Solving goal programming using excel solver

18/11/2021 Client: muhammad11 Deadline: 2 Day

Integer Programming, Goal Programming, and Nonlinear Programming

10

To accompany Quantitative Analysis for Management, Twelfth Edition,

by Render, Stair, Hanna and Hale

Power Point slides created by Jeff Heyl

Copyright ©2015 Pearson Education, Inc.

After completing this chapter, students will be able to:

LEARNING OBJECTIVES

Copyright ©2015 Pearson Education, Inc.

10 – 2

Understand the difference between LP and integer programming.

Understand and solve the three types of integer programming problems.

Formulate and solve goal programming problems using Excel and QM for Windows.

Formulate nonlinear programming problems and solve using Excel.

10.1 Introduction

10.2 Integer Programming

10.3 Modeling with 0-1 (Binary) Variables

10.4 Goal Programming

10.5 Nonlinear Programming

CHAPTER OUTLINE

Copyright ©2015 Pearson Education, Inc.

10 – 3

Introduction

There are other mathematical programming models that can be used when the assumptions of LP are not met

A large number of business problems require variables have integer values

Many business problems have multiple objectives

Goal programming permits multiple objectives

Nonlinear programming allows objectives and constraints to be nonlinear

Copyright ©2015 Pearson Education, Inc.

10 – 4

Integer Programming

An integer programming model is one where one or more of the decision variables has to take on an integer value in the final solution

Three types of integer programming problems

Pure integer programming – all variables have integer values

Mixed-integer programming – some but not all of the variables will have integer values

Zero-one integer programming – special cases in which all the decision variables must have integer solution values of 0 or 1

Copyright ©2015 Pearson Education, Inc.

10 – 5

An integer programming model is one where one or more of the decision variables has to take on an integer value in the final solution

Three types of integer programming problems

Pure integer programming – all variables have integer values

Mixed-integer programming – some but not all of the variables will have integer values

Zero-one integer programming – special cases in which all the decision variables must have integer solution values of 0 or 1

Integer Programming

Copyright ©2015 Pearson Education, Inc.

10 – 6

Solving an integer programming problem is much more difficult than solving an LP problem

Solution time required may be excessive

Harrison Electric Company Example of Integer Programming

Company produces two products, old-fashioned chandeliers and ceiling fans

Both require a two-step production process involving wiring and assembly

It takes about 2 hours to wire each chandelier and 3 hours to wire a ceiling fan

Final assembly of the chandeliers and fans requires 6 and 5 hours, respectively

Only 12 hours of wiring time and 30 hours of assembly time are available

Each chandelier produced nets the firm $7 and each fan $6

Copyright ©2015 Pearson Education, Inc.

10 – 7

Harrison Electric Company Example of Integer Programming

Production mix LP formulation

Copyright ©2015 Pearson Education, Inc.

10 – 8

Maximize profit = $7X1 + $6X2

subject to 2X1 + 3X2 ≤ 12 (wiring hours)

6X1 + 5X2 ≤ 30 (assembly hours)

X1, X2 ≥ 0

where

X1 = number of chandeliers produced

X2 = number of ceiling fans produced

Harrison Electric Company Example of Integer Programming

Copyright ©2015 Pearson Education, Inc.

10 – 9

6 –

5 –

4 –

3 –

2 –

1 –

| | | | | |

0 1 2 3 4 5 6

X1

X2

+

+

+

+

+

+

+

+

+ = Possible Integer Solution

6X1 + 5X2 ≤ 30

Optimal LP Solution

(X1= 3.75, X2 = 1.5, Profit = $35.25

2X1 + 3X2 ≤ 12

FIGURE 10.1 – Harrison Electric Problem

Harrison Electric Company Example of Integer Programming

Production planner recognizes this is an integer problem

First attempt at solving it is to round the values to X1 = 4 and X2 = 2

However, this is not feasible

Rounding X2 down to 1 gives a feasible solution, but it may not be optimal

This could be solved using the enumeration method

Generally not possible for large problems

Copyright ©2015 Pearson Education, Inc.

10 – 10

Harrison Electric Company Example of Integer Programming

Copyright ©2015 Pearson Education, Inc.

10 – 11

CHANDELIERS (X1) CEILING FANS (X2) PROFIT ($7X1 + $6X2)
0 0 $0
1 0 7
2 0 14
3 0 21
4 0 28
5 0 35
0 1 6
1 1 13
2 1 20
3 1 27
4 1 34
0 2 12
1 2 19
2 2 26
3 2 33
0 3 18
1 3 25
0 4 24
Optimal solution to integer programming problem

Solution if rounding is used

TABLE 10.1 – Integer Solutions to the Harrison Electric Company Problem

Harrison Electric Company Example of Integer Programming

Copyright ©2015 Pearson Education, Inc.

10 – 12

CHANDELIERS (X1) CEILING FANS (X2) PROFIT ($7X1 + $6X2)
0 0 $0
1 0 7
2 0 14
3 0 21
4 0 28
5 0 35
0 1 6
1 1 13
2 1 20
3 1 27
4 1 34
0 2 12
1 2 19
2 2 26
3 2 33
0 3 18
1 3 25
0 4 24
Optimal solution to integer programming problem

Solution if rounding is used

TABLE 10.1 – Integer Solutions to the Harrison Electric Company Problem

The optimal integer solution is less than the optimal LP solution of $35.25

An integer solution can never be better than the LP solution and is usually a lesser value

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 13

PROGRAM 10.1A – QM for Windows Input Screen for Harrison Electric Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 14

PROGRAM 10.1B – QM for Windows Solution Screen for Harrison Electric Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 15

PROGRAM 10.2 – Excel 2013 Solver Solution for Harrison Electric Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 16

PROGRAM 10.2 – Excel 2013 Solver Solution for Harrison Electric Problem

Solver Parameter Inputs and Selections Key Formulas
Set Objective: D5 By Changing cells: B4:C4 To: Max Subject to the Constraints: D8:D9 >= F8:F9 B4:C4 = integer Solving Method: Simplex LP R Make Variables Non-Negative Copy D5 to D8:D9
Mixed-Integer Programming Problem Example

Many situations in which only some of the variables are restricted to integers

Bagwell Chemical Company produces two industrial chemicals

Xyline must be produced in 50-pound bags

Hexall is sold by the pound and can be produced in any quantity

Both xyline and hexall are composed of three ingredients – A, B, and C

Bagwell sells xyline for $85 a bag and hexall for $1.50 per pound

Copyright ©2015 Pearson Education, Inc.

10 – 17

Mixed-Integer Programming Problem Example

Copyright ©2015 Pearson Education, Inc.

10 – 18

AMOUNT PER 50-POUND BAG OF XYLINE (LB) AMOUNT PER POUND OF HEXALL (LB) AMOUNT OF INGREDIENTS AVAILABLE
30 0.5 2,000 lb–ingredient A
18 0.4 800 lb–ingredient B
2 0.1 200 lb–ingredient C
Objective is to maximize profit

Mixed-Integer Programming Problem Example

Let X = number of 50-pound bags of xyline

Let Y = number of pounds of hexall

A mixed-integer programming problem as Y is not required to be an integer

Copyright ©2015 Pearson Education, Inc.

10 – 19

Maximize profit = $85X + $1.50Y
subject to 30X + 0.5Y ≤ 2,000
18X + 0.4Y ≤ 800
2X + 0.1Y ≤ 200
X, Y ≥ 0 and X integer
Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 20

PROGRAM 10.3 – QM for Windows Solution for Bagwell Chemical Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 21

PROGRAM 10.4 – Excel 2013 Solver Solution for Bagwell Chemical Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 22

Solver Parameter Inputs and Selections Key Formulas
Set Objective: D5 By Changing cells: B4:C4 To: Max Subject to the Constraints: D8:D10 <= F8:F10 B4 = integer Solving Method: Simplex LP R Make Variables Non-Negative Copy D5 to D8:D10
PROGRAM 10.4 – Excel 2013 Solver Solution for Bagwell Chemical Problem

Modeling With 0-1 (Binary) Variables

Demonstrate how 0-1 variables can be used to model several diverse situations

Typically a 0-1 variable is assigned a value of 0 if a certain condition is not met and a 1 if the condition is met

This is also called a binary variable

Copyright ©2015 Pearson Education, Inc.

10 – 23

Capital Budgeting Example

Common capital budgeting problem – select from a set of possible projects when budget limitations make it impossible to select them all

A 0-1 variable is defined for each project

Quemo Chemical Company is considering three possible improvement projects for its plant

A new catalytic converter

A new software program for controlling operations

Expanding the storage warehouse

It cannot do them all

Copyright ©2015 Pearson Education, Inc.

10 – 24

Capital Budgeting Example

Objective is to maximize net present value of projects undertaken

subject to Total funds used in year 1 ≤ $20,000

Total funds used in year 2 ≤ $16,000

Copyright ©2015 Pearson Education, Inc.

10 – 25

PROJECT NET PRESENT VALUE YEAR 1 YEAR 2
Catalytic Converter $25,000 $8,000 $7,000
Software $18,000 $6,000 $4,000
Warehouse expansion $32,000 $12,000 $8,000
Available funds $20,000 $16,000
TABLE 10.2 – Quemo Chemical Company Information

Capital Budgeting Example

Decision variables

Copyright ©2015 Pearson Education, Inc.

10 – 26

X1 =

1 if catalytic converter project is funded

0 otherwise

X2 =

1 if software project is funded

0 otherwise

X3 =

1 if warehouse expansion project is funded

0 otherwise

Formulation
Maximize NPV = 25,000X1 + 18,000X2 + 32,000X3
subject to 8,000X1 + 6,000X2 + 12,000X3 ≤ 20,000
7,000X1 + 4,000X2 + 8,000X3 ≤ 16,000
X1, X2, X3 = 0 or 1
Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 27

PROGRAM 10.5 – Excel 2013 Solver Solution for Quemo Chemical Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 28

PROGRAM 10.5 – Excel 2013 Solver Solution for Quemo Chemical Problem

Optimal Solution

X1 = 1, X2 = 0, X3 = 1

Fund the catalytic converter and warehouse projects but not the software project

NPV = $57,000

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 29

Solver Parameter Inputs and Selections Key Formulas
Set Objective: E5 By Changing cells: B4:D4 To: Max Subject to the Constraints: E8:E9 <= G8:G9 B4:D4 = binary Solving Method: Simplex LP R Make Variables Non-Negative Copy E5 to E8:E9
PROGRAM 10.5 – Excel 2013 Solver Solution for Quemo Chemical Problem

Limiting the Number of Alternatives Selected

One common use of 0-1 variables involves limiting the number of projects or items that are selected from a group

Suppose Quemo Chemical is required to select no more than two of the three projects regardless of the funds available

This would require adding a constraint

X1 + X2 + X3 ≤ 2

If they had to fund exactly two projects the constraint would be

X1 + X2 + X3 = 2

Copyright ©2015 Pearson Education, Inc.

10 – 30

Dependent Selections

At times the selection of one project depends on the selection of another project

Suppose Quemo’s catalytic converter could only be purchased if the software was purchased

The following constraint would force this to occur

X1 ≤ X2 or X1 – X2 ≤ 0

If we wished for the catalytic converter and software projects to either both be selected or both not be selected, the constraint would be

X1 = X2 or X1 – X2 = 0

Copyright ©2015 Pearson Education, Inc.

10 – 31

Fixed-Charge Problem Example

Often businesses are faced with decisions involving a fixed charge that will affect the cost of future operations

Sitka Manufacturing is planning to build at least one new plant and three cities are being considered

Baytown, Texas

Lake Charles, Louisiana

Mobile, Alabama

Copyright ©2015 Pearson Education, Inc.

10 – 32

Fixed-Charge Problem Example

Constraints

Total production capacity at least 38,000 units each year

Number of units produced at the Baytown plant is 0 if the plant is not built and no more than 21,000 if the plant is built

Number of units produced at the Lake Charles plant is 0 if the plant is not built and no more than 20,000 if the plant is built

Number of units produced at the Mobile plant is 0 if the plant is not built and no more than 19,000 if the plant is built

Copyright ©2015 Pearson Education, Inc.

10 – 33

Fixed-Charge Problem Example

Copyright ©2015 Pearson Education, Inc.

10 – 34

SITE ANNUAL FIXED COST VARIABLE COST PER UNIT ANNUAL CAPACITY
Baytown, TX $340,000 $32 21,000
Lake Charles, LA $270,000 $33 20,000
Mobile, AL $290,000 $30 19,000
TABLE 10.3 – Fixed and Variable Costs for Sitka Manufacturing

Fixed-Charge Problem Example

Decision variables

Copyright ©2015 Pearson Education, Inc.

10 – 35

X1 =

1 if factory is built in Baytown

0 otherwise

X2 =

1 factory is built in Lake Charles

0 otherwise

X3 =

1 if factory is built in Mobile

0 otherwise

X4 = number of units produced at Baytown plant

X5 = number of units produced at Lake Charles plant

X6 = number of units produced at Mobile plant

Fixed-Charge Problem Example

Formulation

Copyright ©2015 Pearson Education, Inc.

10 – 36

Minimize cost = 340,000X1 + 270,000X2 + 290,000X3

+ 32X4 + 33X5 + 30X6

subject to X4 + X5 + X6 ≥ 38,000

X4 ≤ 21,000X1

X5 ≤ 20,000X2

X6 ≤ 19,000X3

X1, X2, X3 = 0 or 1

X4, X5, X6 ≥ 0 and integer

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 37

PROGRAM 10.6 – Excel 2013 Solver Solution for Sitka Manufacturing Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 38

PROGRAM 10.6 – Excel 2013 Solver Solution for Sitka Manufacturing Problem

Optimal solution

X1 = 0, X2 = 1, X3 = 1, X4 = 0, X5 = 19,000, X6 = 19,000

Objective function value = $1,757,000

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 39

Solver Parameter Inputs and Selections Key Formulas
Set Objective: H5 By Changing cells: B4:G4 To: Min Subject to the Constraints: H8 >= J8 H9:H11 <= J9:J11 B4:D4 = binary E4:G4 = integer Solving Method: Simplex LP R Make Variables Non-Negative Copy H5 to H8:H11
PROGRAM 10.6 – Excel 2013 Solver Solution for Sitka Manufacturing Problem

Financial Investment Example

Simkin, Simkin, and Steinberg specialize in recommending oil stock portfolios

One client has the following specifications

At least two Texas firms must be in the portfolio

No more than one investment can be made in a foreign oil company

One of the two California oil stocks must be purchased

The client has $3 million to invest and wants to buy large blocks of shares

Copyright ©2015 Pearson Education, Inc.

10 – 40

Financial Investment Example

Copyright ©2015 Pearson Education, Inc.

10 – 41

STOCK COMPANY NAME EXPECTED ANNUAL RETURN ($1,000s) COST FOR BLOCK OF SHARES ($1,000s)
1 Trans-Texas Oil 50 480
2 British Petroleum 80 540
3 Dutch Shell 90 680
4 Houston Drilling 120 1,000
5 Texas Petroleum 110 700
6 San Diego Oil 40 510
7 California Petro 75 900
TABLE 10.4 – Oil Investment Opportunities

Financial Investment Example

Formulation

Maximize return = 50X1 + 80X2 + 90X3 + 120X4 + 110X5 + 40X6 + 75X7

subject to

X1 + X4 + X5 ≥ 2 (Texas constraint)

X2 + X3 ≤ 1 (foreign oil constraint)

X6 + X7 = 1 (California constraint)

480X1 + 540X2 + 680X3 + 1,000X4 + 700X5 + 510X6 + 900X7 ≤ 3,000 ($3 million limit)

Xi = 0 or 1 for all i

Copyright ©2015 Pearson Education, Inc.

10 – 42

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 43

PROGRAM 10.7 – Excel 2013 Solver Solution for Financial Investment Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 44

Solver Parameter Inputs and Selections Key Formulas
Set Objective: I5 By Changing cells: B4:H4 To: Max Subject to the Constraints: I7 >= K7 I8 <= K8 I9 = K9 I10 <= K10 B4:H4 = binary Solving Method: Simplex LP R Make Variables Non-Negative Copy I5 to I7:I10
PROGRAM 10.7 – Excel 2013 Solver Solution for Financial Investment Problem

Goal Programming

Firms often have more than one goal

In linear and integer programming methods the objective function is measured in one dimension only

It is not possible for LP to have multiple goals unless they are all measured in the same units

Highly unusual situation

Goal programming developed to supplement LP

Copyright ©2015 Pearson Education, Inc.

10 – 45

Goal Programming

Typically goals set by management can be achieved only at the expense of other goals

Establish a hierarchy of importance so that higher-priority goals are satisfied before lower-priority goals

Not always possible to satisfy every goal

Goal programming attempts to reach a satisfactory level of multiple objectives

May not optimize but have to satisfice

Copyright ©2015 Pearson Education, Inc.

10 – 46

Goal Programming

Main difference is in the objective function

Goal programming tries to minimize the deviations between goals and what can be achieved given the constraints

Objective is to minimize deviational variables

Copyright ©2015 Pearson Education, Inc.

10 – 47

Harrison Electric Company Revisited

Production mix LP formulation

Copyright ©2015 Pearson Education, Inc.

10 – 48

Maximize profit = $7X1 + $6X2

subject to 2X1 + 3X2 ≤ 12 (wiring hours)

6X1 + 5X2 ≤ 30 (assembly hours)

X1, X2 ≥ 0

where

X1 = number of chandeliers produced

X2 = number of ceiling fans produced

Harrison Electric Company Revisited

Moving to a new location and maximizing profit is not a realistic objective

A profit level of $30 would be satisfactory during this period

The goal programming problem is to find the production mix that achieves this goal as closely as possible given the production time constraints

Define two deviational variables

d1– = underachievement of the profit target

d1+ = overachievement of the profit target

Copyright ©2015 Pearson Education, Inc.

10 – 49

Harrison Electric Company Revisited

Single-goal programming formulation

Copyright ©2015 Pearson Education, Inc.

10 – 50

Minimize under or

overachievement = d1– + d1+

of profit target

subject to

$7X1 + $6X2 + d1– – d1+ = $30 (profit goal constraint)

2X1 + 3X2 ≤ 12 (wiring hours)

6X1 + 5X2 ≤ 30 (assembly hours)

X1, X2, d1–, d1+ ≥ 0

Minimize under or

overachievement = d1– + d1+

of profit target

subject to

$7X1 + $6X2 + d1– – d1+ = $30 (profit goal constraint)

2X1 + 3X2 ≤ 12 (wiring hours)

6X1 + 5X2 ≤ 30 (assembly hours)

X1, X2, d1–, d1+ ≥ 0

Single-goal programming formulation

Harrison Electric Company Revisited

Copyright ©2015 Pearson Education, Inc.

10 – 51

Analyze each goal to see if underachievement or overachievement of that goal is acceptable

If overachievement is acceptable, eliminate the appropriate d+ variable from the objective function

If underachievement is okay, the d– variable should be dropped

If a goal must be attained exactly, both d– and d+ must appear in the objective function

Extension to Equally Important Multiple Goals

Achieve several goals that are equal in priority

Goal 1: to produce a profit of $30 if possible during the production period

Goal 2: to fully utilize the available wiring department hours

Goal 3: to avoid overtime in the assembly department

Goal 4: to meet a contract requirement to produce at least seven ceiling fans

Copyright ©2015 Pearson Education, Inc.

10 – 52

Extension to Equally Important Multiple Goals

The deviational variables can be defined as

d1– = underachievement of the profit target

d1+ = overachievement of the profit target

d2– = idle time in the wiring department (underutilization)

d2+ = overtime in the wiring department (overutilization)

d3– = idle time in the assembly department (underutilization)

d3+ = overtime in the assembly department (overutilization)

d4– = underachievement of the ceiling fan goal

d4+ = overachievement of the ceiling fan goal

Copyright ©2015 Pearson Education, Inc.

10 – 53

Extension to Equally Important Multiple Goals

Management is unconcerned about d1+, d2+, d3–, and d4+ so these may be omitted from the objective function

New objective function and constraints

Copyright ©2015 Pearson Education, Inc.

10 – 54

Minimize total deviation = d1– + d2– + d3+ + d4–

subject to

$7X1 + $6X2 + d1– – d1+ = $30 (profit constraint)

2X1 + 3X2 + d2– – d2+ = 12 (wiring hours constraint)

6X1 + 5X2 + d3– – d3+ = 30 (assembly hours constraint)

X2 + d4– – d4+ = 7 (ceiling fan constraint)

All Xi, di variables ≥ 0

Ranking Goals with Priority Levels

In most goal programming problems, one goal will be more important than another

Lower-order goals considered only after higher-order goals are met

Priorities (Pis) are assigned to each deviational variable

P1 is the most important goal

P2 the next most important

P3 the third, and so on

Copyright ©2015 Pearson Education, Inc.

10 – 55

Ranking Goals with Priority Levels

Harrison Electric has set the following priorities for their four goals

Copyright ©2015 Pearson Education, Inc.

10 – 56

GOAL PRIORITY
Reach a profit as much above $30 as possible P1
Fully use wiring department hours available P2
Avoid assembly department overtime P3
Produce at least seven ceiling fans P4
Priority 1 is infinitely more important than Priority 2, which is infinitely more important than the next goal, and so on

Harrison Electric has set the following priorities for their four goals

Ranking Goals with Priority Levels

Copyright ©2015 Pearson Education, Inc.

10 – 57

GOAL PRIORITY
Reach a profit as much above $30 as possible P1
Fully use wiring department hours available P2
Avoid assembly department overtime P3
Produce at least seven ceiling fans P4
With ranking of goals considered, the new objective function is

Minimize total deviation = P1d1– + P2d2– + P3d3+ + P4d4–

Goal Programming with Weighted Goals

Priority levels assume that each level is infinitely more important than the level below it

However a goal may be only two or three times more important than another

Instead of placing these goals on different levels, they are placed on the same level but with different weights

The coefficients of the deviation variables in the objective function include both the priority level and the weight

Copyright ©2015 Pearson Education, Inc.

10 – 58

Goal Programming with Weighted Goals

Suppose Harrison decides to add another goal of producing at least two chandeliers

The goal of producing seven ceiling fans is considered twice as important as this goal

The goal of two chandeliers is assigned a weight of 1 and the goal of seven ceiling fans is assigned a weight of 2 and both of these will be priority level 4

The new constraint and objective function are

X1 + d5– – d5+ = 2 (chandeliers)

Minimize total = P1d1– + P2d2– + P3d3+ + P4(2d4–) + P4d5–

deviation

Copyright ©2015 Pearson Education, Inc.

10 – 59

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 60

PROGRAM 10.8A – Harrison Electric’s Goal Programming Analysis Using QM for Windows: Inputs

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 61

PROGRAM 10.8B – Summary Solution Screen for Harrison Electric’s Goal Programming Problem Using QM for Windows

Nonlinear Programming

The methods seen so far have assumed that the objective function and constraints are linear

However, there are many nonlinear relationships in the real world that would require the objective function and/or constraint equations to be nonlinear

Computational procedures for nonlinear programming (NLP) may only provide a local optimum solution rather than a global optimum

Copyright ©2015 Pearson Education, Inc.

10 – 62

Nonlinear Objective Function and Linear Constraints

The Great Western Appliance Company sells two models of toaster ovens, the Microtoaster (X1) and the Self-Clean Toaster Oven (X2)

They earn a profit of $28 for each Microtoaster no matter the number of units sold

For the Self-Clean oven, profits increase as more units are sold due to a fixed overhead

The profit function for the Self-Clean oven

21X2 + 0.25X22

Copyright ©2015 Pearson Education, Inc.

10 – 63

Nonlinear Objective Function and Linear Constraints

The objective function is nonlinear and there are two linear constraints on production capacity and sales time available

Copyright ©2015 Pearson Education, Inc.

10 – 64

Maximize profit = 28X1 + 21X2 + 0.25X22

subject to

X1 + X2 ≤ 1,000 (units of production capacity)

0.5X1 + 0.4X2 ≤ 500 (hours of sales time available)

X1, X2 ≥ 0

The objective function is nonlinear and there are two linear constraints on production capacity and sales time available

Nonlinear Objective Function and Linear Constraints

Copyright ©2015 Pearson Education, Inc.

10 – 65

Maximize profit = 28X1 + 21X2 + 0.25X22

subject to

X1 + X2 ≤ 1,000 (units of production capacity)

0.5X1 + 0.4X2 ≤ 500 (hours of sales time available)

X1, X2 ≥ 0

When an objective function contains a squared term and the problem constraints are linear, it is called a quadratic programming problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 66

PROGRAM 10.9 – Excel 2013 Solver Solution for Great Western Appliance NLP Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 67

Solver Parameter Inputs and Selections Key Formulas
Set Objective: E8 By Changing cells: B4:C4 To: Max Subject to the Constraints: E11:E12 <= G11:G12 Solving Method: GRG Nonlinear R Make Variables Non-Negative
PROGRAM 10.9 – Excel 2013 Solver Solution for Great Western Appliance NLP Problem

Both Nonlinear Objective Function and Nonlinear Constraints

The annual profit at a medium-sized (200-400 beds) Hospicare Corporation hospital depends on

The number of medical patients admitted (X1)

The number of surgical patients admitted (X2)

The objective function for the hospital is nonlinear

There are three constraints, two of which are nonlinear

Nursing capacity - nonlinear

X-ray capacity - nonlinear

Marketing budget required

Copyright ©2015 Pearson Education, Inc.

10 – 68

Both Nonlinear Objective Function and Nonlinear Constraints

Objective function and constraint equations

Copyright ©2015 Pearson Education, Inc.

10 – 69

Maximize profit = $13X1 + $6X1X2 + $5X2 + $1/X2

subject to

2X12 + 4X2 ≤ 90 (nursing capacity in thousands of labor-days)

X1 + X23 ≤ 75 (x-ray capacity in thousands)

8X1 – 2X2 ≤ 61 (marketing budget required in thousands of $)

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 70

PROGRAM 10.10 – Excel 2013 Solution to the Hospicare NLP Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 71

Solver Parameter Inputs and Selections Key Formulas
Set Objective: H8 By Changing cells: B4:C4 To: Max Subject to the Constraints: H11:H13 <= J11:J13 Solving Method: GRG Nonlinear R Make Variables Non-Negative Copy H8 to H11:H13
PROGRAM 10.10 – Excel 2013 Solution to the Hospicare NLP Problem

Linear Objective Function and Nonlinear Constraints

Thermlock Corp. produces massive rubber washers and gaskets like the type used to seal joints on the NASA Space Shuttles

It combines two ingredients, rubber (X1) and oil (X2)

The cost of the industrial quality rubber is $5 per pound and the cost of high viscosity oil is $7 per pound

Two of the three constraints are nonlinear

Copyright ©2015 Pearson Education, Inc.

10 – 72

Linear Objective Function and Nonlinear Constraints

Objective function and constraints

Copyright ©2015 Pearson Education, Inc.

10 – 73

Minimize costs = $5X1 + $7X2

subject to

3X1 + 0.25X12 + 4X2 + 0.3X22 ≥ 125 (hardness constraint)

13X1 + X13 ≥ 80 (tensile strength)

0.7X1 + X2 ≥ 17 (elasticity)

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 74

PROGRAM 10.11 – Excel 2013 Solution to the Thermlock NLP Problem

Using Software

Copyright ©2015 Pearson Education, Inc.

10 – 75

Solver Parameter Inputs and Selections Key Formulas
Set Objective: D5 By Changing cells: B4:C4 To: Min Subject to the Constraints: G10:G12 >= I10:I12 Solving Method: GRG Nonlinear R Make Variables Non-Negative Copy G10 to G11:G12
PROGRAM 10.11 – Excel 2013 Solution to the Thermlock NLP Problem

Copyright

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.

1

1.6 The Role of Computers and Spreadsheet Models in the Quantitative Analysis Approach

1.7 Possible Problems in the Quantitative Analysis Approach

1.8 Implementation—Not Just the Final Step

1.1 Introduction 1.2 What Is Quantitative Analysis? 1.3 Business Analytics 1.4 The Quantitative Analysis Approach 1.5 How to Develop a Quantitative Analysis Model

CHAPTER OUTLINE

5. Use computers and spreadsheet models to perform quantitative analysis.

6. Discuss possible problems in using quantitative analysis.

7. Perform a break-even analysis.

1. Describe the quantitative analysis approach. 2. Understand the application of quantitative analysis

in a real situation. 3. Describe the three categories of business analytics. 4. Describe the use of modeling in quantitative

analysis.

After completing this chapter, students will be able to:

Introduction to Quantitative Analysis

1CHAPTER

LEARNING OBJECTIVES

M01_REND7331_12_SE_C01_pp2.indd 1 01/10/13 9:50 AM

1

1.6 The Role of Computers and Spreadsheet Models in the Quantitative Analysis Approach

1.7 Possible Problems in the Quantitative Analysis Approach

1.8 Implementation—Not Just the Final Step

1.1 Introduction 1.2 What Is Quantitative Analysis? 1.3 Business Analytics 1.4 The Quantitative Analysis Approach 1.5 How to Develop a Quantitative Analysis Model

CHAPTER OUTLINE

5. Use computers and spreadsheet models to perform quantitative analysis.

6. Discuss possible problems in using quantitative analysis.

7. Perform a break-even analysis.

1. Describe the quantitative analysis approach. 2. Understand the application of quantitative analysis

in a real situation. 3. Describe the three categories of business analytics. 4. Describe the use of modeling in quantitative

analysis.

After completing this chapter, students will be able to:

Introduction to Quantitative Analysis

1CHAPTER

LEARNING OBJECTIVES

M01_REND7331_12_SE_C01_pp2.indd 1 01/10/13 9:50 AM

Limits are used, and the best solution available after a certain time is presented.

Notice that only X must be integer, while Y may be any real number.

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Top Class Results
Engineering Solutions
Finance Master
Top Academic Guru
Best Coursework Help
Accounting & Finance Master
Writer Writer Name Offer Chat
Top Class Results

ONLINE

Top Class Results

After reading your project details, I feel myself as the best option for you to fulfill this project with 100 percent perfection.

$16 Chat With Writer
Engineering Solutions

ONLINE

Engineering Solutions

I have worked on wide variety of research papers including; Analytical research paper, Argumentative research paper, Interpretative research, experimental research etc.

$31 Chat With Writer
Finance Master

ONLINE

Finance Master

I have worked on wide variety of research papers including; Analytical research paper, Argumentative research paper, Interpretative research, experimental research etc.

$29 Chat With Writer
Top Academic Guru

ONLINE

Top Academic Guru

I am a professional and experienced writer and I have written research reports, proposals, essays, thesis and dissertations on a variety of topics.

$35 Chat With Writer
Best Coursework Help

ONLINE

Best Coursework Help

I have read your project details and I can provide you QUALITY WORK within your given timeline and budget.

$41 Chat With Writer
Accounting & Finance Master

ONLINE

Accounting & Finance Master

I reckon that I can perfectly carry this project for you! I am a research writer and have been writing academic papers, business reports, plans, literature review, reports and others for the past 1 decade.

$28 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Interactive metronome equipment cost - Dictionary yahoo hong kong - Organisation Behavior - Christine ewing is a licensed cpa - Yabb œ 2000 2005 all rights reserved - I Need 1500 words on solution an International Management (BUSS 1006)-CW3-Fall-19-QP - Pyramid vertices edges faces - Blood donation persuasive speech outline - Sbcms polytechnic attalgarh mukerian - What are the elements of music - Power factor correction australia - Triangular trade route map - Cannot copy and paste from pdf - One night the moon language identity and culture - Virtual lab punnett squares worksheet answer key - World war i test - It doesn t matter case study - Environmental management system template australia - Slp 1 537 - Classical mythology in context pdf - Child observation notes - Mendel conducted his most memorable experiments on - Concepts in enterprise resource planning 4th edition solutions pdf - Pacific cataract and lasik institute - You are on the roof of the physics building - NURS340REPLY - Case Study - What elements support community participation and social inclusion best practice - Fundamentals of occupational safety and health pdf - Ida sidha karya company is a family owned - A JOURNAL AND A DB - Iom report the future of nursing leading change advancing health - Mass-Panic - Acid base reaction endothermic or exothermic - Babyliss paris ipro 235 intense protect - Mysql workbench table relationships diagram - Need presentation based on uploaded document - Dissertation on IoT Cybersecurity - Label each of the arrows in the following slide image - Market Opportunity - International plant nutrition institute - Criteria cognitive aptitude test answers - Week 5 - Assignment: Compare and Contrast Data Life Cycles - What is mass haul diagram - Domino's pizza marketing mix - Lexi in the vampire diaries - Splunk power user certification dumps - Why you should donate blood speech outline - Australian country outfitters dandenong - Fluke 1653b price australia - Emag2 for google earth - Are moon jellyfish pelagic or benthic organisms - Deception in much ado about nothing - The new colossus paraphrase - Through women's eyes an american history with documents fifth edition - The real cost of cheap fashion worksheet answers - The author to her book - 1/9 elamang avenue kirribilli - Safe space training manual - Gatesletter dotcom - Three questions - What is your working credit on centrelink - Ib chemistry syllabus 2016 - St john dress 14 - 4.05 the great depression - Uniformity of dosage units - Etl service manager port 9001 - Grand canyon university lesson plan template - Org Behavior Reflection, Discussion and Assignment - In another country hemingway analysis - Unit IV - How to find the radius of two concentric circles - Power factor correction explained - Aboriginal charter of rights poem - What is a think tank session - Introductory statistics homework answers - T flip flop using 2x1 mux - Trade and cash discount exercise - Porosity and permeability animation - Standard chartered 150 banknote - Australian police rugby union - The butterfly by patricia polacco youtube - Identifying verbs in a passage - Discussion 4 - East taphouse village hall - Power point - The first required step in the accounting cycle is - Using Visual Communication to Deliver a Global Message - What is wacc and why is it important - Hazel eyes and blue eyes punnett square - Why must the positive electrode be continually replaced - Rite of passage poem analysis - 07-LA2 - What is the difference between a need and a want? How do marketers create wants? Provide several examples. - Ethernet cable color order - Discuss the process that generates the power of AI and discuss the differences between machine learning and deep learning. - Pecking order theory investopedia - HSA 599 WEEK 10 DISCUSSION - Racism birth control and reproductive rights summary - What does rtn mean in penn foster