Read the file CC6740HW, below. This is a defensive company operation order. You will reference this order to write your platoon operation order. You may also refer to the OSMEAC Guide as well as CC6740REQA, Platoon in the Defense, found below in your Supplemental Readings, to help with some of the finer details of your order. The map is 1:25,000 digital map of the AOR. You may use the map or some other media to show your work, but you must show your work using the correct operational terms and graphics.
Annex A: Platoon Defensive OpOrd example Mission Statement: 1st Platoon, you are the company ME. NLT 28AUG1200R2009, block the enemy platoon south, in the vicinity of the Rawah Bridge, in order to prevent the enemy from interfering with the Bn ME attack to the north. Example Defensive Scheme of Maneuver: On order, we will conduct a platoon battle position in the vicinity of Hill 265 with one main effort and four supporting efforts. The defense will be oriented to the northeast. The ME will occupy the center of the battle position, SE 1 will occupy to the left of the main effort, while SE 2 occupies to the right of the main effort. SE 3 and SE 4 will provide direct fire and obstacle support for the platoon battle position. The platoon will cross the Line of Departure in a platoon column. Order of movement will be the Main Effort followed by SE 1, SE 3, SE 4, then SE 2. The platoon will pass through Checkpoint 27 before consolidating in a 360 at the ORP. In the ORP, the ME will orient from 10-2, SE 1 from 6-10, and SE 2 from 2-6, with 12 o'clock being our direction of movement. In the platoon ORP, SE 3 and SE 4 will remain in the center position of the 360. Departing from the ORP, the leader's reconnaissance patrol will conduct the reconnaissance in accordance with the priorities stated in coordinating instructions. Upon the return of the leader's recon, I will pass any refinements in the scheme of maneuver to the squad leaders. O/O the platoon will proceed to the SRP in a platoon column, with the ME followed by SE 3, SE4, SE 1, then SE 2. At the squad release point, the platoon will execute a combination of the Crow's Foot and the Bent "L" to occupy the BP. Once beyond the SRP, the squads will execute individual Bent "L"s from left to right into their positions. The ME will occupy the primary positions first. Once the main effort is in position, SE 1, SE 2, and SE 3 will depart the SRP and will occupy. SE 4 will occupy last behind the ME. Upon occupation, all elements will stand- to. O/O squads will go to 25% security and begin to execute priorities of work. O/O, SE 1 will provide the first patrol and SE 2 will provide the first LP/OP. Once priorities of work begin, the ME’s first priority is construction of their primary positions. O/O, SE 4 will also commence the implementation of the obstacle plan