Loading...

Messages

Proposals

Stuck in your homework and missing deadline? Get urgent help in $10/Page with 24 hours deadline

Get Urgent Writing Help In Your Essays, Assignments, Homeworks, Dissertation, Thesis Or Coursework & Achieve A+ Grades.

Privacy Guaranteed - 100% Plagiarism Free Writing - Free Turnitin Report - Professional And Experienced Writers - 24/7 Online Support

Tutorial 8 sam project 1a

15/10/2021 Client: muhammad11 Deadline: 2 Day

New Perspectives Excel

New Perspectives Excel 2019 Tutorial 10: SAM Project 1a complete solutions correct answers key

New Perspectives Excel 2019

Tutorial 10: SAM Project 1a

Firestone Clock Company

WHAT-IF ANALYSES AND SCENARIOS

Project Goal

M Project Name

Project Goal

PROJECT DESCRIPTION

Walter Silva runs operations at Firestone Clock Company. The company currently owns and operates its own manufacturing facilities that produce three lines of clocks, Desktop Models, Wall Units, and Custom Clocks. Manufacturing and other costs have been rising, and profits are being squeezed. Walter has asked you to create a workbook that details the financial components of each product line, then analyze a number of scenarios that involve cutting expenses and/or raising prices. You are trying to find the most profitable mix of products using the most cost-effective means of production.

GETTING STARTED

· Download the following file from the SAM website:

o NP_Excel2013_T10_P1a_FirstLastName_1.xlsx

· Open the file you just downloaded and save it with the name:

o NP_Excel2013_T10_P1a_FirstLastName_2.xlsx

o Hint: If you do not see the .xlsx file extension in the Save file dialog box, do not type it. Excel will add the file extension for you automatically.

· With the file NP_Excel2013_T10_P1a_FirstLastName_2.xlsx still open, ensure that your first and last name is displayed in cell B6 of the Documentation sheet. If cell B6 does not display your name, delete the file and download a new copy from the SAM website.

· This project requires the use of the Solver add-in. If this add-in is not available in the Analysis group (or if the Analysis group is not av­ailable) on the DATA tab, install Solver by following the steps below.

o In Excel, click the FILE tab, and then click the Options button in the left navigation bar.

o Click the Add-Ins option in the left pane of the Excel Options window.

o Click on the arrow next to the Manage box, click the Excel Add-Ins option, and then click the Go button.

o In the Add-Ins window, click the check box next to the Solver Add-In option and then click the OK button.

o Follow any remaining prompts to install Solver.

PROJECT STEPS

1. Go to the Desktop Models worksheet. In cell C28, use Goal Seek to perform a break-even analysis for Desktop Models by calculating the number of units the company needs to sell (represented by the value in cell C27), at the price per unit listed in cell C25, in order to break even, or reach a Gross Profit of $0. (Hint: The number format applied to cell C25 will make a value of $0 display as $ -)

2. Create a one-variable data table to display values for Sales, Expenses, and Profits based on the Number of Clocks sold by completing the following actions:

a. In cell E5, enter a formula to reference cell C5, which is the input cell to be used in the data table.

b. In cell F5, enter a formula that references cell C20, which is the expected total sales for this product.

c. In cell G5, enter a formula that references cell C21, which is the expected total expenses for this product.

d. In cell H5, enter a formula that references cell C22, which is the expected gross profit for this product.

e. Select the range E5:H10 and then complete the one-variable data table, using cell C5 as the Column input cell for your data table.

3. Select range E14:L19. Create a two-variable data table to display values for gross Profit based on Units Sold and Price per Unit (Hint: Use cell C6 as the Row input cell and cell C5 as the Column input cell).

4. Apply a custom format to cell E14 to display the text “Units Sold/Price” in place of the cell value.

5. Go to the Wall Units worksheet. Create a Scatter with Straight Lines chart based on range E4:G14 in the data table Wall-Units – Break-Even Analysis. Modify the chart as described below:

a. Resize and reposition the chart so the upper-left corner is in cell E15 and the lower-right corner is in cell H28.

b. Remove the chart title from the chart.

c. Add Sales and Expenses as the Vertical Axis title and Units Sold as the Horizontal Axis title.

d. For the Vertical Axis, change the Minimum Bounds to 300000 and the Maximum Bounds to 550000. Change the Number format of the Vertical Axis to Currency with 0 decimal places.

e. For the Horizontal Axis, change the Minimum Bounds to 5000 and the Maximum Bounds to 9000.

f. Use the Change Colors option to change the color set for the chart to Color 14 (the 4th entry from the bottom in the gallery of color choices).

6. Open the Scenario Manager and add two scenarios for the data in the Wall Units worksheet based on the data shown in Table 1. The changing cells for both scenarios are the non-adjacent cells C12, and C15. Close the Scenario Manager without showing any of the scenarios.

Table 1: Wall Unit Scenario Values

Values

Scenario 1

Scenario 2

Scenario Name

Standard Materials

Green Materials

Wall_Unit_Variable_Cost (C12)

33.75

42.50

Wall_Unit_Fixed_Cost (C15)

175000

225000

Copyright © 2014 Cengage Learning. All Rights Reserved.

7. Go to Custom Clocks worksheet. Create a Scatter with Straight Lines chart based on range E6:J14 in the data table Custom Clocks – Net Income Analysis. Make the following modifications to the chart:

a. Resize and reposition the chart so the upper-left corner is in cell E15 and the lower-right corner is in cell J28.

b. Remove the chart title from the chart.

c. Reposition the chart legend to the Right of the chart.

d. Add the title Net Income as the Vertical Axis title and Units Sold as the Horizontal Axis title.

e. For the Vertical Axis, change the Minimum Bounds to -150000 and the Maximum Bounds to 250000. Change the Number format of the Vertical Axis to Currency with 0 decimal places.

f. For the Horizontal Axis, change the Minimum Bounds to 3000 and the Maximum Bounds to 7500.

8. In the Scatter with Straight Lines chart created in the previous step, edit the chart series names as described below:

a. For Series 1, set the series name to cell F5 (Hint: The series name should automatically update to =’Custom Clocks’!$F$5).

b. For Series 2, set the series name to cell G5.

c. For Series 3, set the series name to cell H5.

d. For Series 4, set the series name to cell I5.

e. For Series 5, set the series name to cell J5.

9. Firestone Clocks is considering subcontracting the construction of their Custom Clock line to other woodshops in the area. Walter wants to determine if this option will reduce the costs associated with this product line.

Go to the Custom Clock – Suppliers worksheet. Run Solver to minimize the value in cell F11 (Total Cost) by adjusting number of units produced by each woodshop (Hint: Changing cells will be C5:E5) assuming the four (4) manufacturing constraints below:

a. F5=5500

b. F11 <=560000

c. C5:E5 <=3500

d. C5:E5 should be an Integer

Run Solver, keep the Solver Solution, and then return to the Solver Parameters Dialog box. Save the model to the range B15:B22. Close the Solver Parameters Dialog box.

10. Go to the All Products worksheet. Open the Scenario Manager and create a Scenario Summary report for the resultant cells C18:E18. The Scenario Summary report will summarize the impact of the following three scenarios: Status Quo, Outsource Manufacturing, Raise Prices 5%.

11. Go back to the All Products worksheet. Open the Scenario Manager and create a Scenario PivotTable report for result cells C18:E18. Format the Scenario PivotTable as described below:

a. Remove the Filter field from the PivotTable.

b. Change the number format of the Profit_per_Unit_Sold_Desktop, Profit_per_Unit_Sold_Wall_Units, and Profit_per_Unit_Sold_Custom fields (located in the Values box of the PivotTable Field List) to Currency (with 2 decimal places).

c. In cell A1, enter the value All Products Scenario PivotTable and format the cell with the Title cell style.

12. Go back to the All Products worksheet. Open the Scenario Manager and view the Outsource Manufacturing scenario in the worksheet.

Your workbook should look like the Final Figure on the following page. Note that some of the outcome values have been intentionally blanked out. Save your changes, close the workbook, and exit Excel. Follow the directions on the SAM website to submit your completed project.

Final Figure 1: Desktop Models Worksheet

Microsoft product screenshot reprinted with permission from Microsoft Incorporated.

Final Figure 2: Wall Units Worksheet

Final Figure 3: Custom Clocks Worksheet

Final Figure 4: Scenario Summary Worksheet

Final Figure 5: Scenario PivotTable Worksheet

Final Figure 6: All Products Worksheet

Homework is Completed By:

Writer Writer Name Amount Client Comments & Rating
Instant Homework Helper

ONLINE

Instant Homework Helper

$36

She helped me in last minute in a very reasonable price. She is a lifesaver, I got A+ grade in my homework, I will surely hire her again for my next assignments, Thumbs Up!

Order & Get This Solution Within 3 Hours in $25/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 3 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 6 Hours in $20/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 6 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

Order & Get This Solution Within 12 Hours in $15/Page

Custom Original Solution And Get A+ Grades

  • 100% Plagiarism Free
  • Proper APA/MLA/Harvard Referencing
  • Delivery in 12 Hours After Placing Order
  • Free Turnitin Report
  • Unlimited Revisions
  • Privacy Guaranteed

6 writers have sent their proposals to do this homework:

Instant Assignment Writer
Chartered Accountant
Peter O.
Math Exam Success
Professor Smith
24/7 Assignment Help
Writer Writer Name Offer Chat
Instant Assignment Writer

ONLINE

Instant Assignment Writer

I can assist you in plagiarism free writing as I have already done several related projects of writing. I have a master qualification with 5 years’ experience in; Essay Writing, Case Study Writing, Report Writing.

$29 Chat With Writer
Chartered Accountant

ONLINE

Chartered Accountant

I have assisted scholars, business persons, startups, entrepreneurs, marketers, managers etc in their, pitches, presentations, market research, business plans etc.

$15 Chat With Writer
Peter O.

ONLINE

Peter O.

I am an academic and research writer with having an MBA degree in business and finance. I have written many business reports on several topics and am well aware of all academic referencing styles.

$40 Chat With Writer
Math Exam Success

ONLINE

Math Exam Success

This project is my strength and I can fulfill your requirements properly within your given deadline. I always give plagiarism-free work to my clients at very competitive prices.

$45 Chat With Writer
Professor Smith

ONLINE

Professor Smith

As per my knowledge I can assist you in writing a perfect Planning, Marketing Research, Business Pitches, Business Proposals, Business Feasibility Reports and Content within your given deadline and budget.

$39 Chat With Writer
24/7 Assignment Help

ONLINE

24/7 Assignment Help

I will provide you with the well organized and well research papers from different primary and secondary sources will write the content that will support your points.

$33 Chat With Writer

Let our expert academic writers to help you in achieving a+ grades in your homework, assignment, quiz or exam.

Similar Homework Questions

Sikadur 41 data sheet - How to set snagit as default print screen - Drug and nutrition articles and 18 short answers - Cannibalism in the cars sparknotes - ENG 1100 MOD 5 Rough - Dr samantha batt rawden - E learning questions and answers - Bond breaking and bond making worksheet - Affluent chinese during the tang dynasty - Emergency medicine medical student survival guide - M cotteleer electronics supplies microcomputer circuitry to a company - Triangle diamond necklace girlfriends guide to divorce - Molecular weight determination lab report - Business selection criteria - Odds of yellowstone erupting - Emperor of china self portrait of kang hsi - Linguistic Assignment - Among us hack download - For Essays Guru - - 88.3 kg to lbs - Canicula norma cantu - Sodium hydroxide potassium hydrogen phthalate - Psy 110 university of phoenix - How would you characterize chiquita's historical approach to global management - 111 jacaranda ave bradbury - Trustwave scanning ip range - Define purpose statement in research - Report for experiment 15 forming and naming ionic compounds answers - Accounts that would appear on a balance sheet - Temperate grassland cold desert - Four identical metal spheres have charges of - Wipo romarin international registration - Econometrics - Arup family health clinic - Essay - Ronen and shenkar country clusters - Explain why psychology is considered a science - Leeds student medical practice - What promotional strategy should be pursued by papa john's to attract antonio's business? - Shadow health digital clinical experience health assessment - Little red midnight remember - Define relevant costs why are historical costs irrelevant - Marginal cost benefit analysis and the goal of the firm - Invictus movie analysis - Payment - A small good thing - Case problem all time movie box office data - Mansfield high school open day - Exodus 16 17 summary - America by claude mckay worksheet answers - Competitive advantages of starbucks - Organization leadership - Nestle case study managing organizational change - Mockabilly - 8 aesthetic principles - Lesson plan on simple equations class 7 - Estimate the area under the graph using midpoints - Key Success Factors portion of an industry analysis report that will be provided - Cu h20 6 2 - Laker company reported the following january purchases - Controversial issue paper bshs 355 - Case study Midterm Exam - Middlesex county joint health insurance fund - Barbaras italian restaurant rouse hill - Healthy people 2020 - How to replace missing values in spss - Absorbance spectra for green solution - Goal setting for students template - During november the production department of a process - Statistical studies statistical investigations margin of error - Need to get a PowerPoint and Lesson Plan done by Sunday, who wants some extra cash? - Pediatric Care - Home building contract over $20 000 - English housing survey data - Open root pipe welding - Post - 3 year old shoe size australia - Bank of baroda form no 60 - Which best summarizes ida tarbell's assessment of standard oil - Voting! - What is the prospector in the glass castle - Economies of Education - 10 journal articles review summary - Year 7 ancient egypt assessment task - Battle of the somme lesson plan - Discussion Board Unit 3 - Basic block diagram of refrigerator - Miss evers boys movie download - Chapter 3 exponential logistic and logarithmic functions 3.1 major concepts - Oxford scale muscle strength - TOPIC: Atrial Fibrillation disease detection using Convolutional neural networks - Arthur symons of our spiritual strivings - Malware domain list txt - Discussion - IT217: Programming Language week 4 - Skin Disorders - Nbcot study pack reviews - Barren field frozen with snow - Prince charles hospital mental health - Reflection in Action - Alien periodic table worksheet