decisions. Future decisions can be based on the resulting regression equations. This minimizes inconsistencies in future decision making.

44

Other Models

Linear Decision Rule

Minimizes costs using quadratic cost curves

Operates over a particular time period

Simulation

Uses a search procedure to try different combinations of variables

Develops feasible but not necessarily optimal solutions

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Two other models are mentioned in this slide. One of the most important original foundational operations management models was the famous HMMS rule, developed by Holt, Modigliani, Muth, and Simon. This model handles quadratic cost curves, which in some situations may be more realistic than linear cost models.

Computer simulation, on the other hand, represents a high-volume trial-and-error method, searching for the best alternative among many possibilities. The main downside of simulation that that optimal solutions are not guaranteed.

45

Summary of Aggregate Planning Methods (1 of 2)

Table 13.8 Summary of Four Major Aggregate Planning Methods

Techniques Solution Approaches Important Aspects
Graphical methods Trial and error Simple to understand and easy to use. Many solutions; one chosen may not be optimal
Transportation method of linear programming Optimization LP software available; permits sensitivity analysis and new constraints; linear functions may not be realistic
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

These slides reproduce Table 13.8 from the text, comparing aggregate planning techniques.

46

Summary of Aggregate Planning Methods (2 of 2)

Table 13.8 Continued

Techniques Solution Approaches Important Aspects
Management coefficients model Heuristic Simple, easy to implement; tries to mimic manager’s decision process; uses regression
Simulation Change parameters Complex; may be difficult to build and for managers to understand
Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

These slides reproduce Table 13.8 from the text, comparing aggregate planning techniques.

47

Aggregate Planning in Services

Controlling the cost of labour is critical

Accurate scheduling of labour-hours to assure quick response to customer demand

An on-call labour resource to cover unexpected demand

Flexibility of individual worker skills

Flexibility in rate of output or hours of work

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Copyright © 2020 Pearson Canada Inc.

13 - ‹#›

Aggregate planning techniques apply equally as well in services as in manufacturing, but services often implement more demand management strategies. As the control of labour cost is critical in service firms, this slide identifies four successful techniques for doing that

48

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Coursework Assignment Help
Engineering Exam Guru
Ideas & Innovations
Accounting & Finance Specialist
Instant Assignments
Top Academic Guru
Writer Writer Name Offer Chat
Coursework Assignment Help

ONLINE

Coursework Assignment Help

I am a PhD writer with 10 years of experience. I will be delivering high-quality, plagiarism-free work to you in the minimum amount of time. Waiting for your message.

$26 Chat With Writer
Engineering Exam Guru

ONLINE

Engineering Exam Guru

I have read your project details and I can provide you QUALITY WORK within your given timeline and budget.

$48 Chat With Writer
Ideas & Innovations

ONLINE

Ideas & Innovations

I reckon that I can perfectly carry this project for you! I am a research writer and have been writing academic papers, business reports, plans, literature review, reports and others for the past 1 decade.

$42 Chat With Writer
Accounting & Finance Specialist

ONLINE

Accounting & Finance Specialist

Being a Ph.D. in the Business field, I have been doing academic writing for the past 7 years and have a good command over writing research papers, essay, dissertations and all kinds of academic writing and proofreading.

$36 Chat With Writer
Instant Assignments

ONLINE

Instant Assignments

I can assist you in plagiarism free writing as I have already done several related projects of writing. I have a master qualification with 5 years’ experience in; Essay Writing, Case Study Writing, Report Writing.

$20 Chat With Writer
Top Academic Guru

ONLINE

Top Academic Guru

I have read your project description carefully and you will get plagiarism free writing according to your requirements. Thank You

$28 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

El ecoalbergue finca esperanza verde se encuentra en una zona montañosa de costa rica. - Fox group holdings pty ltd - Call and response taking a stand essay - Gorka deli in orland park - Superdry questionnaire answers - Describe and evaluate what pfizer is doing - Difference between encoder and tachometer - CCIS- Art- Final Paper (3times) - Common threats against contemporary information systems - It planning at modmeters case study - Raymond taylor wheel of fortune dead - Words their way spelling lists - Mutually exclusive vs independent - BUSM3199 Ethics and Governance RMIT - Tear past perfect tense - 3820 assignment 1 - 3 total - Discussion - Spec 44 wire current rating - Assignment cover sheet utas - Research paper - What is the iupac name for ch3 ch2 ch2 sh - Giga is equal to - Merrill lynch merger into bank of america - Jb hi fi tv warranty - Calculate the formula weight of khp - Genre and Genre Theory Help Late assignment no plagiarism please if possible due this evening or tomorrow. - History - Ir reflow temperature profile - Ben madigan school belfast - Cmt interview clinical scenarios - Pepsico internal strengths and weaknesses - Is it rude to fart at the dinner table - How do i find out my tasc results - Health care Management - Walk the Talk - Research Customer Service Policies - Write a balanced equation for the decomposition of h2o2 - Overnight hiking at wilsons prom - Symantec ghost error 36000 internal inconsistency - Alt everything the youth market and the marketing of cool - Triage assessment form for crisis intervention - When i heard the learn d astronomer meaning - Give me liberty 4th edition volume 2 pdf free - Discussion post in regards to research methods experience from a student point of view. - 1206 ledbury dr smyrna tn - Vce english language study design - Mid term break questions - The walt disney company the entertainment king case pdf - Mg oh 2 h2so3 - MHA500 Module 2 - Nurse mission statement - Torque detail mirror shine - Ted michael tilson thomas - Concentration of acetic acid in vinegar - IP1 - Ashford University Career Services Exploration Part 2 - Medical assisstant - The angular difference between true north and magnetic north is - Mha 516 4 - The three phases of change are - Cert 3 individual support aged care - Advanced Ergonomics - 40a sellick drive croydon - 8 point dif fft example - Work energy theorem reviewed mastering physics - Branches of physical science ppt - Ups case study mis - Nursing- evidence based - Food and beverage directors expect a pour cost of - Comparative financial statement data for carmono company - Route of north south interconnector - The new monogamy book - Introduction TO CRIMINAL JUSTICE - 6 - Creedy v for vendetta - ENGLISH Assignment Instructions: Frankenstein Application Essay The Frankenstein Application Essay - The garden spot charlottesville virginia - Texas teachers lesson plans - Equipotentials and electric fields lab report - Mass communication 7th edition hanson - Week 4: Direct Care Project Part 2: Planning the Presentation (Graded) - Cas 27939 60 2 - 120 endicott loop dunsborough - Phil week 2 - Estimate at completion formula - What is design intent in architecture - Music 101 final exam - Delta connected induction motor - Supply Chain Design - Carmen camry operates a consulting firm - Limited scope radiography laws in indiana - Course Project Part I - 3d mems optical switch - Annotated Bibligraphy - Accuracy and precision worksheet answers key - Www rjframing com au - Hi q antenna base station - Verbal and nonverbal communication and listening skills paper - How to fill 8d report - Forensic factor lasting impressions answers - R programming theory answers needed