Production And Operations Management
Instructor: Humberto Florez Course: SCM4153  Production and Operations Management
Assignment: Module 3
You have just been hired as the director of operations for Reid  Chocolates, a purveyor of exceptionally fine candies.  Reid Chocolates has two kitchen layouts under consideration for its recipe making and testing department. The  strategy is to provide the best kitchen layout possible so that food scientists can devote their time and energy to  product improvement, not wasted effort in the kitchen.  You have been asked to evaluate the two kitchen layouts and  to prepare a recommendation for your boss, Mr.  Reid, so that he can proceed to place the contract for building the  kitchens.
Figure 1. Number of trips between work centers                                                                                        To:
From: Refrigerator Counter Sink Storage Stove
 (1) (2)  (3) (4) (5) Refrigerator − 8 15 0 0 Counter 9 − 3 4 8 Sink 4 13 − 6 0 Storage 4 0 0 − 5 Stove 0 8 5 11 −
The first kitchen layout is shown in Figure 2 below. The walking distance between the areas is in feet. For  example,  the distance from area 1 to area 2 is 5 feet, area 1 to area 5 is 13 feet.
Figure 2. Kitchen Layout #1
a) For layout number one, the cumulative "load  distance" or  "movement  cost"  feet  (enter your  response as a whole number).
× = 697
The second kitchen layout is shown in Figure 3 below. The walking distance between the areas is in feet. For  example, the distance from area 1 to area 2 is 4 feet, area 1 to area 5 is 4 feet.
Figure 3. Kitchen Layout  #2
b) For layout number two, the cumulative "load  distance" or  "movement  cost"  feet  (enter your  response as a whole number).
× = 580
Among the two given layouts, based on the cumulative "load  distance," the better layout is presented in 
(1)  .
×
9/21/2018 Module 3Suyin Padron
https://xlitemprod.pearsoncmg.com/api/v1/print/enus/om 2/2
(1)   neither, since both are the same  Layout 1  Layout 2