Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

The project communications management knowledge area maps to the

26/11/2021 Client: muhammad11 Deadline: 2 Day

1

Marks: 1

Many people consider project integration management the key to overall pr= oject success.

Answer:

Question 2

Marks: 1

The ____ section of the project plan should describe the major project functions and activities and identify those individuals who are responsible for them.

Choose one answer.

a. organizational charts

b. other organizational or process-related informatio= n

c. project responsibilities

d. management objectives

Question 3

Marks: 1

____ should result in improvements in project performance.

Choose one answer.

a. Corrective actions

b. Corrective reports

c. Preventive actions

d. Proactive methods

Question 4

Marks: 1

The majority of time on a project is usually spent on ____, as is most of= the project’s budget.

Choose one answer.

a. execution

b. planning

c. closing

d. monitoring and controlling

Question 5

Marks: 1

A ____ is a document that includes details related to the identified proj= ect stakeholders.

Choose one answer.

a. stakeholder register

b. stakeholder list

c. stakeholder directory

d. stakeholder contact list

Question 6

Marks: 1

Key outcomes of the executing process group are formal acceptance of the = work and creation of closing documents.

Answer:

Question 7

Marks: 1

____ provide information on how project execution is going.

Choose one answer.

a. Performance reports

b. Change requests

c. Deliverables

d. Contracts

Question 8

Marks: 1

Decisions and actions taken in one knowledge area at a certain time rarel= y affect other knowledge areas.

Answer:

Question 9

Marks: 1

____ is a planning process falling under the Project Integration Manageme= nt knowledge area.

Choose one answer.

a. Schedule development

b. Develop project management plan =

c. Create WBS

d. Quality planning

Question 10

Marks: 1

Project integration management must occur just within the context of a pa= rticular project.

Answer:

Question 11

Marks: 1

During ____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition.

Choose one answer.

a. initiating

b. planning

c. opening

d. controlling

Question 12

Marks: 1

Author ____, who developed the concept of the strategic value of competitive advantage, has written several books and articles on strategic planning and competition.

Choose one answer.

a. James Bacon

b. Michael Porter

c. Robert Cooper

d. Carol Matlack

Question 13

Marks: 1

Opportunities and directives are essentially the same thing.

Answer:

Question 14

Marks: 1

____ tools track the execution of business process flows and expose how the state of supporting IT systems and resources is impacting end-to-end business process performance in real time.

Choose one answer.

a. BSM

b. CCB

c. CCA

d. BSC

Question 15

Marks: 1

____ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time.

Choose one answer.

a. Cost of capital

b. Net present value

c. Cash flow

d. Payback

Question 16

Marks: 1

____ the project involves taking the actions necessary to ensure that act= ivities in the project plan are completed.

Choose one answer.

a. Executing

b. Initiating

c. Starting

d. Coordinating

Question 17

Marks: 1

As projects progress, the organization must reevaluate the need, funding, and will for each project to determine if the project should be continued, redefined, or terminated.

Answer:

Question 18

Marks: 1

An organization’s information technology project selection proces= s should guide the strategic plan.

Answer:

Question 19

Marks: 1

The ____ provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.

Choose one answer.

a. WSB

b. project team analysis

c. WBS

d. project tool

Question 20

Marks: 1

A/An ____ is a document that describes the products or services to be cre= ated by the project team.

Choose one answer.

a. contract

b. statement of work

c. project charter

d. business case

Question 21

Marks: 1

A stakeholder management strategy is an approach to help increase the sup= port of stakeholders throughout the project.

Answer:

Question 22

Marks: 1

The project procurement management knowledge area maps to the ____ process group through the activity of administering procurements.

Choose one answer.

a. initiating

b. planning

c. executing

d. monitoring and controlling

Question 23

Marks: 1

Which of the following is an important input to the integrated change con= trol process?

Choose one answer.

a. Deliverables

b. Work performance information =

c. Approved and rejected change requests =

d. Approved and validated defect repair =

Question 24

Marks: 1

All projects can benefit from using some type of project management information system to coordinate and communicate project information.

Answer:

Question 25

Marks: 1

Project managers should never be involved in strategic planning and proje= ct selection.

Answer:

Question 26

Marks: 1

Executing the project includes work required to introduce any new hardwar= e, software, and procedures into normal operations.

Answer:

Question 27

Marks: 1

In the ____ stage of selecting information technology projects, organizat= ions select information technology projects.

Choose one answer.

a. Project Planning

b. Business Area Analysis

c. Resource Allocation

d. Information Technology Strategy Planning =

Question 28

Marks: 1

The project scope management knowledge area maps to the ____ process group through the activities of scope verification and scope control.

Choose one answer.

a. initiating

b. planning

c. executing

d. monitoring and controlling

Question 29

Marks: 1

A commonsense approach to improving the coordination between project plan development and execution is to follow this simple rule: Those who will do the work should not plan the work.

Answer:

Question 30

Marks: 1

A/An ____ is a formal group of people responsible for approving or reject= ing changes to a project.

Choose one answer.

a. CCA

b. CCB

c. CCC

d. CCD

Question 31

Marks: 1

A/An ____ is a formal, documented process that describes when and how off= icial project documents may be changed.

Choose one answer.

a. integrated change control

b. change request

c. performance report

d. change control system

Question 32

Marks: 1

____ support contributes the most to successful information technology pr= ojects.

Choose one answer.

a. Stakeholder

b. Team

c. Executive

d. User

Question 33

Marks: 1

The first step in determining the NPV is to ____.

Choose one answer.

a. determine the estimated costs and benefits for the= life of the project and the products it produces

b. determine the discount rate <= /label>

c. calculate the net present value =

d. determine the cash flow

Question 34

Marks: 1

A milestone list is an output list associated with the Project Scope Mana= gement knowledge area.

Answer:

Question 35

Marks: 1

Projects that address ____ are much more likely to be successful because = they will be important to the organization.

Choose one answer.

a. a balanced scorecard

b. a weighted scoring model

c. broad organizational needs

d. net present value

Question 36

Marks: 1

In the ____ stage, organizations tie information technology strategy to mission and vision of organization and identify key business areas.

Choose one answer.

a. Project Planning

b. Business Area Analysis

c. Resource Allocation

d. Information Technology Strategy Planning =

Question 37

Marks: 1

____ are new requirements imposed by management, government, or some exte= rnal influence.

Choose one answer.

a. Opportunities

b. Commands

c. Problems

d. Directives

Question 38

Marks: 1

Information technology is usually a support function in an organization.<= /div>

Answer:

Question 39

Marks: 1

The ____ is the minimum acceptable rate of return on an investment.

Choose one answer.

a. return on investment

b. internal rate of return

c. external rate of return

d. required rate of return

Question 40

Marks: 1

Research shows that ____ is the number one reason cited for why organizat= ions invest in information technology projects.

Choose one answer.

a. providing financial incentives =

b. supporting implicit business objectives =

c. supporting explicit business objectives =

d. keeping abreast of technological advances =

Question 41

Marks: 1

One method for selecting projects based on ____ is to determine whether they first meet three important criteria: need, funding, and will.

Choose one answer.

a. broad organizational needs

b. using a weighted scoring model =

c. implementing a balanced scorecard =

d. categorizing information technology projects =

Question 42

Marks: 1

Administrative activities are often involved in ____, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project.

Choose one answer.

a. monitoring and controlling processes =

b. executing processes

c. initiating processes

d. closing processes

Question 43

Marks: 1

Project integration management does not include interface management.

Answer:

Question 44

Marks: 1

A/An ____ is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management.

Choose one answer.

a. balanced scorecard

b. business case

c. net present value analysis

d. project charter

Question 45

Marks: 1

A ____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.

Choose one answer.

a. kick-off party

b. launch meeting

c. kick-off meeting

d. project launch meeting

Question 46

Marks: 1

The project integration management knowledge area maps to the ____ process group through the activities of developing project charters.

Choose one answer.

a. initiating

b. planning

c. executing

d. monitoring and controlling

Question 47

Marks: 1

____ is a monitoring and controlling process.

Choose one answer.

a. Develop project team

b. Request seller responses

c. Risk response planning

d. Integrated change control

Question 48

Marks: 1

The project procurement management knowledge area maps to the ____ process group through the activities conducting procurements.

Choose one answer.

a. initiating

b. planning

c. executing

d. monitoring and controlling

Question 49

Marks: 1

Projects involve ____ project management process groups.

Choose one answer.

a. three

b. five

c. eight

d. ten

Question 50

Marks: 1

The first step in creating a weighted scoring model is to assign a weight= to each criterion.

Answer:

Question 51

Marks: 1

Some people might use a contract in place of a charter.

Answer:

Question 52

Marks: 1

The ____ step in the planning process is to tie the information technology strategic plan to the organization’s overall strategic p= lan.

Choose one answer.

a. first

b. second

c. third

d. fourth

Question 53

Marks: 1

Project management plans document project planning assumptions and decisi= ons regarding choices.

Answer:

Question 54

Marks: 1

In addition to progress reports, an important tool for monitoring and controlling a project is using project management software.

Answer:

Question 55

Marks: 1

____ include devising and maintaining a workable scheme to ensure that th= e project addresses the organization’s needs.

Choose one answer.

a. Initiating processes

b. Planning processes

c. Executing processes

d. Monitoring and controlling processes =

Question 56

Marks: 1

A/An ____ is a document used to coordinate all project planning documents= and help guide a project’s execution and control.

Choose one answer.

a. project management plan

b. statement of work

c. scope statement

d. contact

Question 57

Marks: 1

In the ____ information technology planning stage, the analysis outlines business processes that are central to achieving strategic goals and helps determine which ones could most benefit from information technology.

Choose one answer.

a. Project Planning

b. Business Area Analysis

c. Resource Allocation

d. Information Technology Strategy Planning =

Question 58

Marks: 1

Initiating processes take place during each phase of a project.

Answer:

Question 59

Marks: 1

Directing and managing project execution involves carrying out the project management plan by performing the activities included in it.

Answer:

Question 60

Marks: 1

A ____ is an approach to help increase the support of stakeholders throug= hout the project.

Choose one answer.

a. stakeholder management plan <= /label>

b. stakeholder strategy

c. stakeholder management strategy =

d. stakeholder management list <= /label>

Question 61

Marks: 1

The ____ process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end.

Choose one answer.

a. ending

b. closing

c. developing

d. completing

Question 62

Marks: 1

____ ensures that the descriptions of the project’s products are = correct and complete.

Choose one answer.

a. CCB

b. Correction management

c. Configuration management

d. Product description management =

Question 63

Marks: 1

In the ____ stage of selecting information technology projects, organizat= ions define project scope, benefits, and constraints.

Choose one answer.

a. Project Planning

b. Business Area Analysis

c. Resource Allocation

d. Information Technology Strategy Planning =

Question 64

Marks: 1

On large projects, many project managers say that ____ percent of the job= is communicating and managing changes.

Choose one answer.

a. 50

b. 70

c. 90

d. 100

Question 65

Marks: 1

It is good practice to focus on the ____ of meetings.

Choose one answer.

a. flow

b. planning

c. agenda

d. results

Question 66

Marks: 1

The process of acquiring a project team falls under the Project Human Res= ource Management knowledge area.

Answer:

Question 67

Marks: 1

____ is an iterative software development process that focuses on team productivity and delivers software best practices to all team members.

Choose one answer.

a. RAP

b. RIP

c. RUP

d. ROP

Question 68

Marks: 1

An annual discount factor is a multiplier for each year based on the disc= ount rate and year.

Answer:

Question 69

Marks: 1

In the long-term view, it is better to have a huge success on an unimportant project than to have a moderate success on an important project.

Answer:

Question 70

Marks: 1

____ involves coordinating all planning efforts to create a consistent, c= oherent document.

Choose one answer.

a. Developing the project charter =

b. Developing the preliminary project scope statement=

c. Developing the project management plan =

d. Directing and managing project execution =

Question 71

Marks: 1

____ should serve as the foundation for deciding which projects to pursue= .

Choose one answer.

a. Strategic planning

b. Project managers

c. Successful past projects

d. Employee abilities

Question 72

Marks: 1

The level of activity and length of each process group varies for every p= roject.

Answer:

Question 73

Marks: 1

Examples of ____ include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements.

Choose one answer.

a. monitoring and controlling processes =

b. executing processes

c. planning processes

d. initiating processes

Question 74

Marks: 1

The project communications management knowledge area maps to the ____ process group through the activity of information distribution.

Choose one answer.

a. initiating

b. planning

c. executing

d. monitoring and controlling

Question 75

Marks: 1

Many people are familiar with SWOT analysis—analyzing Strengths,= Weaknesses, Opportunities, and Threats—which is used to aid in ____= .

Choose one answer.

a. project initiation

b. project planning

c. strategic planning

d. strategic initiation

=

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Financial Analyst
Custom Coursework Service
Engineering Exam Guru
Finance Professor
Math Guru
Quick Mentor
Writer Writer Name Offer Chat
Financial Analyst

ONLINE

Financial Analyst

I have written research reports, assignments, thesis, research proposals, and dissertations for different level students and on different subjects.

$23 Chat With Writer
Custom Coursework Service

ONLINE

Custom Coursework Service

I will provide you with the well organized and well research papers from different primary and secondary sources will write the content that will support your points.

$40 Chat With Writer
Engineering Exam Guru

ONLINE

Engineering Exam Guru

I have done dissertations, thesis, reports related to these topics, and I cover all the CHAPTERS accordingly and provide proper updates on the project.

$44 Chat With Writer
Finance Professor

ONLINE

Finance Professor

I am an experienced researcher here with master education. After reading your posting, I feel, you need an expert research writer to complete your project.Thank You

$32 Chat With Writer
Math Guru

ONLINE

Math Guru

Being a Ph.D. in the Business field, I have been doing academic writing for the past 7 years and have a good command over writing research papers, essay, dissertations and all kinds of academic writing and proofreading.

$22 Chat With Writer
Quick Mentor

ONLINE

Quick Mentor

I am an academic and research writer with having an MBA degree in business and finance. I have written many business reports on several topics and am well aware of all academic referencing styles.

$43 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Mad lib story ideas - Old parliament house tennis courts - Stakeholder theory of corporate governance ppt - Narrator of the outsider - Aesthetic principles of art - 3.5 mm steel rod - A red red rose poem questions and answers - Pearson Portuguese lab - Strategic Management Memo (ASAP ,max 6 hours) - Capacitor virtual lab - As 1905.1 fire doors - Declare an integer variable named degreescelsius - Research Papaer - How to calculate fnet - Ethical decision case study - Continental carriers inc case study solution - Federal case which influences commerce on the internet - Key practices in the partnering approach to managing contracted relationships include - A christmas carol questions - Separation of acetone and water by simple distillation - Annotated Bibliography 8352 - Discussion 6 - Human genetics lewis 11th edition - Bachelor of counselling usc - High temp loctite 2620 - Auditing Case Study - Cardiff university pre sessional - Este restaurante sirve más cincuenta platos tradicionales. ¡tienes que venir a probar alguno! - Veeam vmce 9.5 dumps - Policy brief executive summary example - Cultural assessment assignment - Dbq document analysis chart were andrew carnegie - Scott butler corporation balance sheet - History us - NoSQL database application - Staffordshire university human resources - Why does wheeled coach have excess inventory - Elisha and the shunammite woman - Access Control - Is c6h12o6 organic or inorganic - Food chain food web energy pyramid - How to tighten lug nuts - Introduction to derivative securities financial markets and risk management - Bambang trihatmodjo net worth - Documenting reality 9 11 - Chapter 7 negotiating intersections word search puzzle answer key - Longchamp japan limited edition 2015 - Foreign exchange risk is the adverse consequences of unpredictable changes in - Snpha national conference 2017 schedule - Cp2 - We don't need no education lyrics meaning - Mysql and database (MySql WorkBench) - Interpersonal communication in movies essay - Bianca is making scarves to sell answer - Adela (encantar) la música de tito "el bambino". a me (interesar) la música de otros países. - Trevor off key i love my light - Palo alto 5250 throughput - Mid warwick cats protection - Greek alphabet cheat sheet - The chemical hut discount code - April and davey ages - How to draw bode plot by hand - A signal word is - The journey of my life poem by rabindranath tagore - The mega marketing of depression in japan - Pizza ordering app development - Sheet resistance calculation example - Annual inventory holding cost formula - Pre lab questions answers biology - Types of ict systems - "Revolutions after the Revolution" - Mass volume and density - Fermi energy and electron density - Nelly sexualing healing remix lyrics - The director of admissions at kinzua university - DISCUSSION BOARD - Antacid analysis lab report - Discussion Resp (FAM) - 2 pm military time - Advantages of e-business over the traditional one with the new payroll system. - Alternative conceptions about living things - 3par disk replacement procedure - Black wattle bay school - Iec 61000 4 8 - Fate vs free will macbeth - Environmental management zone brisbane - Moles of hcl neutralized by naoh - Share registry for woolworths - Siemens builds a strategy oriented hr system solution - macroeconomic concepts - Jump math grade 10 - Biology year 8 worksheets - Phones should not be banned in school - Mythbusters walking on water worksheet - Convert amu to grams - What does the second quantum number l describe - Laureate house wythenshawe hospital - No impact man book review - Hunger games sequence of events - Tiaa access lifecycle fund 2050 t4