Conveyor Belt Project Assignment (WBS)Part 1
Conveyor Belt Project- Part 1
Project Description
The new computer-controlled conveyor belt is an exciting project that moves and positions items on the conveyor belt within < J millimeter. The project will produce a new system for future installations, and for replacement of those in the field, at a low cost. The computer-controlled conveyor belt has the potential to be a critical unit in 30 percent of the systems installed in factories. The new system is also easier to update with future technologies. The Project Priority Matrix for the Conveyor Belt Project (CBP) is:
time
scope
cost
constrain
X
enhance
X
accept
X
*Table A2.9 has been developed for you to use in completing the project exercise
Assignment
action: Develop the WBS outline using Microsoft project.
Question:
Does this information (in the WBS) allow you to define any milestones of the project? Why or why not? What are they?
TABLE A2.9 -Conveyor Belt Project; WBS
Hardware
Hardware specifications
Hardware design
Hardware documentation
Prototypes
Order circuit boards
Operating systems
Kernel specifications
Drivers
Disk drivers
Serial I/O drivers
Memory management
Operating system documentation
NetWork interface
Utilitites
Utilities specifications
Routine utilities
Complex utilities
Utilities documentation
Shell
System Integration
Architectural decisions
Integration first phase
System hard/software test
Project documentation
Integration acceptance testing