Case Study
Objectives
Identify potential risks and disruptions in global supply chain networks
Recommend operations strategies to manage supply chain risks and disruptions
Evaluate companies’ strategies in dealing with supply chain risks
Required Materials
Aggarwal, S., & Srivastava, M. K. (2016). Nissan: Recovering supply chain operations. Ivey Publishing.
Optional
Ellet, W. (2007). The case study handbook: How to read, discuss, and write persuasively about cases. Harvard Business Publishing.
Instructions
Analyze the “Nissan: Recovering Supply Chain Operations” case study. Prepare a MS Word document of 4-6 pages answering the 4 questions following the case. write each question and then give the answer. Be certain to discuss the items included in the rubric.
Case Questions
List four sources of supply chain risks for a Japanese automotive manufacturer such as Nissan. Include all sources of disruption mentioned in the case in your list.
What are the operational strategies for managing supply chain risks/disruptions? Evaluate Nissan on each of these.
In your opinion, had Nissan developed the perfect recovery strategy or is there still room for improvement for future crises?
Explain the difference between Nissan’s risk management and crisis management strategies and evaluate each.
Advanced Operations and Supply Chain Management
Various Professors
BUSI 3703
Yorkville University
Table of Contents
Introduction to Activity-Based Costing..............................................................................................5
Johnson Beverage, Inc...................................................................................................................19
Nissan: Recovering Supply Chain Operations................................................................................27
Advanced Operations and Supply Chain Management BUSI 3703
Various Professors Yorkville University
2.
9-197-076 R E V : J U L Y 5 , 2 0 0 1
________________________________________________________________________________________________________________
Professor Robert S. Kaplan prepared this note as the basis for class discussion.
Copyright © 1997 President and Fellows of Harvard College. To order copies or request permission to reproduce materials, call 1-800-545-7685, write Harvard Business School Publishing, Boston, MA 02163, or go to http://www.hbsp.harvard.edu. No part of this publication may be reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted in any form or by any means—electronic, mechanical, photocopying, recording, or otherwise—without the permission of Harvard Business School.
R O B E R T S . K A P L A N
Introduction to Activity-Based Costing
In this note, we introduce activity-based cost (ABC) systems. The motivation for ABC systems is simple to articulate. Consider two hypothetical and almost identical factories. Single Factory makes one million pens, all the same color: blue. Multi Factory also makes one million pens, but of many different colors, sizes, and varieties. This factory, in a typical year, produces about 2,000 different types (SKUs) of pens, ranging from specialty pens, with annual production volume as low as 50-100 per year, to higher-volume standard pens (blue and black), whose annual production volumes are each about 100,000 per year.
Even though both factories make the same basic product, Multi Factory requires many more resources to support its highly varied mix. Relative to the blue pen factory, Multi Factory would have much larger production support staff, requiring more people to schedule machines and production runs, perform setups, inspect items after setup, move materials, ship orders, expedite orders, rework defective items, design new products and improve existing products, negotiate with vendors, schedule materials receipts, order, receive, and inspect incoming materials and parts, and update and maintain the much larger computer-based information system. Multi Factory would also operate with considerably higher levels of idle time, setup time, overtime, inventory, rework and scrap. Since both factories have the same physical output, they would both have roughly the same cost of materials (ignoring the slightly higher acquisition costs in Multi Factory for smaller orders of specialty colors and other materials). For actual production, if you assume that all pens are of about the same complexity, both Single and Multi Factory would require the same number of direct labor hours and machine hours for actual production (not counting the higher idle time and setup times in Multi Factory). Multi Factory would likely also have about the same property taxes, security costs, and heating bills as Single Factory. But Multi Factory would have much higher indirect and support costs (i.e., overhead) because of its more varied product mix and complex production task.
Consider now the operation of a typical standard cost system in these two plants. Single Factory has little need for a cost system to calculate the cost of a blue pen. The financial manager, in any single period, can simply divide total expenses by total production volume to get the cost per blue pen produced. For Multi Factory, the costs of the indirect and support expenses would be traced to its various production cost centers. Once expenses are accumulated in each production center, they would be applied to products based on the cost driver for that cost center: direct labor, machine hours, units produced, or materials quantity processed. On a per unit basis, high-volume standard blue and black pens require about the same quantity of each of these cost drivers as the very low volume, specialty products. Therefore, Multi Factory’s overhead costs would be applied to products
F or
u se
o nl
y in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
5
197-076 Introduction to Activity-Based Costing
2
proportional to their production volumes. Blue and black pens, each representing about 10% of the plant’s output, would have about 10% of the plant’s overhead applied to them. A low volume product, representing only .01 of 1% of the plant’s output (100 pens per year), would have about .01 of 1% of the plant’s overhead allocated to it. Therefore, the standard costing system would report essentially identical product costs for all products, standard and specialty, irrespective of their relative production volumes.
Clearly, however, considerably more of Multi Factory’s indirect and support resources are required (on a per-unit basis) for the low-volume, specialty, newly designed products than for the mature, high-volume, standard blue and black pens. Traditional cost systems, even those with hundreds or thousands of production cost centers, will systematically and grossly under estimate the cost of resources required for specialty, low-volume products and will over estimate the resource cost of high volume, standard products (see Exhibit 1). The distortion in reported costs between standard and specialty products can be avoided only if the standard and specialty pens are manufactured on separate machines in different cost centers.
Abandoning the assignment of support resource costs entirely and moving to direct costing systems does not solve this problem. Under direct or marginal costing, blue and black pens, which have about the same materials and direct labor cost as the low-volume, specialty pens, will have the same variable costs. Also, direct costing systems fail to explain why the two factories with exactly the same physical units of production (e.g., one million pens) have dramatically different levels of “fixed costs.”
Activity-based cost systems extend traditional cost systems by linking resource expenses to the variety and complexity of products produced, not just the physical volumes produced. We can think of ABC as providing the answer to the following four questions:
1. Why is the organization spending money on indirect and support resources?
The answer to this question, of course, is that the spending on indirect and support resources is necessary because of the activities performed (for example, scheduling, purchasing, customer administration, and improving products) or the capabilities being supplied by these resources (such as information technology and suitable production and customer support space). So the focus has already shifted from how to allocate costs (the question answered by traditional cost systems) to why is the organization spending money in the first place (the ABC initial question). As the organization answers this initial question, it identifies the set of activities being performed by its indirect and support resources. Activities are described by verbs and objects: schedule production, move materials, purchase materials, inspect items, respond to customers, improve products, introduce new products, etc. The identification of activities culminates with construction of an activity dictionary that lists and defines all the major activities performed in the production facility.
In some initial applications, engineers and accountants defined activities at a very micro level, perhaps at an individual task level, leading to several hundred or more activities. This was both expensive and confusing. Now, ABC project teams use rules of thumb, such as to ignore activities that use less than 5% of an individual’s time or a resource’s capacity. Activity dictionaries can be relatively brief, say 10-30 activities, especially where the prime focus of the ABC system is to estimate product and customer costs. In other applications, ABC systems continue to be built with hundreds of activities. Typically, such highly detailed systems have been constructed to serve as the foundation for process improvement and process redesign efforts. The number of activities, therefore, is a function of the purpose of the model and the size and complexity of the organizational unit being studied.
F or
u se
o nl
y in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
6
Introduction to Activity-Based Costing 197-076
3
The second question answered by an ABC system is:
2. How much is the organization spending on each of its activities?
To answer this question, the ABC system maps, from resource expenses to activities, using resource cost drivers. The resource cost drivers link spending and expenses, as captured in the organization’s financial or general ledger system, to the activities performed. Resources are the initial building block of both traditional and ABC cost systems.
Classifying resource expenses by activities performed accomplishes a 90° shift in thinking about expenses (see Exhibit 2).
Data from the organization’s financial system categorizes expenses by spending code; for example, salaries, fringe benefits, overtime, utilities, indirect materials, travel, telecommunications, computing, maintenance, and depreciation. The resource cost drivers (see Exhibit 3) collect expenses from this financial system and drive them to the activities being performed by the organizational resources. Thus, after going through this step, organizations learn, usually for the first time, how much they are spending on activities like purchase materials, and introduce new products.
The actual mechanics of selecting resource cost drivers and estimating the quantity of each resource cost driver are reasonably well documented in several books that describe the details of implementing ABC systems. Typically, the ABC analyst interviews or surveys employees. They may give employees a survey form with the activity dictionary, and ask them to estimate the percentage of time they spend on any activity (in excess, say, of 5% of their time) on the list.
For nonpersonnel resources, the ABC project team either relies on direct measurement (how much power, computer or telecommunications time) or estimates the percentage of the resource used by each activity in the dictionary. ABC systems, like traditional systems, drive expenses to production cost centers—where the activity is part of the actual product conversion process like fabricate parts, mix chemicals, or assemble products. But, in addition, the ABC system drives operating expenses to activities that are not directly involved in converting materials into intermediate and finished products, like setup machines, schedule production runs, and perform engineering change notices. Traditional cost systems, in contrast, drive the expenses of such activities to production cost centers where they get arbitrarily allocated to products proportional to production volumes.
One does not need extensive time-and-motion studies to link resource spending to activities performed. The goal is to be approximately right, rather than precisely wrong, as are virtually all traditional product costing systems. Many traditional standard cost systems calculate product costs out to six significant digits ($5.71462 per unit) but, because of arbitrary allocation procedures, the first digit is wrong.
Hierarchy of Activities
Once resource costs have been traced to activities, managers get powerful insights from identifying critical attributes of the activities. One of the most important attributes classifies manufacturing activities along a cost hierarchy dimension: unit, batch, and product, customer, and facility sustaining.
Unit-level activities are activities performed for every unit of product or service produced. The quantity of unit-level activities performed is proportional to production and sales volumes. Examples include drilling holes in metal parts, grinding metal, and performing 100% inspection.
F or
u se
o nl
y in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
7
197-076 Introduction to Activity-Based Costing
4
Traditional cost systems, which use allocation bases such as labor hours, machine hours, units produced, or sales dollars to assign indirect costs to cost objects, rely exclusively on unit-level cost drivers. One of the principal differences between activity-based and traditional cost systems is the use of non-unit cost drivers (e.g., batch, product sustaining) for assigning resource costs to products and customers.
Batch-level activities are those performed for each batch or setup of work performed. Batch activities include setting up a machine for a new production run, purchasing materials, and processing a customer order.
The resources required for a batch-level activity are independent of the number of units in the batch (number of components produced after a setup, number of items in a purchase order, or the number of products in a customer shipment). Activity-based cost systems measure and assign the cost of handling production orders, material movements, setups, customer orders, and purchasing to the products, customers, and services that triggered the activity.
Product-sustaining activities are performed to enable the production of individual products (or services) to occur. Extending this notion outside the factory leads to customer-sustaining activities that enable the company to sell to an individual customer but that are independent of the volume and mix of the products (and services) sold and delivered to the customer. Examples of these product- and customer-sustaining activities include maintaining and updating product specifications, special testing and tooling for individual products and services, and technical support provided for individual products and to service individual customers.
Product- and customer-sustaining activities are easily traced to the individual products, services, and customers for whom the activities are performed. But the quantity of resources used in product- and customer-sustaining activities are, by definition, independent of the production and sales volumes and quantity of production batches and customer orders. Traditional cost systems, relying only on unit-level drivers, cannot trace product and customer-sustaining resources to individual products and customers.1
The ABC cost hierarchy enables all organizational expenses to be mapped to a particular hierarchical or organizational level where cause and effect can be established. That is a customer- sustaining expense is not allocated to the products or services purchased by that customer, since this expense is incurred independent of the volume and mix of products or services acquired by this customer. The customer-sustaining expense can be avoided or controlled only by operating at the customer level (dropping the customer, changing the level of support provided to the customer), not by changing the volume or mix of the individual products and services the customer acquires.
The batch, product-sustaining, and customer-sustaining categories give powerful insights into why two facilities, like the two pen factories, that have identical total physical outputs could have drastically divergent cost structures. Both Single (blue pen) Factory and Multi Factory have the same quantity of unit-level activities, since they have the same physical output of 1 million pens per year. They also likely have the same level of facility-sustaining expenses (assuming that all non-
1 Beyond unit, batch, product, and customer-sustaining activities, other resources supply capabilities that could not be traced to individual products and customers. Some activities, such as product development and advertising, can be classified as brand or product-line sustaining since they support an entire brand or product line. Others provide general production or sales capabilities. Facility-sustaining expenses, such as a plant manager and administrative staff, and channel-sustaining expenses—trade shows and advertising, catalogs—can not be traced to individual products, services, or customers. The expenses of product-line, facility, and channel resources can be assigned directly to the individual product-lines, facilities, and channels but should not be allocated down to individual products, services, or customers within these product lines, facilities, and channels.
F or
u se
o nl
y in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
8
Introduction to Activity-Based Costing 197-076
5
manufacturing costs occur outside the factories). But Multi Factory, producing thousands of products, ranging from low-volume, specialty products to high-volume blue and black pens, requires far more resources than Single Factory to perform the additional batch and product-sustaining activities required by the many different products and production runs.
In summary, at the end of the second phase of building an ABC model, the organization knows expenses characterized by activities performed. Already at this stage, organizations have new information that can be used for a range of activity and process improvement actions. But before turning to how ABC information can be used, let’s continue with the construction of the first full ABC model. For the next phase, we answer a third question about why ABC?
3. Why is the organization performing activities?
Answering the first two questions identifies the activities being performed and the cost of performing those activities. The answer to the third question, of course, is that the organization has to perform activities to design, build, and deliver products and services to its customers. Therefore, in answering this third question, the ABC project team identifies all the organization’s products, services, and customers. Initially, since we are focusing on analyzing the indirect and support costs of manufacturing facilities, we will focus on driving costs to products, deferring the assignment of activity costs to services and customers to later in the course.
The answer to question number 3 was simple, though even asking this question has eluded some practitioners of activity-based costing. These practitioners have focused only on how to make activities and processes more efficient, but have not asked the more fundamental question as to whether these activities or processes are worth doing. Is the organization getting paid adequately for performing these activities? To determine whether the organization is being compensated for performing activities requires that activity costs be linked to the products, services, and customers who are the ultimate beneficiaries of the organization’s activities. Addressing this issue leads naturally to the fourth question to which ABC systems provide the answer.
4. How much of each activity is required for the organization’s products, services, and customers?
The linkage between activities and cost objects, such as products, services, and customers, is accomplished using activity cost drivers. An activity cost driver is a quantitative measure of the output of an activity. Examples of typical activity cost drivers for particular activities are shown on the list below:
Activity Activity Cost Driver
Run machines Number of machine hours Setup machines Number of setups or setup hours Schedule production jobs Number of production runs Receive materials Number of material receipts Support existing products Number of products Introduce new products Number of new products introduced Maintain machines Number of maintenance hours Modify product characteristics Number of engineering change notices Fo
r us
e on
ly in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
9
197-076 Introduction to Activity-Based Costing
6
Exhibit 3 shows the overall structure of an activity-based cost model, linking one resource—indirect labor—to the activities performed and then, via activity cost-drivers, to cost objects, such as products.
Selecting Activity Cost Drivers
The selection of an activity cost driver reflects a subjective trade-off between accuracy and the cost of measurement. Because of the large number of potential activity-to-output linkages, designers attempt to economize on the number of different activity cost drivers. For example, activities triggered by the same event—prepare production orders, schedule production runs, perform first part inspections, and move materials—all can use the same activity cost driver: number of production runs or lots produced.
ABC system designers can choose from three different types of activity cost drivers:
Types of Activity Cost Drivers
1. Transaction
2. Duration
3. Intensity or Direct charging
Transaction drivers, such as the number of setups, number of receipts, and number of products supported, count how often an activity is performed. Transaction drivers can be used when all outputs make essentially the same demands on the activity. For example, scheduling a production run, processing a purchase order, or maintaining a unique part number may take the same time and effort independent of which product is being scheduled, which material is being purchased, or which part is being supported in the system.
Transaction drivers are the least expensive type of cost driver but could be the least accurate, since they assume that the same quantity of resources is required every time an activity is performed; that is, the activity is homogeneous across products. For example, the use of a transaction driver like the number of setups assumes that all setups take the same time to perform. For many activities, the variation in use by individual cost objects is small enough that a transaction driver will be fine for assigning activity expenses to the cost object. If, however, the amount of resources required to perform the activity varies considerably, from product to product, then more accurate and more expensive cost drivers are required.
Duration drivers represent the amount of time required to perform an activity. Duration drivers should be used when significant variation exists in the amount of activity required for different outputs. For example, simple products may require only 10-15 minutes to setup, while complex, high-precision products may require 6 hours for setup. Using a transactions driver, like number of setups, will overcost the resources required to setup simple products and will undercost the resources required for complex products. To avoid this distortion, ABC designers would use a duration driver, like setup hours, to assign the cost of setups to individual products.
Examples of duration drivers include setup hours, inspection hours, and direct labor hours. For materials movement, distance moved can be viewed as a duration driver; distance acts as a proxy for the time taken to move materials from one point to another. In general, duration drivers are more accurate than transactions drivers, but they are much more expensive to implement since the model requires an estimate of the duration each time an activity is performed. With only a transaction driver (number of setups), the designer would only need to know how many times a product was setup,
F or
u se
o nl
y in
th e
co ur
se A
dv an
ce d
O pe
ra tio
ns a
nd S
up pl
y C
ha in
M an
a t Y
or kv
ill e
U ni
ve rs
ity ta
ug ht
b y
V ar
io us
P ro
fe ss
or s
fr om
O ct
ob er
0 7,
2 01
9 to
O ct
ob er
0 7,
2 02
2.
U se
o ut
si de
th es
e pa
ra m
et er
s is
a c
op yr
ig ht
v io
la tio
n.
10
Introduction to Activity-Based Costing 197-076
7
information that should be readily available from the production scheduling system. Knowing the setup time for each product is an additional, and more costly, piece of information. The choice between a duration and a transactional driver is, as always, one of economics, balancing the benefits of increased accuracy against the costs of increased measurement.
For some activities, however, even duration drivers may not be accurate. Intensity drivers directly charge for the resources that are used each time an activity is performed. Continuing with our setup example, a particularly complex product may require special setup and quality control people, as well as special gauging and test equipment each time the machine is setup to produce the product. A duration driver, like setup cost per hour, assumes that all hours are equally costly, but does not reflect extra personnel, especially skilled personnel and expensive equipment that may be required on some setups but not others. In these cases, activity costs may have to be charged directly to the output, based on work orders or other records that accumulate the activity expenses incurred for that output.
Intensity drivers are the most accurate activity cost drivers but are the most expensive to implement; in effect they require direct charging via a job order costing system to keep track of all the resources used each time an activity is performed. They should be used only when the resources associated with performing an activity are both expensive and variable each time an activity is performed.
The choice among a transaction, duration, or direct charging (intensity) cost driver can occur for almost any activity. For example, for performing engineering change notices (to upgrade and support existing products), we could use:
• cost per engineering change notice (assumes every ECN consumes the same quantity and cost of resources),
• cost per engineering change hour used for the ECN done for an individual product (allows for ECNs to use different amounts of time to perform but assumes every engineering hour costs the same), or
• cost of engineering resources actually used (number of engineering hours, price per hour of engineers used, plus cost of equipment such as engineering workstations) on the job.
Similarly for a sales activity, like support existing customers, we could use either a transaction, duration, or intensity driver; e.g.,
• cost per customer (assumes all customers cost the same)
• cost per customer hour (assume different customers use different amounts of sales resource time, but each hour of support time costs the same)
• actual cost per customer (actual or estimated time and specific resources committed to specific customers).