Unit 2 - Chapter 3 Assignment Page 1 of 7
Unit 2 - Chapter 3 Assignment Page 1 of 7
1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.)
Predetermined overhead rate
per DLH
2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places and final answers to the nearest dollar amount.)
Product Y
Product Z
Manufacturing overhead allocated
3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.)
Activity rate
per MH
4. What is the activity rate for the Machine Setups activity cost pool? (Round your answer to 2 decimal places.)
Activity rate
per setup
5. What is the activity rate for the Product Design activity cost pool? (Round your answer to 2 decimal places.)
Activity rate
per product
6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)
Activity rate
per DLH
7. Which of the four activities is a batch-level activity?
Machining activity
General factory activity
Product design activity
Machine setups activity
8.
Which of the four activities is a product-level activity?
Product design activity
Machine setups activity
General factory activity
Machining activity
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)
Total manufacturing overhead cost
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)
Total manufacturing overhead cost
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your answers to 2 decimal places.)
Product Y
Product Z
Total overhead cost
%
%
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product
Z? (Round your answers to 2 decimal places.)
Product Y
Product Z
Machining cost
%
%
13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)
Product Y
Product Z
Machine setups cost
%
%
14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and
Product Z? (Round your answers to 2 decimal places.)
Product Y
Product Z
Product design cost
%
%
15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and
Product Z? (Round your answers to 2 decimal places.)
Product Y
Product Z
General factory cost
%
%
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
http://ezto.mheducation.com/hm.tpx?_=0.001979936659348147_1494652129518 5/13/2017
http://ezto.mheducation.com/hm.tpx?_=0.001979936659348147_1494652129518 5/13/2017