Baker Mfg. Inc (see table 11.9) wishes to compare its inventory turnover to those of industry leaders wou have turnover of about 13 times per year and 8% of their assets invested in inventory
Arrow Distributing Corp
NET Rev. $16,500
Cost of sales $13,500
inventory $1,000
Total Assets $8,600
Baker MFG. INC
Net rev $27,500
Cost of sales $21,500
inventory $1,250
total assets $16,600
A) What is Baker's Inventory Turnover?
Inventory turnover ratio = Cost of good sold/ inventory investment
Inventory turnover = $21,500/$1,250 = 17.2
B) What is Baker's percent of assets committed to inventory?
Percent invested in inventory = (total inventory investment/total assets) * 100
Percent invested in inventory = ($1,250/$16,600) * 100 = 7.53 %
C) How does Baker's performance compare to the industry leaders?
8%-7.53% 0.47
Compared to the industry leaders, Baker's performance is very low because they are .47% lower than the industry leaders performance
Good job
S11.4
Johnson Chemicals is considering two options ofr its supplier portfolio. Option 1 uses two local suppliers. Each has a "unique event" risk of 5%, and the probability of a "super event"
that would disable both at the same time is estimated to be 1.5%. Option 2 uses two suppliers located in different countries.
Each has a "unique event" risk of 13% and the probability of a "Super event" that would disable both at the same time is estimated to be .2%.
P(n) = S+(1-S)U^n
A) What is the probability that both suppliers would be disrupted using option 1?
S = 1.50%
U = 5%
P(n) = 0.0175
B) What is the probability that both suppliers would be disrupted using option 2
S= 0.20%
U= 13%
P(n) = 0.0189
C) Which option would provide the lowest risk of total shutdown?
Option 1 has the lowest risk of total shutdown
because it has a lower probability than option 2
correct
S11.9
Consider a three firm supply chain consisting of a retailer, manufacturer, and a supplier. Ther retailer's demand over an 8 week period was 100 units each of the first 2 weeks,
200 units of each of the second week, 300 units of the third 2 weeks and 400 units of the fourth 2 weeks. The following table represents the orders placed by each irm in the supply chain.
Notice, as is often the case in supply chains due to economies of scale, that total units are the same in each case, but firms further up the supply chain (away form the reatailer) place larger, less requent, orderes
Week Retailer Manufacturer supplier
1 100 200 600
2 100 0 0
3 200 400 0
4 200 0 0
5 300 600 1400
6 300 0 0
7 400 800 0
8 400 0 0
Recall that the same sample variance of a data set can be found by using VAR.S function in excel or by plugging each x value of the data set into the formula:
Variance = (x-x)^2/(n-1), where x is the mean of the data set and n is the nubmer of values in the set.
Retailer
Variance = 14286
Manufacturer
Variance = 100000
Supplier
Variance = 260000
A) What is the bullwhip measure for the retailer?
Bullwhip measure = Variance of orders/ Variance of demand
Bullwhip measure for retailer = 14286/14286 1 correct
B) What is the bullwhip measure for manufacturer?
Bullwhip measure for manufacturer = 100,000/14,285 7 correct
C) What is the bullwhip measure for supplier?
Bullwhip measure for supplier = 260,000/100,000 2.6 correct
D) What conclusions can you draw regarding the impact that economies of scale may have on the bullwhip effect?
We can see that the economies of scale seem to contribute to the bullwhip effect. As less frequent, large orders occur, the variance is larger as it moves up the supply chain toward the supplier
S11.15
Monczka-Trent Shipping is the logistics vendor for Handfield Manufacutring Co. in Ohio. Handfield has daily shipments of a power steering pup from its Ohio plant to an auto assembly line in Alabama.
The value of the standard shipment is $250,000. Monczka-Traent has two options: 1: its standard 2 day shipment or 2: a subcontractor who will team drive overnight with an effective delivery of one day.
The extra driver cost $175. Hndfield's holding cost is 35% annually for this kind of inventory.
Standard shipping $250,000
Holding cost 35% $240
extra driver $175
A) Which option is more economical?
Option 2 with the subcontractor is more economical than the standard shipping.
The holding cost is $240 with and extra $175 for the driver rather than $250,000.
B) What production issues are not included in the data presented?
The issue that is not included in the data is that the Alabama's assembly line is receiving its inputs from Ohio.
Changing the delivery pattern might affect the work of the assembly line for example the 1 day shipping can overstock the assembly line.
This can also effect the production process or issues with the parts and cause delays in the production.
correct
12.1
L. Houts Plastics is a large manaufacturer of injection molded plastics in North Carolina. An investigation of the company's Manufacturing facility in Charlotte yields the information presented in the table below.
How would the plant classify these items according to an ABC classification system?
Item Code Average inventory units Value of unit Total value % of total value % of total quality % of valuation/ quantity Classification
2347 300 $4 $1,200 35.59 28.90 1.23 A
1289 400 $3.75 $1,500 44.49 38.54 1.15 A
9111 6 $3.00 $18 0.53 0.58 0.92 B
2349 120 $2.50 $300 8.90 11.56 0.77 B
7844 12 $2.05 $25 0.73 1.16 0.63 B
2395 30 $2.00 $60 1.78 2.89 0.62 B
8310 7 $2.00 $14 0.42 0.67 0.62 B
8210 8 $1.80 $14 0.43 0.77 0.55 C
2394 60 $1.75 $105 3.11 5.78 0.54 C
2363 75 $1.50 $113 3.34 7.23 0.46 C
6782 20 $1.15 $23 0.68 1.93 0.35 C
Total 1038 Total $3,372
Excellent
A Category comprised of 20-30% of total quantity & contributes to 70-80% of $ valuation
B Category comprised of 20-30% of total quantity & contributes to 15-20% of $ valuation
C Category comprised of 45-50% quantity & contributes to 5-8% of $ valuation
12.4
Lindsay Electronics, a small manufacturer of electronic research equipment, has approximately 7,000 items in its inventory and has hired Joan Blasco-Paul
to manage its inventory. Joan has determined that 10% of the items in inventory are A items, 35% are B items, and 55% are C items.
She would like to set up a system in which all A itmes are counted monthy (every 20 working days), all B items are counted quarterly (every 60 working days), and all C items are counted semiannually
(every 120 working days). How many items need to be counted each day?
Inventory 7,000 working days
A 10% 20
B 35% 60
C 55% 120
A items per day = 35
B Items per day = 41
C items per day = 32
Total = 108 Items
correct
12.13
Joe Henry's machine shop uses 2,500 brackets during the course of a year. These bractets are purchased from a supplier
90 miles away. The following information is known about the brackets:
Annual demand 2,500
Holding cost per bracket per yr $1.50
oder cost per order $18.75
lead time 2 days
working days per yr 250
A) What would be the economic order quantity? (EOQ)
EOQ =√2CD/h
EOQ = 250
B) Given the EOQ, what would be the average inventory? What would be the annual inventory holding cost?
AVG Inv = EOQ/2
AVG INV = 125
Annual holding cost = AVG INV * HOLDING COST
Annual holding cost = $187.50
C) Given the EOQ, how many orders would be made each year? What would be the annual order cost?
# of orders = D/working days in a year
# of orders = 10
Annual order cost = (D/EOQ)*C
Annual order cost = $187.50
D) Given the EOQ, what is the total annual cost of managing the inventory?
Annual managing cost = √2CD*h
annual managing cost = $ 375.00
E) What is the time between orders?
Time between orders = 250/number of orders
Time between orders = 25 days
F) What is the reorder point? (ROP)
ROP = LEAD TIME * Daily Demand
ROP = 20
correct
12.18
Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Right supplies Caltex, a larger assembly company, with 10,000 wheel bearings each Wheel-right is $40, and holding cost is $.60 per wheel bearing per year.
Wheel-Rite can produce 500 wheel bearings per day. Caltex is a just-in-time manufacturer and requires that 50 bearings be shipped to it each business day.
Annual Demand 10,000
Setup cost $40
holding cost $0.60
daily production rate 500 per day
daily demand rate 50 per day
Length of production 1 day
days in a year 365
A) What is the optimum production quantity?
Qp = √2DS/H(1-(d/p)
Optimum production quantity = 1217.16 correct
B) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite?
Q = 500
Maximum inventory level = (total production during the production run) - (Total used during the production run) Q(1-(d/p))
Maximum inventory level = 450 1095
C) How many production runs of wheel bearings will Wheel-Rite have in a year?
Production runs = 365 in a year 8.22
D) What is the total setup + holding cost for Wheel-Rite?
Setup = (D/Q) * S
Holding cost = 1/2*H*Q(1-(d/p))
Setup cost = $800
Holding cost = $ 135
Setup cost + holding $935 $657.30

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Accounting Homework Help
Assignment Guru
WRITING LAND
Engineering Exam Guru
Top Quality Assignments
Calculation Master
Writer Writer Name Offer Chat
Accounting Homework Help

ONLINE

Accounting Homework Help

I have read your project details and I can provide you QUALITY WORK within your given timeline and budget.

$47 Chat With Writer
Assignment Guru

ONLINE

Assignment Guru

I reckon that I can perfectly carry this project for you! I am a research writer and have been writing academic papers, business reports, plans, literature review, reports and others for the past 1 decade.

$26 Chat With Writer
WRITING LAND

ONLINE

WRITING LAND

I have written research reports, assignments, thesis, research proposals, and dissertations for different level students and on different subjects.

$18 Chat With Writer
Engineering Exam Guru

ONLINE

Engineering Exam Guru

I have worked on wide variety of research papers including; Analytical research paper, Argumentative research paper, Interpretative research, experimental research etc.

$34 Chat With Writer
Top Quality Assignments

ONLINE

Top Quality Assignments

I am an elite class writer with more than 6 years of experience as an academic writer. I will provide you the 100 percent original and plagiarism-free content.

$36 Chat With Writer
Calculation Master

ONLINE

Calculation Master

As per my knowledge I can assist you in writing a perfect Planning, Marketing Research, Business Pitches, Business Proposals, Business Feasibility Reports and Content within your given deadline and budget.

$29 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

How to find relative change - What country invaded in tomorrow when the war began - Analysis of hydrogen peroxide solution lab answers - Cultural and linguistic diversity in early childhood education - Mandevilla alice dupont plant - Fin 370 week 1 - Chern's case study executive summary - Boy in striped pyjamas chapter summary - Amex hungary case study answers - Khan academy prokaryotes and eukaryotes - D10 - Business management - Courage in shawshank redemption - Dcc concepts ads 8fx - Bay of isles shearing - Wsus updates needing files - Write Analysis of a KM consulting report 3 pages - S. dakota pastor bill guthrie - Commonwealth bank merchant id number - The good samaritan by rene saldana jr questions and answers - Profit sharing agreement template - Energy pathways during exercise - Rock paper scissors lizard spock java program code - William glasser theory of classroom management - Assignment - Reflect - Explain the decision tree modeling for capacity expansion - Dunn's auto sales picayune ms - Analysis of an aluminum zinc alloy answers - 2.04 quiz case study hurricane - Comparative balance sheets for 2018 and 2017 - CASE STUDY - Order # 10247 - Nsw organisational policies and procedures - Raf officer pay scales - Single effect evaporator calculations pdf - Lightweight White Paper for a fictitious Initial Coin Offering (ICO) - Romans 16 25 27 - Brave new world unsw - Medical assessment unit western general edinburgh - BHS380 Module 2 Discussion Post 2 - How to draw a cartoon castle - Operational definition of customer satisfaction - I am david chapter 1 - Pollak 6 port valve wiring diagram - For vincent van gogh the figure of the sower represents - Wave on a string - Dramatic hip hop instrumental rebel america inc - Quiz - Fat boys pizza norton ohio menu - Organizations invest heavily in information systems to improve customer service - Examples of addressing selection criteria - Mkt 571 week 1 individual assignment - Powder by tobias wolff literary devices - Umea university sweden world ranking - Course name: Information Governance - Risk management in Healthcare Setting Week 4 Project - Tipler physics 6th edition pdf - Any work which has been copied or shared between students will result in a Fail grade for all students concerned. - Spoon university apply - Picture of prokaryotic cell with labels - Stage left and right - Dumb shell arts telugu movie names - The watson glaser critical thinking appraisal - Project management simulation scope resources and schedule - Locus of control group exercise - Fermi dirac distribution boltzmann approximation - Http extensiononline tamu edu certificates audit php - Product life cycle theory of international trade ppt - Cooperative travel insurance privilege account - Ecu nurse practitioner program - Penélope muestra sus fotos a mí. - Rise of civilization kusunoki masashige - History paper outline - Ppp implied exchange rate formula - Sub disciplines of exercise science - Case parts emporium - Fs 3 episode 2 - A person who routinely forgets how he began a long sentence may be suffering from ________ amnesia. - The sentinel arthur c clarke analysis - Essay about study skill and time management. - H0 and h1 calculator - 5.97 pounds of aluminum worth - Ideal acronym problem solving - 1101 sequence detector state diagram - Mittelstaedt inc buys 60 percent - Interpreter of maladies discussion questions - How to splice 8 strand rope - Discussion needed Sat by 3pm - How to build a half wave rectifier - Summary illustration mouse party - Ezproxy liberty 2048 login - Fixed and growth mindsets - Difference between sympathetic and parasympathetic nervous system table - Parts of bunsen burner - Discussion 2.1 - Advice on the Best Apps and Software for Increasing Efficiency - Singleton hospital pathology department - Http iase disa mil index2 html - Merger and acquisition notes for mba