Discussion: Layout Strategies
22 unread replies.22 replies.
· Note:
You must post early enough to give your fellow students time to read your initial post and comment on it; then, you must respond to their comment(s) or question(s) regarding your point of view. This is a must!
· These are open discussion topics. Do not think of these topics as questions you must answer. The forum is meant for you to express your learning and questions and conclusions you have.
· Do not go to some website and copy and paste. Use your learning this week to apply your analytical skills in order to further your learning.
· Your initial post should be about 700 -800words.
· Formatting and style is APA. Ensure that all external sources are properly cited within the text and is referenced appropriately at the end of the paper, including your course materials.
Discussion Topic
Read the Case "Facility Layout at Wheeled Coach" - CH 9 and respond to the following:
· Discuss various analytical techniques are available to help a company like Wheeled Coach deal with layout problems and explain the reasons for your choice.
· Provide a few concrete suggestions to Bob Collins to improve his layout?
· How would you measure the “efficiency” of this layout?
Show your understanding of the OM chapter concepts and the specific case situation
Video Case Process Strategy at Wheeled Coach
Wheeled Coach, based in Winter Park, Florida, is the world’s largest manufacturer of ambulances. Working four 10-hour days each week, 350 employees make only custom-made ambulances; virtually every vehicle is unique. Wheeled Coach accommodates the marketplace by providing a wide variety of options and an engineering staff accustomed to innovation and custom design. Continuing growth, which now requires that more than 20 ambulances roll off the assembly line each week, makes process design a continuing challenge. Wheeled Coach’s response has been to build a focused factory: Wheeled Coach builds nothing but ambulances. Within the focused factory, Wheeled Coach established work cells for every major module feeding an assembly line, including aluminum bodies, electrical wiring harnesses, interior cabinets, windows, painting, and upholstery.
Labor standards drive the schedule so that every work cell feeds the assembly line on schedule, just-in-time for installations. The chassis, usually that of a Ford truck, moves to a station at which the aluminum body is mounted. Then the vehicle is moved to painting. Following a custom paint job, it moves to the assembly line, where it will spend 7 days. During each of these 7 workdays, each work cell delivers its respective module to the appropriate position on the assembly line. During the first day, electrical wiring is installed; on the second day, the unit moves forward to the station at which cabinetry is delivered and installed, then to a window and lighting station, on to upholstery, to fit and finish, to further customizing, and finally to inspection and road testing. The Global Company Profile featuring Wheeled Coach, which opens Chapter 14, provides further details about this process.