Who Knows SAP Project Management Case Study (Please Read Instructions Before Replying)
CASE STUDY
Product
SAP ERP 6.08 Global Bike
Level
Beginner
Focus
Project Management
Authors
Martin Wassmann Bret Wagner Stefan Weidner
Version
3.0
Last Update
July 2016
MOTIVATION
In the Project Management it will be create a simple cost project, which will plan and control the development of an ultra light racing bike. The project will be structures using a work breakdown structure (WBS) and network activities. In the Execution phase we will post actual dates and actual costs on activities and WBS elements.
PREREQUISITES
Before you use this case study, you should be familiar with navigation in the SAP system.
NOTES
This case study uses the Global Bike (GBI) data set, which has exclusively been created for SAP UA global curricula.
Project Management (PS) Case Study
This case study explains the project management process in detail and
thus fosters a thorough understanding of each process step and
underlying SAP functionality.
© SAP SE Page 2
CASE STUDY
Process Overview
Learning Objective Understand and execute an integrated project planning.
Scenario To edit a complete project planning process, you will take different
roles in GBI, e.g. Production Supervisor and Cost Accountant. Overall, you
will be working in the Project Management (PS) and Financial Accounting (FI) departments.
Employees involved Jun Lee ( Production Supervisor)
Jermain Kumins (Shop Floor Worker 1)
Silvia Cassano (Accounts Payable Specialist)
Jamie Shamblin (Cost Accountant)
Time 140 Min.
At the beginning of your project you assign WBS elements, activities and milestones at Project
Builder. Also you assign milestones to your project.
In the last few steps, you create creditor invoice for your business partner, who acts as an
intermediary for the test driver and you have to pay for the entire project.
© SAP SE Page 3
CASE STUDY
Table of Contents
Step 1: Create Project ................................................................................................................ 4
Step 2: Change Project ............................................................................................................... 8
Step 3: Create Relationships.................................................................................................... 10
Step 4: Assign milestones ........................................................................................................ 13
Step 5: Release of Project ........................................................................................................ 15
Step 6: Reporting using cost element report........................................................................... 16
Step 7: Analyze Project Structure ........................................................................................... 18
Step 8: Further scheduling of Project ..................................................................................... 20
Step 9: Post activity confirmations ......................................................................................... 22
Step 10: Create single confirmation ........................................................................................ 24
Step 11: Display actual cost reporting .................................................................................... 25
Step 12: Create creditor invoice .............................................................................................. 27
Step 13: Display costs .............................................................................................................. 28
© SAP SE Page 4
CASE STUDY
Step 1: Create Project
Task Create a new project.
Short Description Use the SAP Easy Access Menu to create a new project.
Name (Position) Jun Lee
Time 15 min
This is the Project structure of cost project P/20##, which consists of WBS
elements, activities, and milestones.
We will use the project builder to create a project “Development of
Ultralight Bike”. The project consists of a work breakdown structure and
network activities.
To create a project, follow the menu path:
Logistics ► Project System ► Project ► Project Builder
Add this transaction as a Favorite, then process this transaction.
Menu path
This will produce the following screen. Confirm the popup Project Builder:
Options using the enter icon.
© SAP SE Page 5
CASE STUDY
In the popup Project Builder: User-specific options enter for Hierarchy
levels 99 and select Preview last project. Leave other fields as they are.
Confirm your entries by using the continue icon.
99
To create the project P/2###, select Create and choose Project.
In the screen Project builder enter in the field Project Def. P/2###.
Remember to replace ### with your three-digit number, e.g. 003 if your number
is 003. For Text (unlabeled) enter Development of Ultralight Bike ### (I) and
select in Project Profile Cost projects (Europe). Confirm your entries by
using the continue icon.
P/2### Development of
Ultralight Bike ###(I)
Cost projects (Europe)
Click on the WBS Element Overview icon to create new WBS elements.
Fill in the following data in the Project Builder screen. Please notice that the
system will deduce the project number from the entry. Special characters
such as double quotes can be configured in the SAP customizing menu.
© SAP SE Page 6
CASE STUDY
WBS element Description PE Acct
" Development of Ultralight Bike
" 1 Engineering
" 2 Prototype
" 3 Testing
" 4 Small series production
" 5 Release to mass production
Confirm your entries by using the continue icon.
Hint Operative indicators such as the above (”PE” and ”Acct”) control,
whether the WBS elements can be used for cost planning and cost account
purposes.
Remark the hierarchy graphic can be used to edit the project as well. Please
note, that the derivation of WBS element structure has determined the
hierarchy from the number of the WBS elements. Naturally this works only
for numbers, which reflect a hierarchical order and are customized by a so
called number mask.
To derive the WBS structure the number of the WBS elements choose in the
pull down menu Project ► Derive structure ► Execute. Go to the tab
Responsibilities to assign responsible cost centers to all WBS elements.
Assign responsible cost centers to all WBS elements. Therefore select the
Tab Responsibilities and enter the following data.
WBS element Resp.cost cntr
P/2### EURD1000
P/2###-1 EURD1000
P/2###-2 EURD1000
P/2###-3 EUQM1000
P/2###-4 EUPR1000
P/2###-5 EUQM1000
Confirm your entries.
Use the hierarchy graphic to display your project structure. Use the
”Hierarchy graphic” icon.
Hint The hierarchy graphic can be used to edit the project as well. Please
note, that the derivation of WBS element structure has determined the
hierarchy from the number of the WBS elements. Naturally this works only
for numbers, which reflect a hierarchical order and are customized by a so
called number mask.
To return to the Project Builder use the Back icon. Save your project with
.
© SAP SE Page 7
CASE STUDY
Return to the Easy Access Menu by using the Back icon.
© SAP SE Page 8
CASE STUDY
Step 2: Change Project
Task Change the project.
Short Description Use the SAP Easy Access Menu to change the project
form the task above.
Name (Position) Jermain Kumins
Time 10 min
The project P/20## will be enhanced by network activities (thereby detailing
the information of the WBS elements). Activities describe the process flow
of the project. You can plan dates, resources and costs through network
activities as well.
To change a project, follow the menu path:
Logistics ► Project System ► Project ► Project Builder
Menu path
Click at . In the Open Project screen enter in Project Definition P/2###
and choose .
P/2###
Use the Overview icon. Choose the Activity Overview icon. Enter
the following data:
Activity Description Normal dura- tion in days
Work in hours Work center
0010 General concept 10 80 DVLP1000
0020 Engineering of carbon frame 5 40 DVLP1000
0030 Engineering of steering fork 2 20 DVLP1000
0040 Purchasing of components 1 5 PROC1000 0050 Production of carbon frame 2 30 ASSY1000
0060 Production of steering fork 1 10 ASSY1000
0070 Prototype assembly 8 60 ASSY1000
0080 Wind channel test 1 8 INSP1000
0090 Stiffness test 1 6 INSP1000
0100 Testing acceleration dynamics 1 5 INSP1000
0110 Testing steering precision 1 8 INSP1000 0120 Small series production 10 100 ASSY1000
0130 Final test (internal) 5 50 INSP1000
0140 Release to mass production 1 3 INSP1000
Confirm your entries by pressing Enter or pressing .
In the Branch to the activity overview of external activities create more
activities. To do so use the Ext Processing tab. In the Activity field enter
0045 and activate the Service Field and enter Outsourcing gear in Description. Confirm your entries by pressing Enter.
0045
Outsourcing gear
© SAP SE Page 9
CASE STUDY
In the Service Specification: Ext. Specs f. Task List Maintain screen enter in
the first line 10, in the field short text Engineering, choose for Quant. 1, for
Unit EA and in Gross price 2000.
In the second line enter 20, for the short text enter Ext. production, choose 1
for Quant., EA for Unit and enter Gross price 3000.
10
Engineering 1
EA 2000
20 Ext. production
1
EA 3000
Confirm your entries with Enter or . Go back to the Project Builder:
Project P/2### screen by pressing once .
On the Prim. Costs Tab enter f or Activity 0135, enter Performance test by
professional drivers in Description, for Amount 10000 and 741000 for
Cost Elem.
0135
Performance test by professional drivers
10000 741000
Confirm your entries, by pressing Enter. Use the Save icon to save your
entries, confirm any messages.
Return to the Easy Access Menu by using the Back icon.
© SAP SE Page 10
CASE STUDY
Step 3: Create Relationships
Task Create the relationship structure.
Short Description Use the SAP Easy Access Menu to create the relationship
structure.
Name (Position) Jermain Kumins
Time 15 min
So far the activities are all assigned to the top WBS element. In addition
there are no relationships between activities, i.e. activities so far begin all to
the same time. This will be changed now.
To create the relationships, follow the menu path:
Logistics ► Project System ► Project ► Project Builder
Menu path
Click at . In the Open Project screen enter in Project Definition P/2###
and choose .
P/2###
In the structure tree in the left side, double click on Development of
Ultralight Bike . Press the Activity
Overview Icon.
Enter the following values:
Activity WBS Element
0010 P/2###
0020 P/2###-1
0030 P/2###-1
0040 P/2###-2
0050 P/2###-2
0060 P/2###-2
0070 P/2###-2
0080 P/2###-3
0090 P/2###-3
0100 P/2###-3
0110 P/2###-3
0120 P/2###-4
0130 P/2###-5
0140 P/2###-5
Confirm your entries with
© SAP SE Page 11
CASE STUDY
Hint In the following we create the relationship structure as shown in the
screen below. You can do this in the network graphic. In practice network
graphic is not a good way to edit networks with more than about 10
activities, as you lose the overview.
Furthermore network graphic is possible only for SAPGUI (for Windows).
For this reason we edit relationships in a tabular way (which is the
productive way for large networks).
The Graphic shows the network for development of ultra light racing bike.
The following example will show to enter the relationships between
activities 10, 20 and 50. Please use the same procedure to create all
relationships of the image above.
As you can see in the image above as well as in the snippet below, activity
number 20 is the successor of activity number 10. In addition activity
number 50 is the successor of number 20. Please keep in mind that only
direct relationships between two activities will be created. For example, no
relationship between activity 10 and 50 will be entered.
Click on your activity 10 in the structure tree on the left side
. Use the Relationship
Overview button.
Since we only care about the activities 10, 20 and 50 we will only enter 20
and mark it as successor by selecting the Scs flag. However, please keep in
mind that you are supposed to create the relationships to 30, 40 and 45 in the
same way later on.
© SAP SE Page 12
CASE STUDY
Confirm your entries by pressing enter.
Please open the relationship overview for activity 20 as you did for activity
10. In this screen you can see that activity 10 was automatically added as a
predecessor (flag Scs isn’t selected).
Please enter activity 50 as successor of activity 20 and confirm your entries
by pressing enter.
You may open the relationship overview of activity 50 to verify that activity
20 was added as predecessor.
Now populate each activity with its successors (like stated on the network
plan above) in the same manner. Please make sure to select Scs for each
direct successor of the actual activity.
Check the result of your work in the network graphic. For this click on .
Use the Save icon to save your entries. Return to the Easy Access Menu
by using the Back icon.
© SAP SE Page 13
CASE STUDY
Step 4: Assign milestones
Task Assign milestones to activities.
Short Description Use the SAP Easy Access Menu to assign milestones to
activities.
Name (Position) Jermain Kumins
Time 10 min
In the following we assign texts (e.g. a functional specification) to the
project. We assign milestones to activities, in order to indicate important
project stages.
To create the relationships, follow the menu path:
Logistics ► Project System ► Project ► Project Builder
Menu path
Click at . In the Open Project screen enter in Project Definition P/2###
and choose .
P/2###
Open your project again by double click on P/2### Place your cursor on the
top WBS element (yellow triangle) P/2### in the project structure. Use the
“PS Text Overview” icon. Choose for ST 01, for Description enter PH-
###-1 and for TT choose EN.
01 PH-###
1 EN
Confirm your entries with Enter or . Edit any text you wish and click on
Enter. Use the Back icon to return to the project builder main view.
Hint Important project stages can be indicated and described by project
milestones. Milestones are assigned either to WBS elements or to activities
of the project and fulfill information and documentation purposes, but can
trigger business processes such as progress reporting or milestone billing in
the case of sales projects. In the following we create three milestones,
assigned to activities 0070, 0120, and 0140.
To assign a milestone to activity 0070 place your cursor on
activity 0070 at the
structure tee on the left side. Use the .Milestone Overview icon. For
Usage please enter 00004 and by Description enter Completion: prototype.
Confirm your entries with .
00004
Completion: prototype
© SAP SE Page 14
CASE STUDY
Go to the milestone detail data. For this click on Completion: prototype.
Complete the milestone data there. In the field Usage enter 00004.In Trend
analysis, Progress analysis and Offset to fin enter X. Leave other fields as
they are and confirm your entries with Enter.
00004 X
Now assign two other milestones to activities 0120 and 0140 analogously.
Make sure not to assign these milestones to the same activity 0070 or, worse,
to change the milestone which you just created. Finally you should be able to
display three milestones in the structure tree on the left side.
To do so, use the following data:
For the activities 0120 enter for Usage 00005 and in Description enter
Completion: small series. For Trend analysis, Progress analysis and
Offset to fin. enter X.
00005 Completion: small series
X
For the activities 0140 enter for Usage 00006 and in Description enter
Completion: release. For Trend analysis, Progress analysis and Offset to
fin. enter X.
00006 Completion: release
X
Use the Save icon to save your entries. Confirm the Information Pop-up
and return to the Easy Access Menu by using the Back icon.
© SAP SE Page 15
CASE STUDY
Step 5: Release of Project
Task Release of the Project.
Short Description Use the SAP Easy Access Menu to release the project.
Name (Position) Jun Lee
Time 5 min
The project will be released. The release of the WBS elements and / or
activities of the project are a precondition for the posting of actuals, in the
execution phase of the project. In productive environments and for large
projects, only those elements will be released which are to be executed in the
near future. The release of higher-level WBS elements will also release
subordinate WBS elements and / or assigned activities. In the exercises we
release the project definition, thereby releasing all WBS elements and
activities of the project.
To release the project, follow the menu path:
Logistics ► Project System ► Project ► Project Builder
Menu path
Click at . In the Open Project screen enter in Project Definition P/2###
and choose . Choose Menu Edit ►Status ► Release to release your
project.
P/2###
Use the Save icon to save your entries.
Confirm the Information Pop-up and return to the Easy Access Menu by
using the Back icon.
© SAP SE Page 16
CASE STUDY
Step 6: Reporting using cost element report
Task Reporting using cost element report.
Short Description Use the SAP Easy Access Menu to report by using cost
element report.
Name (Position) Silvia Cassano
Time 10 min
By structuring the project using network activities, you have built a quantity
structure with internal and external services, which can be calculated and
will lead to planned costs. When releasing the activities, they are
automatically calculated. From now on, planned costs can be evaluated
specific to controlling periods (normally months) and specific to calculate
elements. The evaluation can be done on a specific activity, but also
aggregated to WBS elements and the whole project.
To report, follow the menu path:
Logistics ► Project System ► Information System ► Financials ►
Costs ► Plan-Based ► By Cost Element ►
Actual/Commitment/Total/Plan in CO Area Currency
Menu path
Add also this transaction to your favorites menu and go into the transaction
afterwards.
If required, enter in database GL01000 and confirm.
GL01000
Enter in the selection screen for Project P/2###, in the Controlling Area
choose EU00, for Plan Version 0. Enter the current year for From fiscal
year and in To fiscal year enter the next year. By From period enter 1 and in
to period enter 12. Please delete all other field entries.
P/2###
EU00 0
current year
next year 1
12
The project will usually last until the next year (corresponding to the
network activity durations and their relationships). Since a part of planned
costs will be assigned to the next year, you would only show a part of the
costs when selecting only the current year. Use the Execute icon.
Where do the planned costs result from, which are displayed in the report?
_____________________________________________________
What is the reason for the ”commitments” value?
_____________________________________________________
© SAP SE Page 17
CASE STUDY
Hint For the network activities you specified work centers and the amount of
work (in units of hours). As for the primary cost activities you entered the
costs directly. These costs are determined by network costing and will be
displayed as aggregated costs for WBS elements and for the project
definition. The servicing activity resulted in a purchase requisition for the
purchasing department, which is displayed as commitment (value type,
which displays a future obligation)
Follow the path: Settings ► Options. Then, select the “Expert Mode”
indicator (X). Use the continue icon.
Return to the Easy Access Menu by using the Back icon. Confirm that
you want to exit the report and leave the transaction with clicking the
Back icon without saving.
© SAP SE Page 18
CASE STUDY
Step 7: Analyze Project Structure
Task Analyze the project structure.
Short Description Use the SAP Easy Access Menu to analyze the project
structure.
Name (Position) Jermain Kumins
Time 5 min
Using the structure information system you can analyze the project structure
as well as dates, costs and revenues (plan and actuals) of one or many
projects. The structure information system does not only display data, but
you can edit the project from there or post activity confirmations.
To analyze the project structure, follow the menu path:
Logistics ► Project System ► Information System ► Structures ►
Structure Overview
Menu path
If required, enter in the PS Info Profile filed GL01000 and confirm with
Enter.
GL01000
In the selection screen enter for Project P/2### and leave the other fields as
they are. Use the Execute icon for the report.
P/2###
© SAP SE Page 19
CASE STUDY
Please notice that you can analyze the project structure as well as dates and
costs (plan, actual) using this report. You can always refresh the report , in
order to show changed data.
Please write down the network number which is the one in front of your
activity numbers.
________________
Leave this transaction using the Back icon without saving the report and
click on .
© SAP SE Page 20
CASE STUDY
Step 8: Further scheduling of Project
Task Further scheduling of the Project.
Short Description Use the SAP Easy Access Menu for further scheduling of
the project.
Name (Position) Jun Lee
Time 10 min
In the following we use the project planning board to plan the project P/20##
further. The project planning board is an interactive Gantt chart, which is
particularly useful for the planning of dates and resources. In our project,
dates have been already planned by the scheduling of network activities.
Network scheduling works in principle using the durations of the activities
and their relationships. The scheduled dates of the activities are aggregated
to the WBS elements (to which the activities are directly assigned). They can
be further aggregated within the work breakdown structure (i.e. to the higher
level / top level WBS elements).
To change your project using the project planning board, follow the menu
path:
Logistics ► Project System ► Project ► Project Planning Board ►
Change Project
Menu path
Enter for Project def. P/2###, choose for Plan. board GBI-PS: Bikes and for
w. activities X.
. P/2###
GBI-PS: Bikes
X
Open your project with the button.
You can use Drag and Drop to move the separation between tabulator and
graphical area to the right. Use the Adapt graphic area icon.
Note If the columns ID and Description are not shown please press Field
selection .
In the new screen select Identification and Description on the right table
and press to move them to the selected fields on the left hand site.
Afterwards confirm your selection by clicking . Back in the Project:
Change screen scroll to the right hand site to see the columns.
To decrease the planned costs and make the duration of the activity flexible
double click on activity 0135.
© SAP SE Page 21
CASE STUDY
Change the Amount in 8000 and for Flexible X. Leave the other fields as
they are. Use the Back icon. The changed costs will be displayed in the
planning board after performing network costing.
8000
X
Use the select all icon. Use the schedule icon. Use the calculate
icon. Confirm the Pop-up with Yes.
Hint Because of the indicator ”flexible” the duration of activity 0135 has
been fit to the duration of activity 0130, since both activities are ”parallel”
and activity 0130 has a longer duration. The planned costs of activity 0135
have decreased to 8 000 and are equally distributed over the (flexible)
duration of the activity.
Double click at activity 0010. Change the normal duration into 15 days. On
the Dates tab.
15
Hint In the lower section of the detail screen you see the earliest and latest
dates (start, finish) of the activity, which are the result of network
scheduling. The upper section of the detail screen can be used to edit
restrictions, in order to fix activities in schedule.
Return to the overview of the planning board. Use the Back icon.
Although the system adjusts the length of the time bar of activity 0010 in the
Gantt chart, the dates of the whole project are no longer up to date: the
longer duration of activity 0010 will affect the dates of its successors.
Therefore the project will be scheduled again, to determine the dates of
activities and WBS elements new. Schedule the project again.
To do so, use the select all icon, than use the schedule icon. Follow
the menu path: Edit ► Reconcile dates ► Extrapolate dates
If required select “Basic dates”.
Use the Save icon to save your entries. Confirm the Information Pop-up
and return to the Easy Access Menu by using the Back icon.
© SAP SE Page 22
CASE STUDY
Step 9: Post activity confirmations
Task Post activity confirmations for your project.
Short Description Use the SAP Easy Access Menu to post activity
confirmations for your project
Name (Position) Jamie Shamblin
Time 10 min
In the execution phase we post actuals (actual dates, actual costs, material
movements, capacity discharges) to the project. A prerequisite for the
posting of actuals is always the release of the concerning project object. We
have already released the entire project.
To post activity confirmations, follow the menu path:
Logistics ► Project System ► Project ► Project Planning Board ►
Change project
Menu path
This will produce the following screen:
If you receive an Pop-up please confirm the upcoming message with
.
Enter for Project def. P/2###, choose for Plan. board GBI-PS: Bikes and for
w. activities X. Open your project with the button.
P/2### GBI-PS: Bikes
X
Select activity 0010 on the left side. Use the Confirm activity icon.
© SAP SE Page 23
CASE STUDY
In the detail screen of the confirmation, use for the filed Actual: Start
today’s date, for Actual: Finish today’s date plus 3 weeks and enter for
Actual: Work 95. Leave the other field as they are.
today’s date today’s date plus 3
weeks 95
Use the Back icon to return to the overview of the project planning board.
Confirm any warning message. Use the select all icon. Use the
schedule icon.
Use the Save icon to save your entries and return to the Easy Access
Menu by using the Back icon.
© SAP SE Page 24
CASE STUDY
Step 10: Create single confirmation
Task Create a single confirmation.
Short Description Use the SAP Easy Access Menu to create a single
confirmation.
Name (Position) Jermain Kumins
Time 5 min
Follow the menu path:
Logistics ► Project System ► Information System ► Structures ►
Structure Overview
If required, enter in the PS Info Profile filed GL01000 and confirm with
Enter. In the selection screen enter for Project P/2### and leave the other
fields as they are.
Menu path
GL01000
P/2###
Use the Execute icon for the report. Use the deselect all icon. Select
activity 0020 on the left side.
To create a single confirmation for activity 0020 follow the path.
Menu Extras/environment ► Confirm ► Individual confirmation
In the detail screen of the confirmation, please enter for Actual: Start as
scheduled earliest start, for Actual: Finish as scheduled earliest finish and
for Actual: Work enter 42 instead of 40.
as scheduled earliest
start as scheduled earliest finish
42
Save your confirmation with the icon and return to the structure
information system. Refresh your data there . Leave the transaction
without saving.
© SAP SE Page 25
CASE STUDY
Step 11: Display actual cost reporting
Task Display the actual cost reporting.
Short Description Use the SAP Easy Access Menu to display the actual cost
reporting.
Name (Position) Silvia Cassano
Time 5 min
The actual costs will be analyzed using the cost element report.
To report, follow the menu path:
Logistics ► Project System ► Information System ► Financials ►
Costs ► Plan-Based ► By Cost Element ►
Actual/Commitment/Total/Plan in CO Area Currency
Menu path
If required, enter in database GL01000 and confirm.
GL01000
Enter in the selection screen for Project P/2###, in the Controlling Area
choose EU00, for Plan Version 0. Enter the current year for From fiscal
year and in To fiscal year enter the next year. By From period enter 1 and in
to period enter 12. Please delete all other field entries. Ex