Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

Ifsm 201 excel project 1 rental cars

06/12/2021 Client: muhammad11 Deadline: 2 Day

Excel Project 1 – MS Excel (Summer 2019)

Use the following project description to complete this activity (all the details are included in this document, in the 22 steps below). For a review of the rubric used in grading this exercise, click on the Assignments tab, then on the title "Excel Project 1." Click on Show Rubrics if the rubric is not already displayed.

Summary

Create a Microsoft Excel workbook with four worksheets that provides extensive use of Excel capabilities including charting, and written analysis and recommendations in support of a business enterprise.

A large rental car company has two metropolitan locations, one at the airport and another centrally located in downtown. It has been operating since 2015 and each location summarizes its car rental revenue quarterly. Both locations rent four classes of cars: economy, premium, hybrid, SUV. Rental revenue is maintained separately for the four classes of rental vehicles.

The data for this case resides in the file summer2019rentalcars.txt and can be downloaded by clicking on the Assignments tab, then on the data file name. It is a text file (with the file type .txt).

Do not create your own data. You must use the data provided and only the data provided.

Default Formatting. All labels, text, and numbers will be Arial 10, There will be $ and comma and decimal point variations for numeric data, but Arial 10 will be the default font and font size.

Tutorials Note: Tutorials that address activities used in this project have been assigned in Week 1, 2 and 3.

Step

Requirement

Comments

1

Open Excel and save a blank workbook with the following name: a. “Student’s LastFirstInitial Name Excel Project 1” Example: SmithJaneP Excel Project 1. b. Set Page Layout Orientation to Landscape.

Use Print Preview to review how the first worksheet would print.

2 Change the name of the worksheet to Analysis by.

3

In the Analysis by worksheet: a. Beginning in Row 1, enter the four labels in column A (one label per row) in the following order: Name:, Class/Section:, Project:, Date Due: b. Place a blank row between each label. Please note the colon : after each label. c. Align the labels to the right side in the cells

It may be necessary to adjust the column width so the four labels are clearly visible within Column A (not extending into Column B).

Format for column A:

• Arial 10 point • Normal font • Right-align all four labels in the cells

Step

Requirement

Comments

4

In the Analysis by worksheet with all entries in column C:

a. Enter the appropriate values for your Name (in cell C1), Class and Section, Project, Date Due across from the appropriate label in column A. b. Use the formatting in the Comments column (to the right).

It may be necessary to adjust the column width so the four labels are clearly visible and are clearly visible within Column C (not extending into Column D).

Format for column C:

• Arial 10 point • Bold • Left-align all four values in the cells

5

a. Create new worksheets: Data, Sorted, and Airport. Upon completion, there should be Analysis by as well as the three newly created worksheets. b. Delete any other worksheets.

Note: The three new worksheets might not have Arial 10 point as the default type so it may be necessary to change the font and point to Arial 10 for the new worksheets.

6

If necessary, reorder the four worksheets so they are in the following order: Analysis by, Data, Sorted, Airport.

7

After clicking on the blank cell A1 (to select it) in the Data worksheet, import the text file summer2019rentalcars.txt into the Data worksheet. The data should begin in Column A, Row 1.

It will be necessary to change Revenue data to Currency format ($ and comma (thousands) separators) with NO decimal points, and to change NumCars data to number format, with NO decimal points, but with the comma (thousands separator). Note: in the Currency format there is NO space between the $ and the first numeric character that follows the $.

Though the intent is to import the text file into the Data worksheet, sometimes when text data is imported into a worksheet, a new worksheet is created. If this happens, delete the blank Data worksheet. Then change the name of the new worksheet with the imported data as “Data”. Make sure worksheets are in the correct order per Item 6.

Format:

all data (field names, data text, and data numbers)

• Arial 10 point.

The field names should be in the top row of the worksheet with the data directly under it in rows. This action may not be necessary as this is part of the Excel table creation process. The data should begin in column A.

Step

Requirement

Comments

8

In the Data worksheet:

a. Create an Excel table with the recently imported data. b. Pick a style with the styles group to format the table (choose a style that shows banded rows, i.e., rows that alternate between 2 colors). c. The style should highlight the field names in the first row. d. Ensure NO blank cells are part of the specified data range. e. Ensure the table has headers. f. Ensure that Header Row and Banded Rows are selected in the Table Style Options Group Box, but do NOT select a Total row.

Some adjustment may be necessary to column widths to ensure all field names and all data are readable (not truncated or obscured).

9

In the Data worksheet:

a. Select the entire table (data and headers) using a mouse. b. Copy the table to the Sorted worksheet. c. The upper left-hand corner of the header/data in Sorted should be in cell A1. d. Adjust columns widths if necessary to ensure all data and field names are readable. e. Make sure that all the format requirements for the Data Worksheet are met in the Sorted Worksheet

10

In the Sorted worksheet:

a. Select all the cells with data in the table (including the header row. b. Sort the data by location (ascending). c. Adjust column widths if necessary to ensure all data and field names are readable with no truncation.

Ensure all the table is selected, NOT just the location column.

Format:

All data (field names, data text, and data numbers)

Arial 10 point.

Step

Requirement

Comments

11

a. Copy the entire table from the Sorted worksheet to the Airport worksheet. In the Airport worksheet, the field names should be in row 1 and the Year column should be in column A. b. Some column adjustments may be necessary so that the field names as well as the data is all legible. c. Make sure that the same format requirements for the Data Worksheet are met in the Airport Worksheet.

Ensure all cells with data are selected.

Format:

All data (field names, data text, and data numbers)

Arial 10 point.

12

In the Airport worksheet: a. Delete all the rows in the table where the data is for a. Downtown. b. b. The field names should remain at the top of the table. c. The remaining data should be for the Airport location.

13

In the Airport worksheet, using a custom sort:

a. Sort all the data first by CarClass (Ascending), b. then by Year (Ascending), c. then by Quarter (Ascending).

Ensure that all cells with data have been selected before sorting. This sort is completed in a single step, not 3 separate steps.

14

In the Airport worksheet: a. Add a new column heading AvgRev for the column where the average revenue per car for each row will be calculated and displayed. This column must be the next column to the right of the NumCars column. b. Add a formula to calculate the AvgRev by dividing the contents of the Revenue cell by the contents of the NumCars cell for each data row in the table c. The AvgRev values format is currency (a $ and two decimal points) with no space between the $ and the first number following it. When you are clicking on cells to construct a formula in cell G2, while you may be expecting to see E2/F2 what may appear in the cell editor is Revenue/@NumCars, a result of using an Excel table. d. Column adjustment may be needed to ensure both the title and the data is visible. e. Apply the formatting instructions in the Comments column (next column at right).

The format of the table must be extended to the new column.

Format: • Arial 10 point • data values for AvgRev are Currency Format (using the Format Cells option). A typical AvgRev value could be $123.45, for instance with no space between the $ and the 1. • Revenue and NumCars format from Data Worksheet.

Step

Requirement

Comments

15

In the Airport worksheet:

a. Create a range named AE that includes every AvgRev value for all Economy cars. b. Create a range named AH that includes every AvgRev value for all Hybrid cars. c. Create a range named AP that includes every AvgRev value for all Premium cars. d. Create a range named AS that includes every AvgRev value for all SUV cars.

Defined Avg Rev Ranges

AE is Airport Economy, AH is Airport Hybrid, AP is Airport Premium, AS is Airport SUV.

16

In the Airport worksheet:

a. In row 1, two or three columns to the right of the AvgRev column: b. Create a label called Average Quarterly Revenue per Economy Car (Airport) in row 1. c. Immediately (same column, next row down) under the Economy label create a label called Average Quarterly Revenue per Hybrid Car (Airport). in row 2. d. Immediately (same column, next row down) under the Hybrid Car label, create a label called Average Quarterly Revenue per Premium Car (Airport) in row 3. e. Immediately (same column, next row down) under the Premium label, create a label called Average Quarterly Revenue per SUV (Airport) in row 4. f. Apply the formatting instructions in the Comments column (next column, at right).

Format:

• Arial 10 point • Bold • Left-justified

17

In the Airport worksheet: In the first fully visible cell to the right of the of the widest of the four labels so that all four values are in the same column aligned with the appropriate row for the specified carclass:

a. Calculate the Average Quarterly Revenue (AvgRev) for the Label-indicated carclass for each of the four carclasses. b. Use the average function and the named range (AE, AH, AP, of AS) ONLY NOT a range of cells. Ensure each of four averages is Currency format with two decimal places preceded by a $ with no spaces between the $ and the first number.

Format:

• Arial 10 point • Normal • Currency ($ and two decimal places).

Truncation (cut off) of any of the four labels is not acceptable.

18

In the Airport worksheet:

In the AvgRev column, use conditional formatting to identify all AvgRev values where the AvgRev is greater than (>) the AvgRev FOR THAT CARCLASS calculated in Item 17 above. DO NOT USE the calculated AvgRev number in the comparison, instead USE the absolute cell reference the AvgRev value so that if either Revenue or NumCars change in a particular row that the conditional formatting is based on the updated value for Average Quarterly Revenue. Four conditional formatting rules using the values calculated for each of the four classes in step 17.

Format:

The highlighted AvgRev cell should be Green Fill with Dark Green Text.

Step

Requirement

Comments

19

In the Airport worksheet: a. Create a column or bar type of chart that clearly shows the average revenue (AvgRev) for Hybrid vehicles for 2015 to 2017 by quarter. b. Provide an internal chart title that explains what is portrayed on the chart. The year and the quarter must be included in the chart for clarity. c. Place the chart one or two rows below the four labels and left-aligned in the same column where the four Average Quarterly Revenue labels begin.

You will have ten bars in your chart, one for each quarter. Each bar represents the average revenue per hybrid car for ten quarters – airport location only.

20

In the Airport Worksheet:

a. Create a column or bar type of chart that clearly shows the average revenue (AvgRev) for Premium (carclass) vehicles for the four 2015 quarters. b. Provide an internal chart title that explains what is portrayed on the chart. The two chart titles should be similar (except for the text difference in carclasses). c. Place the chart two or three rows below the first chart and positioned so that left sides of the two charts are in alignment.

You will have four bars in your chart, one for each quarter. Each bar represents the average revenue per premium car for four quarters – airport location only.

For the questions below, present your answers in a very readable format left-aligned with and one or two rows beneath the lower chart. You can type your answer in one cell, then highlight and select several rows and columns, selecting merge cells and selecting Wrap Text. Do NOT widen the columns as this will adversely impact the appearance of the worksheet the text from Center to Left justification. Play with this a bit. If you simply type your answer on a single line in that will also be ok. But be sure the entire answer can be read without the reader having to change any formatting. Reading the answer in the cell editor is NOT acceptable; the answer must be visible in the worksheet itself.

21

Question 1: Based on the hybrid AvgRev chart above, is there a trend? In addition to the yes or no response, explain (give reasons) for the trend or why there is not a trend to be observed.

Label your response Question 1. Answer this question in 2 to 3 sentences left-aligned with and under the lower chart. DO NOT change your spreadsheet. Just respond to the question.

Format:

• Arial 10 point • Normal/Black • Left-align text in the cell

22

Question 2: If you had to display a chart for the AvgRev (based on the data in this worksheet) for all four carclasses for the ten quarters into one chart, what type of chart of chart would you use and why would you use it?

Label your response Question 2. Answer this question in 2 to 3 sentences in a new row left-aligned with the Question 1 response and one or two rows beneath it.

Format:

• Arial 10 point • Normal/Black • Left-align text in the cell

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

ECFX Market
Academic Master
Homework Master
Coursework Assignment Help
Accounting & Finance Master
Essay & Assignment Help
Writer Writer Name Offer Chat
ECFX Market

ONLINE

ECFX Market

I have written research reports, assignments, thesis, research proposals, and dissertations for different level students and on different subjects.

$46 Chat With Writer
Academic Master

ONLINE

Academic Master

I am an experienced researcher here with master education. After reading your posting, I feel, you need an expert research writer to complete your project.Thank You

$45 Chat With Writer
Homework Master

ONLINE

Homework Master

I am an academic and research writer with having an MBA degree in business and finance. I have written many business reports on several topics and am well aware of all academic referencing styles.

$42 Chat With Writer
Coursework Assignment Help

ONLINE

Coursework Assignment Help

I am a PhD writer with 10 years of experience. I will be delivering high-quality, plagiarism-free work to you in the minimum amount of time. Waiting for your message.

$39 Chat With Writer
Accounting & Finance Master

ONLINE

Accounting & Finance Master

I am an academic and research writer with having an MBA degree in business and finance. I have written many business reports on several topics and am well aware of all academic referencing styles.

$17 Chat With Writer
Essay & Assignment Help

ONLINE

Essay & Assignment Help

I have written research reports, assignments, thesis, research proposals, and dissertations for different level students and on different subjects.

$46 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Motorized awnings for decks - Swagelok heat trace tubing - General appraisal overview for all studies - Conciseness in technical writing - Collective human experiences examples - Three activities around halloween - Jennifer higdon blue cathedral excerpt - Pave the planet or wear shoes - 3 components of total reward system - Speaker Notes - Discussion: Parent Guide Week 3 - The ugly american book sparknotes - Krispy kreme doughnuts inc case study solution - Return and Bonds Ratings - Paper planes urban dictionary - Monroe's motivated sequence outline pdf - Bible dictionary project old testament - How to calculate simple price index - How to become an embalmer in australia - Short Essay #2 - 1984 chapters 5 8 - Preferred ifr routes canada - Electromagnetic actuators fallout 4 - Pin oak soil ph - Discussion on following - A 50 kg toboggan is coasting - Bus 475 week 3 individual assignment - Obsolete jobs of the past - What are successful collisions - Dptr in 8051 microcontroller - Amazon - The luminaries who killed carver - No gumption summary - The crucible character map - David hansen prank patrol - 132 148 124 2000 login mobilemis - How fast do clouds move - Norton equivalent circuit calculator - Leadership that gets results - Restricted electrical worker's licence - Middle road media case study - Altistart 22 usf fault - Shear over comb technique - Starry night poem sparknotes - What's going on with Red Tides? - Chef parisienne oven manual - Research Paper - Given the ipv6 address 6a3e:ba91::877b:ffef/104, how many bits identify the host id? - Is psychology a hard science - The life stages of an individual saver include which of the following: - Skeletal system worksheet answers - Clifton mccree - The talk funny girl - Case 3 - T8 retrofit conversion kit - Health psychology stage 2 training - SOCW 6103 Wk 5 Assignment Requirements - Assignment: Relapse Prevention - Examples of theoretical foundations in nursing - Briefly describe 2 common sanitising methods in a commercial kitchen - Bsz404a train small groups - The electron dot structure for ascl3 - 9 eurabalong road burraneer - He named me malala questions and answers - Navigating the Regulatory Environment in Health Care - Nhp rcbo wiring diagram - How can an organization design an equitable compensation system - Integral maths topic assessment solutions - Agrotop airmix nozzle chart - Recording transactions in a financial transaction worksheet - Western power moving house - Lamb chops woolworths price - Race in the Media - Shell oil in nigeria case study answers - Sage drive management centre - What is rusul in islam - How to measure the speed of light with a microwave - Essay in healht studies - Discussion - Pulse and blood pressure lab answers - Pointe du hoc speech analysis - Square wave fourier series example - APA Paper - Cafe menu reading strategies - Domestic containment - IT resume - 5th grade science questions and answers - Market research simulation answers - What passage of scripture gives insight into the routine activity of the early church? - 250 words/ two scholarly sources due TODAY! - St athanasius west view pa - Applied statistic assignment using rstudio turnitin - How do you pronounce hammurabi - Which of the following statements is true of external recruiting - Life cycle of a tree - Aicpa due care - Financial Analysis - Jb hi fi product warranty - Unit 9 Data Analysis and Application - Warwick ifp science and engineering - Criminal Procedure